Harte Gold — Investor Presentation (July 2010)
18 slides from Harte Gold's investor presentation, July 2010
Slide 1: Harte Gold Corp. - Gold Exploration in the Hemlo Camp
H Harte G Gold ld C Corp. Gold Exploration in the Hemlo Camp Ontario,, Canada Investor Presentation July 2010
Slide 2: Property Locations
Property Locations Canada’s Prolific Abitibi - Wawa Greenstone Belt Ontario Quebec Sugar Zone Stoughton-Abitibi Hemlo Timmins Island Gold Holloway Val d‘Or Eagle River Rouyn-Noranda Kirkland Lake
Slide 3: Sugar Zone
“S Sugar ga Zone ” Th principal The i i l assett off the th Company C is i the th Sugar S Zone Property located 60 kms east of Hemlo, Ontario The Sugar Zone contains an NI 43- 43-101 compliant inferred resource of 284,000 ounces grading 9.75 g/t gold April / May 2010 diamond drill program conf
Slide 4: Sugar Zone Gold Deposit
Sugar Zone Gold Deposi os Trench 2 6.95 git / 3S.68nn Trench = Trench 3 ¥.37 git s 5.76m 3.66 grt ¢4.20m Trench 4 6.14 g/t / 2.20m Sugar Zone: Section 130+00M (130 Shoot area), facing grid south, showing weighted average gold values used in resource estimate.
Slide 5: Resource model – expansion potential
Resource model – expansion potential
Slide 6: Sugar Zone resource outline and sampling map
Legend Resource outline 87.8g/t Au DEPOSIT ZONE Claim boundary RESOURCE OUTLINE 284,000 oz Au 2009 Outcrop Sample 30.4g/t Au 7K STRUCTURE 2009 Float Sample p 87.8g/t Au 9.04g/t Au 1 km N 30.4g/t Au Harte Gold Corp S Sugar Z Zone Geology 2009 Sampling Mafic Volcanics Granite Ultramafic
Slide 7: Drill Targets To Expand Resource
Drill Targets To Expand Resource Area 1 • Virtually no drilling • Numerous untested IP anomalies • 2.3 km untested strike length • Source of mineralized boulders unknown • Zone remains open to the Northwest SUGAR ZONE GOLD RESOURCE OUTLINE 284,000 oz Au Area 2 • Shallow drill testing over 1.3 km str
Slide 8: Sugar Zone intersected at Depth April 2010
Sugar Zone intersected at Depth April 2010 multiple VG SZ 103 LZ VG (8.35 g/t over 1.76m incl. 18.13 g/t over 0.62m)
Slide 9: Significant results from 2010 drilling
Si ifi Significant t results lt from f 2010 d drilling illi Hole # From To Width Grade VG SZ10--102LZ SZ10 363.10 363.94 0.84 15.25 Yes SZ10– SZ10 –105LZ 35.89 35 89 39.09 39 09 3.20 3 20 24 71 24.71 Y Yes SZ10– SZ10 –106LZ 39.82 45.27 3.23 8.02 Yes SZ10– SZ10 –107LZ 44.97 48.03 3.06 12.45 Yes SZ10-
Slide 10: Sugar Zone intersected at Depth April 2010
Sugar Zone intersected at Depth April 2010 multiple VG
Slide 11: Sugar Zone intersected at Depth April 2010
Sugar Zone intersected at Depth April 2010 multiple VG
Slide 12: Sugar Zone Intersected 500m south of main deposit
Sugar Zone Intersected 500m south of main deposit SZ09 SZ09--96 Visible Gold (8.49 g/t 0.61m)
Slide 13: Sugar Zone - Blue Sky Potential
Sugar Zone - Blue Sky Potential • Recent drill program confirms Sugar Zone extension at depth 0.59% Zn over 1.8 ft • Numerous targets have been identified Shear Zone py, po, minor cpy 0.47% Zn over 2.8 ft over extensive land Trench values to 7.2 gpt Au package 0.33% Ni over 5.0 ft or Grab sample of
Slide 14: Experienced Management Team
Experienced Management Team Stephen G G. Roman Roman, President and CEO over 30 years in mineral exploration and finance, has identified, developed and brought into commercial production a number of mining and oil and gas projects. Responsible for Gold Eagle discovery at Exall Resources and subseq
Slide 15: Share Capital
Share Capital p HRT – TSXV (July 26, 2010) Common Shares 128,274,169 Warrants 26,792,366 Options 12,250,000 Fullyy Diluted 167,316,535 , ,
Slide 16: Share Price / Trading
Share Price / Trading ( July 26, 2010)
Slide 17: Next Steps
N t St Next Steps Sugar Zone • Update 43- 43-101 to include Spring 2010 drill results • line cutting and induced polarization • Sampling & trenching of high grade zones found in 2009 • Economic assessment of property for underground mining • design and tender of two rig drill program to focus on exp
Slide 18: Harte Gold Corp.
Harte Gold Corp. Gold Exploration in the Hemlo Camp Ontario, Canada July 2010