Firefox Gold Corp. · TSXV:FFOX
Firefox Gold — Investor Presentation (February 2020)
27 slides from Firefox Gold's investor presentation, February 2020
Slide 1: Gold Discovery in Finland
Gold Discovery in Finland FEBRUARY 2020 TSX-V: FFOX FSE: A2PDU7
Slide 2: Disclaimers
DISCLAIMERS 2 Readers Advisory This corporate presentation (the “Presentation”) has been prepared by management of Firefox Gold Corp. (the “Corporation”) as of October 2019, and is based on public information and the Corporation’s publicly available information. This Presentation is for information
Slide 3: Forward Looking Statements
FORWARD LOOKING STATEMENTS 3 Forward Looking Information Both these slides and the accompanying oral presentation (if any) may contain certain forward-looking statements within the meaning of the United States Private Securities Litigation Reform Act of 1995 and forward-looking information within th
Slide 4: Investment Highlights
INVESTMENT HIGHLIGHTS 4 Tight structure of a newly listed company Innovative Platform Paired with a strategy built over time Focused solely on gold in Finland A balance of technical and financial strengths: Competitive Advantage Seasoned gold industry leadership Paired with deep Finland expertise Fi
Slide 5: Tailor-built to make significant gold discoveries in Finland
Innovative Platform TAILOR-BUILT TO MAKE SIGNIFICANT GOLD DISCOVERIES IN FINLAND 5 Conceptualized over a decade ◆ Created in 2017 ◆ Actively exploring since ◆ IPO in December 2018 Share Structure @ November 20th, 2019 Issued & 43.2M Warrants 15.6M Options 3.5M Fully Diluted 62.3M Outstanding Share C
Slide 6: Competitive Advantage Leadership – A Balance of Financial, Market & Technical Strength
Competitive Advantage Leadership – A Balance of Financial, Market & Technical Strength 6 Carl Löfberg, CEO & Director, MSc Andrew MacRitchie, CPA, CA, CFO Has a Master’s degree in Industrial Economics and broad experience Mr. MacRitchie is a Chartered Public Accountant who has held in business consu
Slide 7: Central Lapland Greenstone Belt - Big Mines Could Be Coming
CENTRAL LAPLAND GREENSTONE BELT - BIG MINES COULD BE COMING! 7 Long history of gold exploration produced log normal distribution of gold deposits in similar sized belts2 Abitibi Greenstone Belt • 39 gold deposits • 83.6 Moz in resources Norseman – Wiluna Greenstone Belt (W.Australia) • 44 gold depos
Slide 8: Commanding Positions in Northern Finland
Ripe for Discovery COMMANDING POSITIONS IN NORTHERN FINLAND 8 The Central Lapland Only 5 companies actively Greenstone Belt Kittilä exploring for gold3 in the -A major belt in need CLGB. Saattapora of major exploration FireFox controls ~500 km2 - Kevitsa a significant portion of the Kittilä Pahtavaa
Slide 9: Jeesiö Gold Project – New Area of Intense Exploration & Discovery
JEESIÖ GOLD PROJECT – NEW AREA OF INTENSE EXPLORATION & DISCOVERY 9 Risti (Aurion) Jeesio hosts multiple orogenic gold targets with significant historic investment5. Extensive gold in till anomalies from Utsamo Target historic surveys aided identification4. The new target areas are defined by interp
Slide 10: Jeesiö - Utsamo Target: High Priority Target from New Structural Interpretations
JEESIÖ - UTSAMO TARGET: HIGH PRIORITY TARGET FROM NEW STRUCTURAL INTERPRETATIONS 10 Magnetic survey results identified a Risti (Aurion) 2.8 km long structurally distinct zone within the 5km strike of what is believed to be part of the Sirkka Shear. The Utsamo target hosts an important flexure in the
Slide 11: Jeesiö - Current Program, Utsamo Target
JEESIÖ - CURRENT PROGRAM, UTSAMO TARGET 11 FireFox completed a reconnaissance diamond drilling program at Utsamo in the fall of 2019. 3 holes were drilled (446 m total depth) testing just 180 m of strike. The drill program confirmed the shear zone in the sub-surface for the first time. Additional ge
Slide 12: Jeesiö - Katajavaara Target: Newest High-Priority Target with Gold Showings
JEESIÖ - KATAJAVAARA TARGET: NEWEST HIGH-PRIORITY TARGET WITH GOLD SHOWINGS 12 Historic heavy indicator mineral samples by Outokumpu Oy in the 1980’s identified a strong anomaly that was never followed-up. This included several 20kg samples with +50 gold particles, well above background. FireFox com
Slide 13: Mustajärvi Gold Project: Historic Target with New Expanded Potential
MUSTAJÄRVI GOLD PROJECT: HISTORIC TARGET WITH NEW EXPANDED POTENTIAL 13 150 hectare granted Exploration Permit and 1,372 new hectares of exploration reservations, (Sept 2018) 100% owned - Along the key Venejoki Thrust Zone, with highway access - Extensive historic database including till anomalies f
Slide 14: Mustajärvi Gold Project: Drill Target Delineation Program
MUSTAJÄRVI GOLD PROJECT: DRILL TARGET DELINEATION PROGRAM 14 Chip channel sampling along two intersecting mineralized structures in the Central Zone identified high-grade gold. - Results expand the range of possible drill targets & the overall size potential of the gold system - Consistent mineraliz
Slide 15: Mustajärvi Gold Project: Diamond Drilling Program Summary
MUSTAJÄRVI GOLD PROJECT: DIAMOND DRILLING PROGRAM SUMMARY 15 • Phase 1 Program (8 holes, ~1,100 m): • Confirmed historic results in Central Zone • Hit 22.89 g/t Au over 3.95m, including 2m @ 45 g/t Au in 18MJ002 • Discovered new style of high-grade gold at depth CENTRAL ZONE • Encountered first mine
Slide 16: Mustajärvi Gold Project: 3-D Drill Hole Rendering (view from S)
MUSTAJÄRVI GOLD PROJECT: 3-D DRILL HOLE RENDERING (view from S) 16 Expansion potential at depth and along strike CENTRAL ZONE Holes 19MJ006, 19MJ005 intercepted Au 500m NE of the Central Zone, incl. Hole 18MJ010 Drilled 12 g/t Au over 1.95m Under Historic Holes – Intersects 5 m @ 18 g/t Au, includin
Slide 17: Seuru Gold Project – Similarities to Europe's Largest Gold Mine
SEURU GOLD PROJECT – SIMILARITIES TO EUROPE’S LARGEST GOLD MINE 17 Kittila Mine – Agnico Eagle Multiple targets identified by combining historic GTK sampling & drilling, plus historic geophysics and till sampling. Similar geology to Kittila Mine, (Agnico Eagle) Europe’s largest gold mine, extends on
Slide 18: Seuru Gold Project – Sarvilehto Target, Au in Heavy Mineral Sample
SEURU GOLD PROJECT – SARVILEHTO TARGET, AU IN HEAVY MINERAL SAMPLE 18 GTK drill results from 2009 intersected up to 3.57 g/t Au over 0.45 m (U441/2009/R8)4. Micro panning of a 10kg heavy mineral sample revealed 118 gold micronuggets resulting in anomalous Au and As - a clear indication of Au prospec
Slide 19: 2019 H2 Milestones & 2020 H1 Exploration Goals
2019 H2 MILESTONES & 2020 H1 EXPLORATION GOALS 19 JUL AUG SEP OCT NOV DEC JAN FEB MAR APR MAY JUNE Bedrock mapping & sampling – Jeesiö Drilling – Jeesiö (Utsamo target) Trenching – Jeesiö (Homelampi target) Drilling - Mustajärvi Phase II Drill Data Compilation & Interpretation (Jeesiö & Mustajarvi)
Slide 20: Summary: Gold Discovery in Finland
SUMMARY 22 GOLD DISCOVERY IN FINLAND One of the few true “new” emerging gold belts. A major player in a new terrain charged with discovery potential…holding key lands with advanced targets. Proving ourselves as one of the fastest movers in Finland – experts on the mining law and extreme leverage on
Slide 21: FireFox Gold Contact Details
FireFox Gold Contact Details OFFICE ADDRESS: EMAIL: FireFox Gold Corp. info@firefoxgold.com Suite # 650 - 1021 West Hastings Street TELEPHONE: Vancouver, BC V6E 0C3 Canada 604.558.7687 23 TSX-V: FFOX FSE: A2PDU7
Slide 22: Supplementary Information
2 2 SUPPLEMENTARY INFORMATION
Slide 23: Mustajärvi Gold Project: 3-D Drill Hole Rendering (Phase I, view from SW)
MUSTAJÄRVI GOLD PROJECT: 3-D DRILL HOLE RENDERING (PHASE I. VIEW FROM SW) 23 CENTRAL ZONE OF HISTORIC DRILLING HOLE 18MJ002 Intersects 4.1 m @ 1.87 g/t gold HOLE 18MJ010 Drilled Under Historic Holes – Intersects 5 m @ 18 g/t Au, including 2 m @ 45 g/t Au
Slide 24: Mustajärvi Gold Project: Phase 1 Drilling Details
MUSTAJÄRVI GOLD PROJECT: PHASE 1 DRILLING DETAILS 24 1,094.5 m, 8-hole program completed in the Central Zone Goals: Confirm historic drilling and test depth and lateral extensions Table 1. Summary of Drill Intercepts Easting Northing Azimuth Plunge Depth From Interval Gold Co Drill Hole To (m) (metr
Slide 25: Mustajärvi Gold Project: High Grade Interval
MUSTAJÄRVI GOLD PROJECT: HIGH GRADE INTERVAL 25
Slide 26: Properties and Commitments
PROPERTIES AND COMMITMENTS 26 WHOLLY OWNED PROPERTIES ~1,500 km2 of Applications, Reservations & Claims, Permit Status Wholly-Owned or Optioned with Favourable Terms Project (Property) Ownership ER PA EP Total km2 Seuru (Selka) 100% 1 22.7 Central Lapland Greenstone Belt: Seuru (Kuolovaara) 100% 1 5
Slide 27: References – Sources & Disclaimers
REFERENCES – SOURCES & DISCLAIMERS 27 1 Calculated from closing price February 11, 2020. Third party financial data and share capital from recent financials and/or corporate websites: Aurion Resources, Sept. 30 2019 Financials & www.aurionresources.com ; Rupert Resources, www.rupertresources.com @Fe