Lahontan Gold Corp. · TSXV:LG

Lahontan Gold — Investor Presentation (September 2025)

27 slides from Lahontan Gold's investor presentation, September 2025

  1. Slide 1: Nevada's Santa Fe Gold Mine: On Track to Production

    September 2025 Presentation Nevada’s Santa Fe Gold Mine: On Track to Production TSX.V-LG; OTCQB-LGCXF; FSE -Y2F

  2. Slide 2: Disclaimers

    Disclaimers Information Contained In This Presentation This presentation (the “Presentation”) has been prepared by Lahontan Gold Corp. (the “Company”) solely for informational purposes. None of the Company, its affiliates or any of their respective employees, directors, officers, contractors, adviso

  3. Slide 3: Lahontan Corporate Snapshot

    L A H O N TA N CO R PO R AT E S NA P S H OT SHARE STRUCTURE Proforma Shares Outstanding (Shares) 286.7 M LAHONTAN Market Capitalization (C$M) Basic: $40.1M SHAREHOLDERS FD: $56.8M Warrants 14.0M @ 18 cents 92.4M total 25.0M @ 12 cents 28.5M @ 10 cents 24.9M @ 8 cents KEY SHAREHOLDERS: Options 26.6M

  4. Slide 4: Management & Board

    MANAGEMENT & BOARD FOUNDER FOUNDER KIMBERLY ANN, FOUNDER BRIAN MAHER, FOUNDER EXECUTIVE CHAIR, CEO, PRESIDENT VICE PRESIDENT - EXPLORATION EVAN PELLETIER JOSH SERFASS SHANE WILLIAMS JOHN MCNEICE MAX PLUSS INDEPENDENT DIRECTOR INDEPENDENT DIRECTOR INDEPENDENT DIRECTOR CHIEF FINANCIAL OFFICER INDEPEND

  5. Slide 5: Large-Scale Gold Oxide Deposits

    L A RG E - S C A L E G O L D OX I D E D E PO S I TS WALKER LANE, NEVADA USA G O L D & S I LV E R A S S E T S I N T H E WA L K E R L A N E FLAGSHIP S AT E L L I T E HIGH GRADE SANTA FE MINE WEST SANTA FE MOHO MINE PA S T P R O D U C E R S AT E L L I T E A S S E T G O L D & S I LV E R o OPEN PIT, HEAP

  6. Slide 6: Investment Highlights

    Investment Highlights ! ! Producing Gold Mines WALKER LANE, NEVADA Top Rated Mining 100% Owned N E V A D A Jurisdiction Fondaway The 100% owned Borealis mine is ! Reno Nevada is the world’s top rated mining jurisdiction as fully equipped for present mine Canyon operations and future expansion: acces

  7. Slide 7: Updated Resource Estimate

    U P DAT E D R E S O U RC E E S T I M AT E : 1.54 MILLION OUNCES INDICATED AND 0.41 MILLION OUNCES INFERRED PIT CONSTRAINED RESOURCE* 1 AVERAGE GRADE 0.93 g/ t Au Eq o District scale land package 28Km2 Project Boundary 2 INDICATED AND INFERRED RESOURCES Slab o Occur in five separate deposits Calvada

  8. Slide 8: Significant Oxide Remaining in High-Wall

    SA N TA F E D E P O S I T WHAT TO KNOW S I G N I F I C A N T OX I D E R E M A I N I N G I N H I G H - WA L L SANTA FE DEPOSIT 1 SANTA FE PIT OXIDE o Significant oxide & transition left to be mined SANTA FE FAULT o 0.70 g/t oxide gold with low strip* 2 COMPETENT WALL ROCK o 50-degree pit slopes o Min

  9. Slide 9: Santa Fe Mine Pathway to Production

    100% Controlled S A N TA F E M I N E PAT H WAY T O P R O D U C T I O N SUBSTATION SANTA FE PIT ROUTE TO SU BSTATION PO RO WE AD RL AC IN CES ET S OS UB ST AT IO SLA NO B-C NL ALVA GP DA C RO OMP PE LEX RT P I T E X PA N S I O N Y

  10. Slide 10: Santa Fe Mine PEA: Low Capex, Low Cost, Rapid Payback

    SA N TA F E M I N E P E A : LOW C A P E X , LOW CO S T, R A P I D PAY BAC K WALKER LANE, NEVADA USA o LOM strip ratio of only 1.6* o Capex of US$135 M including a 20% contingency* o Payback period of 2.9 years* o Low cash costs* 1 km Slab Santa Fe Calvada Operating Nevada Heap-Leach Gold Mines Cash

  11. Slide 11: Santa Fe Mine PEA: Robust Economics

    SA N TA F E M I N E P E A : RO B U S T E CO N O M I C S WALKER LANE, NEVADA USA 8 Year Project US$1,233 ~50,000 oz/year US$200M NPV5 IRR = 34.2% US$931M Life* LOM Cash Cost* Ave. LOM Au Eq After Tax, Spot After Tax, Spot LOM Gross 12,500 TPD Production* Case* Case* Revenue* Potential to grow Annual

  12. Slide 12: York 2025 Drill Results

    YORK 2025 DRILL RESULTS South-Southwest York Deposit Concept Hole to Extend and Deepen the Pit North-Northeast o YOR25-001R:89.9 metres (45.7 Resource 96.02m @ 0.27g/t Au, – 135.6m) grading 0.23 g/t Au Pit Design 0.10g/t Ag from 1.52m 48.77m @ 0.20g/t Au, 0.04g/t Ag from surface (YOR25-001R): Shallo

  13. Slide 13: Slab 2025 Drill Results

    SLAB 2025 DRILL RESULTS Northwest Southeast Southern Extent of Calvada West “Slab” Pit 3.1m @ 0.40g/t Au, 3.2g/t Ag from surface Resource Pit CAL25-003R Design CAL25-004R Resource Pit Design o CAL25-004R: 39.6 metres (67.1 – 106.7m) grading 0.30 g/t Au: 9.2m @ 0.41g/t Au, 3.5g/t Ag from 15.2m 39.6m

  14. Slide 14: "New" York Claim Acquisition

    “NEW” YORK CLAIM ACQUISTION 1 km o Lahontan is acquiring 27 claims from Emergent Metals Corp. o Adds approx. 2.1 km2 of strategic mineral rights to the Santa Fe Mine Project: Total 28.5 km2 N o South and southeast of the York open pit and resource o Allows the expansion of the York open pit and pote

  15. Slide 15: Santa Fe Mine - Pathway to Production

    S A N TA F E M I N E - PAT H WAY TO P R O D U C T I O N E X P L O R AT I O N P L A N O F O P E R AT I O N S & M I N E P L A N O F O P E R AT I O N S o Advanced permitting process covers 12.2 km2 area EXPLORATION o Permit will cover 50% of land package with over PLAN OF 700 permitted drill holes OPER

  16. Slide 16: West Santa Fe

    W E S T S A N TA F E A FOCUS FOR RESOURCE GROWTH IN 2025 TSX.V-LG; OTCQB-LGCXF; FSX-Y2F

  17. Slide 17: West Santa Fe Oxide

    W E ST SA N TA F E OX I D E OX I D E OX I D E WHAT TO KNOW WEST SANTA FE 1 L O C AT I O N L O C AT I O N L O C AT I O N o Located only 13 km west of the Flagship Santa Fe Mine o District scale land package 2 S I G I F I C A N T H I S T O R I C D A TA B A S E o Outlines a shallow oxide Au & Ag deposi

  18. Slide 18: High-Grade Surface Sampling

    W E ST SA N TA F E H I G H - G R A D E S U R FAC E SA M P L I N G WHAT TO KNOW Sample 503416 WEST SANTA FE 1 WELL DEFINED STRUCTURE o Sampling and mapping has helped identify structural controls to Au & Ag mineralization o Intersections of northeast striking high- angle faults and low-angle thrust f

  19. Slide 19: Excellent Resource Growth Potential

    W E ST SA N TA F E E XC E L L E N T R E S O U RC E G ROW T H P OT E N T I A L WHAT TO KNOW WEST SANTA FE 1 DRILLING TO DATE o Au & Ag begins at surface o Mineralization continues down-rake o All Oxide!!! 2 0.31 G/ T AU SHELL OUTLINE o Look alike to Santa Fe o Possible low-cost satellite operation o

  20. Slide 20: West Santa Fe Phase One Drilling

    W E ST SA N TA F E P H AS E O N E D R I L L I N G I N 2 0 2 5 Down-dip drilling Step-out drilling Step-out drilling PHASE ONE DRILL PROGRAM, 4-5000m o 26 RC drill holes to verify historic drilling and Shallow oxidized Au-Ag system in step-out on strike and down dip historic drilling o Drilling can b

  21. Slide 21: Lahontan Key Catalysts

    L A H O N TA N K E Y C ATA LYSTS 2025 1 PHASE ONE DRILL PROGRAM COMPLETE o Program designed to target Calvada, Slab & York 2 PLAN OF OPERATION PERMIT HEADING INTO NEPA PHASE o Estimated approval late Q4 2025 3 WEST SANTA FE PHASE ONE PROGRAM o Q4 2025 estimated program between 4000 & 5000 metres 4 S

  22. Slide 22: Corporate Office and Field Office

    CORPORATE OFFICE FIELD OFFICE 80 Richmond Street West Suite 204 364 E Street Hawthorne Toronto, ON NV 89415 United States M5H 2A4, Canada Telephone: 1.775.945.6140 Please contact Kimberly Ann at 1.530.414.4400 or Kimberly.ann@lahontangoldcorp.com

  23. Slide 23: Appendix – Santa Fe Mine Royalties

    A p p e n d i x – S a n t a Fe M i n e Roya l t i e s 28.3 km2 Land Package o 416 unpatented lode mining claims o 67 unpatented mill site clams 1. 25% NSR o 24 patented lode mining claims o Except for 45 optioned unpatented lode mining claims, all mining claims are 100% owned by Lahontan Over 79% of

  24. Slide 24: Appendix: Santa Fe Mine History

    Appendix Santa Fe Mine History Company Ownership Event Year Cordero Mining Co. Original Staking 1960 Callahan Mining Co. Option Agreement 1968 Bell Mountain Silver Mines Option Agreement 1971 Westley Mines Ltd. Option Agreement 1971 Bethlehem Mines Option Agreement 1974 Westley Mines Ltd. Option Dro

  25. Slide 25: Appendix – Santa Fe Mine Mineral Resource Estimate

    A p p e n d i x – S a n t a Fe M i n e M i n e ra l Re s o u rc e E s t i m a te Table One: Project- wide Resources, Santa Fe Mine, Mineral County, Nevada TSX.V-LG; OTCQB-LGCXF; FSE-Y2F 25

  26. Slide 26: Appendix – Continued

    Appendix – Continued Notes to Table 1: 1. Mineral Resources have an effective date of October 9, 2024. The Mineral Resource Estimate for the Santa Fe Mine was prepared by Trevor Rabb, P.Geo., of Equity Exploration Consultants Ltd., an independent Qualified Person as defined by NI 43-101. 2. Mineral

  27. Slide 27: Moho and Redlich

    Moho and Redlich Moho Re d l i c h High Grade Au & Ag Disseminated Ag o Large land package 11 square o Located 45 km south of Santa Fe km, 35 km SW of Santa Fe, 100% owned by Lahontan o Disseminated Ag hosted by Tertiary age epithermal veins and o High-grade, oxidized Tertiary stockwork Au-Ag-Pb-Zn

Lahontan Gold — Investor Presentation (September 2025) on 6ix