Liontown Limited · ASX:LTR

Liontown — 2025 Macquarie Australia Conference

19 slides from Liontown's conference presentation, May 6, 2025

  1. Slide 1: Australia's first underground lithium mine

    Australia’s first underground lithium mine 6 May 2025 Tony Ottaviano Managing Director | CEO ASX: LTR | ltresources.com.au 1

  2. Slide 2: Important Information

    Important Information Important Information Competent Persons Statement This Presentation contains forward-looking statements which are identified by words such as ‘may’, ‘could’, ‘believes’, The Information in this Presentation that relates to Mineral Resources for the Kathleen Valley Project is ex

  3. Slide 3: Liontown corporate overview and business highlights

    Liontown corporate overview Our business highlights Liontown is an ASX listed responsible battery minerals provider headquartered in Perth, Western Australia. The Company operates the Kathleen Valley Lithium Operation. ✓ Australia’s newest lithium producer First production at Kathleen Valley deliver

  4. Slide 4: Strong operational execution has underpinned FY25 performance to date

    Strong operational execution has underpinned FY25 performance to date Since first concentrate, production, costs and sales are progressing in line with expectations, notably achieving positive net cashflow from operating activities for two consecutive full quarters Operational Performance1 Financial

  5. Slide 5: Kathleen Valley Lithium Operation – Site Layout

    Kathleen Valley Lithium Operation – Site Layout Open pit Lined tailings Dragonfly Village dam Paste plant Underground operation Process plant Run-of-mine (ROM) stockpiles Renewable Ore sorting infrastructure 5 5

  6. Slide 6: Mining Performance – Open Pit

    Mining Performance – Open Pit Kathleen’s Corner Open Pit continues to progress to plan • Open pit mining is the primary ore source through FY25 and on track for completion in Q3 FY26 • ~2.3Mt of ore (incl OSP8) moved during FY25, with an average Li2O grade mined of 1.2% • Final open pit grade contro

  7. Slide 7: Underground production underway

    Underground production underway Successfully commenced underground production on schedule in April 2025 • ~9,200 cumulative development metres achieved since November 2023 (160 metres ahead of plan) • High jumbo productivity, with our partner Byrnecut achieving an average of >300m per jumbo per mont

  8. Slide 8: Two orebodies "One Mine" – bulk mining

    Two orebodies “One Mine” – bulk mining Kathleen Valley Resource Large scale, high grade, tier-1 (Oblique view, legend representative of resource grade) orebodies N • Kathleen Valley 100% wholly-owned Open pits • Mineral Resource Estimate 155Mt at 1.3% Li2O • Ore reserve underpin multi-decade mine li

  9. Slide 9: 2.8Mtpa optimised mine plan - Deep Dive

    2.8Mtpa optimised mine plan - Deep Dive Mt Mann Scheduled and Contained Ore Mine Design Strategically prioritises high margin ore (Oblique view, legend representative of scheduled stope grade) Balancing cost versus return North Decline • Grade distribution ranging from 1.0% to >2.6%, and an South De

  10. Slide 10: Bulk tonnes, high productivity, low-cost

    Bulk tonnes, high productivity, low-cost Mt Mann Scheduled and Contained Ore by Mine Level Driving efficient, high-margin operations, (Million Tonnes) resulting in long-term low-cost production 5-year Schedule Ore Mined Contained Ore • 5-year mine plan contains up to 100m thick ore zones, containing

  11. Slide 11: Mt Mann underground – its happening!

    Mt Mann underground – its happening! Left image: Mt Mann typical pegmatite ore face Left image: Above image: 11 Pegmatite ore face prepared for blasting Final brow of first stope after ore extracted

  12. Slide 12: Fourth generation plant delivers

    Fourth generation plant delivers Strong performance and continued improvements in processing efficiency • At average mill feed grade of ~1.3%, average lithia recovery has continued to improve quarter on quarter to an average of 64% in the March Quarter, reflecting ongoing performance improvements •

  13. Slide 13: Market update

    Market update 13

  14. Slide 14: Lithium demand remains strong….

    Lithium demand remains strong…. Strong demand continues across multiple segments EV Demand11 (lithium demand, kt LCE) 2,443 2025 Growth: +133% • Strong YoY EV sales growth 1,753 - BYD April YTD sales up +47% YoY; BEVs share relative to PHEVs grew to 54% 1,050 956 - EV battery giant CATL's Q1 net pro

  15. Slide 15: ….so why the price weakness?

    ….so why the price weakness? Tariff market uncertainty is contributing to inventory destocking which obscures real end-market strength Precursor Spodumene mining & Finished lithium Cathode Active Battery production EV & ESS concentration production Material (eg carbonate, hydroxide) Supply and deman

  16. Slide 16: Value Proposition

    Value Proposition The best strategies endure the cycles; ours is unchanged ✓ High-quality, Tier-1 asset in Kathleen Valley Underpins… Kathleen Valley Full Potential ✓ Significant and low capital intensity growth opportunities provides expansion optionality In addition to… ✓ Future downstream integra

  17. Slide 17: Watch online

    Watch online: https://www.youtube.com/watch?v=r3FHOaZgkqQ 17 17

  18. Slide 18: For more information

    For more information: Leanne Kite Investor Relations lkite@ltresources.com.au +61 401 438 850 Level 2, 32 Ord Street, West Perth WA 6005 +61 8 6186 4600 info@ltresources.com.au liontown-resources-limited Liontown Resources @LiontownRes @LiontownRes 18

  19. Slide 19: Appendix B: Notes

    Appendix B: Notes 1. All metrics represent the period 1 July 2024 to 31 March 2025, unless otherwise stated. Processing commenced on 31 July 2024. 2. Based on accredited site laboratory assays managed by SGS Australia Pty Ltd. 3. Average realised sales price from the commencement of sales in Septemb

Liontown — 2025 Macquarie Australia Conference on 6ix