Crown Castle Inc. · NYSE:CCI

Crown Castle — Crown Castle International — 4th Annual Tower Industry Summit and Trade Show (2001)

40 slides from Crown Castle's conference presentation, 2001

  1. Slide 1: 4th Annual Tower Industry Summit and Trade Show

    Slide 1: 4th Annual Tower Industry Summit and Trade Show

    4th. Annual Tower Industry Summit and Trade Show John P. Kelly President & CEO Crown Castle International Corp.

  2. Slide 2: Agenda

    Slide 2: Agenda

    Agenda Agenda Forecasting Demand Demand Drivers Voice Data Conclusions shaping the wireless world SM

  3. Slide 3: 1984: 5 year projections

    Slide 3: 1984: 5 year projections

    1984: 1984: 55 year year projections projections 3.5 Source: CTIA 3.0 Forecast (Original Industry Projection) Actual 2.5 Subscribers in Millions 2.0 1.5 1 .5 40 1984 1985 1986 1987 1988 1989 shaping the wireless world SM

  4. Slide 4: 1990: 5 year projections

    Slide 4: 1990: 5 year projections

    1990: 1990: 55 year year projections projections 40 35 Source: Kagan World Media 30 Forecast Actual 25 Subscribers in Millions 20 15 10 7.5 5 1990 1991 1992 1993 1994 1995 shaping the wireless world SM

  5. Slide 5: 1995: 5 year projections

    Slide 5: 1995: 5 year projections

    1995: 1995: 55 year year projections projections 110 100 Source: Kagan World Media 90 Forecast Subscribers in Millions Actual 80 70 60 50 40 1995 1996 1997 1998 1999 2000 shaping the wireless world SM

  6. Slide 6: Current year projections

    Slide 6: Current year projections

    Current Current 55 year year projections projections 260 240 Source: CTIA 220 Forecast Subscribers in Millions 200 180 160 140 120 2000 2001 2002 2003 2004 2005 shaping the wireless world SM

  7. Slide 7: Current state of mind

    Slide 7: Current state of mind

    Current Current state state of of mind mind Wireless industry growth slowing due to wireless data delays Current coverage is sufficient 2.5/3G technologies reduce need for more sites Capital constraints may result in carriers waiting Capacity problems can be fixed with equipment and without sites Sp

  8. Slide 8: Reality

    Slide 8: Reality

    Reality Reality Usage growth is sky-rocketing Coverage is work in progress Technical realities demand more sites to improve performance Spectrum constraints in a highly competitive environment TDMA/GSM spectral efficiency near maximum potential New PCS network build-outs In-building penetration cove

  9. Slide 9: Reality

    Slide 9: Reality

    Reality Reality Financial realities for carriers make network performance #1 priority Significant percentage of carrier expenditure will be based on site development shaping the wireless world SM

  10. Slide 10: Carriers focus

    Slide 10: Carriers focus

    Carriers Carriers focus focus “more minute” campaigns…

  11. Slide 11: Usage skyrocketing

    Slide 11: Usage skyrocketing

    Usage Usage skyrocketing skyrocketing – driven by price elasticity 3-yr MOU CAGR = 60% SUBSCRIBERS SUBSCRIBERS ARPU ARPU Millions $ / Month / Sub 100 100 200 200 75 75 MINUTES MINUTES OF OF USE USE 150 150 Billions 50 50 100 100 50 25 25 50 400 400 00 00 300 300 x 1990 1990 1995 1995 2000 2000 1990

  12. Slide 12: Network coverage issues

    Slide 12: Network coverage issues

    Network Network coverage coverage issues issues Situation Cellular coverage still incomplete PCS coverage (as % of population)… less complete PCS frequencies don’t propagate as well as cellular Lack of coverage is number one driver of churn and adds Huge financial incentive to prevent churn Implicat

  13. Slide 13: Importance of coverage/network performance

    Slide 13: Importance of coverage/network performance

    Importance Importance of of coverage/network coverage/network performance performance REASON CHOOSE PROVIDER REASON SWITCHED PROVIDER Good Good 20% 18% Coverage Coverage Promo / Sale 18% Price Plan 17% Recommended 8% Promo / Sale 12% Price 8% Customer 9% Service Group plan 5% Recommended 5% Source:

  14. Slide 14: Network satisfaction vs. churn

    Slide 14: Network satisfaction vs. churn

    Network Network satisfaction satisfaction vs. vs. churn churn Net Q Satisfaction vs. Churn: New York Correlating factors to churn 0.05 0.045 Higher correlation 0.04 Increase Increase network network 0.035 quality quality by 14% by 14% Churn 0.03 Dropped Calls 0.025 0.02 Decreases Decreases Customer

  15. Slide 15: Financial magnitude of churn

    Slide 15: Financial magnitude of churn

    Financial Financial magnitude magnitude of of churn churn Impact to industry of 1.25% reduction in churn > $6.65 billion savings. $6.65 billion could build 19,000 cell sites per year at $350k per site. Source Calc:123.2 million subscribers x 1.25% x 12 months per year x $ 360 per CPGA shaping the wi

  16. Slide 16: POPs Not-covered: example

    Slide 16: POPs Not-covered: example

    POPs Not-covered:: example POPs Not-covered example NYC NYC 8% 8% Charlotte Charlotte 6% 6% Cincinnati Cincinnati 12% 12% LA LA 4% 4% Cleveland Cleveland 15% 15% Columbus Columbus 3% 3% Chicago Chicago 3% 3% KC KC 5% 5% Las Vegas Las Vegas 3% 3% Phily Phily 10% 10% Miami Miami 3% 3% Milwaukee Milwau

  17. Slide 17: Operator A - Cellular

    Slide 17: Operator A - Cellular

    Operator A - Cellular shaping the wireless world SM

  18. Slide 18: Operator B - PCS

    Slide 18: Operator B - PCS

    Operator B - PCS shaping the wireless world SM

  19. Slide 19: Capacity fallacy

    Slide 19: Capacity fallacy

    Capacity Capacity fallacy fallacy Operators often refer to all types of site additions, after launch, as “capacity” sites Leads to erroneous conclusion that technology “capacity solutions” will eliminate need for sites Reality Check: Base station capacity solutions only address one of four issues Sm

  20. Slide 20: Service area descriptions

    Slide 20: Service area descriptions

    Service Service area area descriptions descriptions Issues… Green = Good Service Yellow = Marginal Service Blue = No Service shaping the wireless world SM

  21. Slide 21: Issue 1 – Holes within covered area

    Slide 21: Issue 1 – Holes within covered area

    Issue Issue 11 – Holes within “covered” area Green = Good Service Yellow = Marginal Service Blue = No Service Subscriber Subscriber finds finds interior interior holes holes (dropped (dropped calls/no calls/no service) service) shaping the wireless world SM

  22. Slide 22: Issue 2 – System loading

    Slide 22: Issue 2 – System loading

    Issue Issue 22 – System loading Green = Good Service Yellow = Marginal Service Blue = No Service Degradation Degradation ofof service service with with increased increased operational operational channels channels shaping the wireless world SM

  23. Slide 23: Issue 3 – Coverage Expansion

    Slide 23: Issue 3 – Coverage Expansion

    Issue Issue 33 – Coverage Expansion Green = Good Service Yellow = Marginal Service Blue = No Service New New subscriber subscriber adds adds require require service service in in fringe fringe areas areas shaping the wireless world SM

  24. Slide 24: Issue 4 – Traffic hotspots

    Slide 24: Issue 4 – Traffic hotspots

    Issue Issue 44 – Traffic hotspots Green = Good Service Yellow = Marginal Service Blue = No Service Blocked Blocked calls calls during during busy busy hour hour in in traffic traffic “hotspot” “hotspot” shaping the wireless world SM

  25. Slide 25: Trouble-spots

    Slide 25: Trouble-spots

    Site Analysis 2 Mile Radius San Francisco March 2001 Trouble Trouble -- spots spots by by tower tower & & operator operator Source: Source: Telephia Telephia

  26. Slide 26: Tower site demand projections

    Slide 26: Tower site demand projections

    Tower Tower site site demand demand projections projections What is the future cell site density likely to be? Answers can be proxied by analysis of available metrics: Drive test data Dropped calls, call quality problems, and no service areas Estimate of operators’ cell density Demographic proxies S

  27. Slide 27: Tower site demand projections

    Slide 27: Tower site demand projections

    Tower Tower site site demand demand projections projections Crown Castle has done significant analysis of cell site demand projections including: Carrier consolidation Removal of the spectrum cap Technology developments shaping the wireless world SM

  28. Slide 28: Tower site demand projections

    Slide 28: Tower site demand projections

    Tower Tower site site demand demand projections projections if we ignore 3G high speed data: By looking at cell site density growth over time and comparing different markets of different maturities, we can arrive at cell site density growth profiles for each operator. Results thus far suggest conven

  29. Slide 29: Migration to 3G

    Slide 29: Migration to 3G

    Migration Migration to to 3G 3G Source: The Strategis Group 1.4 mbps 3xRTT HDR 2 mbps 144 kbps 1XRTT W-CDMA IS-95B 64 kbps EDGE 384kbps CDMA 14.4 kbps GSM GPRS TDMA 115 kbps 2000 2000 2001 2001 2002 2002 2003 2003 2004 2004 shaping the wireless world SM

  30. Slide 30: Wireless data 3G

    Slide 30: Wireless data 3G

    Wireless Wireless data data 3G 3G relation to cell site density… B PS 1XRTT K .2 12 GSM EDGE TDMA 144 KBPS 384 KBPS Increases in bits/HZ throughput requires a better quality radio channel shaping the wireless world SM

  31. Slide 31: Wireless data

    Slide 31: Wireless data

    Wireless Wireless data data Wireless data will increase demand for cell sites Subscribers will find new places to use PDAs Increased number of operational channels will be required to support increased usage New technologies’ “capacity increases” and the ability to support higher data rates will red

  32. Slide 32: Wireless data

    Slide 32: Wireless data

    Wireless Wireless data data Conclusion: All of today’s systems which were designed for voice (12.2 KBPS) will require additional sites to provide ubiquitous high speed data. Three times the number of cell sites are required, unless: Operator elects to accept lower speed data in marginal areas Certai

  33. Slide 33: Tower site demand projections

    Slide 33: Tower site demand projections

    Tower Tower site site demand demand projections projections If we consider 3G high speed data, then cell site density can be projected based on one key assumption: Data rate required shaping the wireless world SM

  34. Slide 34: Global overview

    Slide 34: Global overview

    Global Global overview overview Europe… Europe’s 3G build-out will kick into high gear, starting Q4/01 in the UK, Italy and Germany. UK 2G leasing remains strong for existing tower assets. What is the ‘overall Euro vision’ for 3G, is it a pan- geographic network or city based? Where allowed, what wi

  35. Slide 35: Global overview

    Slide 35: Global overview

    Global Global overview overview United States… US ‘build-to-suits’ in 2002 may be half of 2001 numbers. US tower companies will build more selectively with an eye on ROIC. US 2G leasing will remain strong for existing tower assets Tower company margins should improve as the volume of integration dim

  36. Slide 36: Impact of declining markets

    Slide 36: Impact of declining markets

    Impact Impact of of declining declining markets markets JAPAN 50.9% 8.3% Nikkei Yen declines against the US$ over 5 years1 Tokyo stock market down 50% over 5 years1 Wireless subs continue to grow year over year, now at 63.4 million, up 18.25% over last year2 Wireless penetration 50.9%2 Source: 1 cbs

  37. Slide 37: Impact of declining markets

    Slide 37: Impact of declining markets

    Impact Impact of of declining declining markets markets UK 73.0% 35.5% FTSE UK economy has enjoyed moderate growth over last 5 years British pound increases over Euro1 UK stock market has lost 50% over the past 18 months1 Wireless subs continue to grow year over year, now at 43.5 million, up 36.45%

  38. Slide 38: US still relatively untapped

    Slide 38: US still relatively untapped

    US US still still relatively relatively untapped untapped Penetration Rate by Country Austria Italy Sweden Portugal UK Netherlands Switzerland Norway Ireland Spain Germany Australia France Source: Global Mobile US 0% 20 40 60 80 100 shaping the wireless world SM

  39. Slide 39: Conclusion

    Slide 39: Conclusion

    Conclusion Conclusion Financial realities for wireless service providers make network performance a #1 priority. Minutes of use and subscriber growth are driving the need for new site deployment. Coverage continues to be a work in progress. Technical realities demand more sites to improve performanc

  40. Slide 40: ...thank you

    Slide 40: ...thank you

    ...thank you John P. Kelly President & CEO Crown Castle International Corp.

Source: Internet Archive copy of crowncastle.com

More decks from Crown Castle Inc.

All 119 Crown Castle decks