El Sewedy Electric Company · EGX:SWDY

El Sewedy Electric — Investor Presentation (June 2010)

24 slides from El Sewedy Electric's investor presentation, June 2010

  1. Slide 1: Investor Presentation

    Investor Presentation June 2010 1

  2. Slide 2: Disclaimer

    Disclaimer This document has been prepared by El Sewedy Cables (the “Company”) solely for the use at the investor presentation, and must be treated confidentially by attendees at such a• presentation. The information contained in this document has not been independently verified and no representatio

  3. Slide 3: Agenda

    Agenda I. El Sewedy Cables Overview II. Operational Overview III. Annex 3

  4. Slide 4: Integrated Power Play

    Integrated Power Play Energy Generation Transmission & Distribution ...Servicing 3 end-user markets... Infrastructure Building Sector Industrial Sector • Energy, Telecom & Railway • Homes, Public Buildings & Factories • Petroleum & Automotive Industry 4

  5. Slide 5: Worldwide Presence with Diversified Operations

    Worldwide Presence with Diversified Operations (1) Spain Slovenia Qatar India Production Facilities • 2010 Capacity:100 units • Electrometers Capacity: 2.5 mn • Electrometers Capacity: 1.5 mn • Cables Capacity: 18,000 tons meters Export Destinations meters Saudi Arabia • Cables Capacity: 33,000 tons

  6. Slide 6: Operational Strategy

    Operational Strategy Regional Focus with Aggressive Sales Driven Attractive Solid Leverage localized production Expansions Approach Profitability Position Centers •Targeting attractive • First mover advantage • Quality at the • Expanding in high •Growth financed infrastructure spending • Greenfield

  7. Slide 7: Business Model that Survives Current Global Economic Crisis

    Business Model that Survives Current Global Economic Crisis Operating in Countries with Underdeveloped Infrastructure Diversification of Products and Markets ƒ Emerging markets infrastructure projects still ƒ Full range of products and services for the on track energy industry ƒ Underdeveloped infra

  8. Slide 8: Leading the Way as an Integrated Power Player

    Leading the Way as an Integrated Power Player ƒ Acquisition of 97% of ƒ Syria’s 1st high Iskraemeco, a leading voltage cables Slovenian electrometer factory ƒ Egypt’s 1st factory for producer producing copper rods ƒ Ghana’s 1st road lighting poles ƒ The 1st factory in production facility 2007 Africa

  9. Slide 9: Recent Developments - Acquisitions

    Recent Developments - Acquisitions Acquired Company Country Acquisition Date Stake Acquired Strategic Rationale ƒ Acquiring an internationally recognized brand name in the field of electrometers production ƒ Gaining access to the technological know how Electrical of electrometers production Slovenia

  10. Slide 10: Agenda

    Agenda I. El Sewedy Cables Overview II. Operational Overview III. Annex 10

  11. Slide 11: Wires & Cables – Growth Strategy

    Wires & Cables – Growth Strategy Existing Capacity Strategic Rationale (‘000 tons) Exp. Completion Date ƒ El Sewedy is the market leader; Egypt 115 completed Low cost manufacturing base; Export hub ƒ 15% Tariffs on imports; Market Algeria deficit; Tax exemption; Under 18 completed developed infrastr

  12. Slide 12: Attractive Industry Fundamentals

    Attractive Industry Fundamentals Government Spending as % of GDP 2006 Electricity Capacity (bn TWh) 2007A 2008E 2009E 40 37 50% 35 29 30 45% 25 23 20 15 40% 15 11 10 8 7 35% 6 6 5 4 4 3 3 5 2 2 1 1 30% - Sudan Kuwait KSA Algeria Syria Libya Iraq Lebanon Jordan Egypt Tunisia UAE Iran Morocco Oman Bah

  13. Slide 13: Transformers – Growth Strategy

    Transformers – Growth Strategy Existing Capacity Strategic Rationale (MVA) Exp. Completion Date ƒ First & only producer of Egypt power transformers in the completed region; Low cost 8550 manufacturing base; Export hub ƒ First & only Transformers producer; Net Importer; Zambia Partnership with the 45

  14. Slide 14: Engineering & Contracting - Overview

    Engineering & Contracting - Overview ƒ Huge contracting projects implemented both in Egypt and internationally ƒ This segment offers clients a 1 stop solution whereby El Sewedy Group undertakes large projects including supplying, planning, designing, and contracting of large projects ƒ 99% of backlo

  15. Slide 15: Wind Energy Generation – Overview

    Wind Energy Generation – Overview Overview Production Facilities Target Market ƒ The most important component in wind energy Wind Turbines generation ƒ Acquisition of M. Torres Olvega provided El Sewedy ƒ Egypt & Spain ƒ Egypt & North with access to turbine production technology as well as (through

  16. Slide 16: Wind Energy Generation – Growth Strategy

    Wind Energy Generation – Growth Strategy El Sewedy Egypt Turbines Production Capacity (MW) M Torres Total Production Capacity (MW) 500 435 300 266 450 400 250 233 350 323 191 300 200 165 165 250 150 200 165 100 86 150 83 100 50 50 0 0 2010e 2011e 2012e 2013e 2008a 2009e 2010e 2011e 2012e 2013e Turbi

  17. Slide 17: Wind Energy Generation – Attractive Industry Fundamentals

    Wind Energy Generation – Attractive Industry Fundamentals Global Power Generation Investment (US$ bn) Global Energy Consumption by Type 1,200 960 Natural Gas, 23% 1,000 950 Coal, 25% Nuclear Energy, 800 6% Biomass 49.0% HEP 36.0% 600 410 Solar 6.0% 400 340 Wind 4.0% RE, 8% 200 Geothermal 2.5% 180 17

  18. Slide 18: Agenda

    Agenda I. El Sewedy Cables Overview II. Operational Overview III. Annex 18

  19. Slide 19: Worldwide Presence with Geographically Diversified Operations

    Worldwide Presence with Geographically Diversified Operations Geographical Revenue Breakdown (2009) Export Revenue Breakdown (2009) Int. Operations, 20.90% Local Sales, GCC, 54% 35.70% Levant, 1% Others, 1% Exports, 43.30% Europe, 6% Africa, 38% Sales By Customer E le c t ric a l Ut ilit y 65% C o n

  20. Slide 20: Power Generation Industry Overview

    Power Generation Industry Overview Global Cables Production Volume (‘000 tons) North America Europe North East Asia Rest of the World 18,000 14,812 15,582 14,071 14,113 14,130 16,000 13,331 13,790 12,733 14,000 12,000 10,000 8,000 6,000 4,000 2,000 0 2005 2006 2007 2008 2009 2010 2011 2012 Global In

  21. Slide 21: Wind Energy Generation – Attractive Industry Fundamentals

    Wind Energy Generation – Attractive Industry Fundamentals Egypt Wind Capacity (MW) Breakdown of MEA Capacity (2007) 6000 5,410 5000 Others T unisia 3.2% 3.7% 4000 Iran 12.5% 3000 Egypt 57.6% 2000 850 Morocco 1000 630 310 430 23.0% 98 145 145 230 68 0 2002 2003 2004 2005 2006 2007 2008 2009 2010 2020

  22. Slide 22: Consolidated Financial Highlights

    Consolidated Financial Highlights Financial Highlights – Consolidated Income Statement Figures in millions 2007 2008 2009 Q1 2009 Q1 2010 Sales Wire & Cable 8,468,463 9,211,398 7,437,594 1,893,394 2,449,903 Electrical Products 222,063 1,194,124 993,160 239,957 263,917 Turnkey Projects 657,750 1,040,

  23. Slide 23: Consolidated Financial Highlights

    Consolidated Financial Highlights Sales (LE ‘000) Wire & Cable Electrical Products Turnkey Projects 1400000% 1200000% % 11,445 R 31.9 CAG 9.1% 1000000% 10.4% 9,290 9.3% 800000% 9348 7% 10.7% 5746 600000% 5% 2.3% 2% 400000% 3168 2323 2% 80.5% 80.1%% 90.5% 7.5% 1% 3% 93% 200000% 9% 3% 95% 83.5% 96% 0%

  24. Slide 24: Consolidated Financials Highlights

    Consolidated Financials Highlights Pro Forma Consolidated – Balance Sheet Figures in millions 2007 2008 2009 Q1 2010 Fixed Assets 1,170,861 2,758,299 3,728,647 3,894,500 Investments 313,789 414,266 372,687 34,124 Other Long term Assets & Goodwill 63,908 68,843 524,281 517,716 Total Long Term Assets