Triangle Energy (Global) Limited · ASX:TEG

Triangle Energy (Global) — Corporate Update (August 2019)

22 slides from Triangle Energy (Global)'s corporate update, August 2019

  1. Slide 1: Production Development Progress - Company Update

    Slide 1: Production Development Progress - Company Update

    Production Development Progress Company Update August 2019

  2. Slide 2: Corporate Overview

    Slide 2: Corporate Overview

    Corporate Overview ASX Code TEG EXPERIENCED BOARD Shares on issue1 312.8 million Unlisted options on issue 11.155M exc @ $0.15, exp 19 Jan 2020 CAPITAL STRUCTUREE 0.400M performance shares Share price1 $0.086 Tim Monkton Rob Towner Darren Bromley Non-Exec Chairman Managing Director Exec Dir/CFO/COO

  3. Slide 3: Corporate – Portfolio Summary

    Slide 3: Corporate – Portfolio Summary

    Corporate – Portfolio Summary WA-31-L Cliff Head Producing Asset • 78.75% equity holder • 2P reserves 1.71* MMstb as at 30 June2019 • Cliff Head Renewal Project to FID in December2019 L7(R1) Mt Horner • 2C Contingent Resource 4.79* MMstb • 50% equity holder • Targetting reserves increase of circa 3*

  4. Slide 4: Cliff Head Renewal Project - Overview

    Slide 4: Cliff Head Renewal Project - Overview

    Cliff Head Renewal Project - Overview Mentelle Updip THREE key opportunities identified to progress to CH13 Attic a Final Investment Decision in Q4 2019 1. Material increase in reserves West High 2. Step change in production 3. Asset life extension beyond 2030 1. CH11 workover to convert to an oil p

  5. Slide 5: Cliff Head 11 Recompletion Opportunity

    Slide 5: Cliff Head 11 Recompletion Opportunity

    Cliff Head 11 Recompletion Opportunity Uncompleted  Low cost, robust, additional production stream upper oil zone  Optimise utilisation of the CH11 well Water  CH11 water injection thought to be of limited benefit injection zone 1. Shut in and divert water injection to CH9 2. Convert to an oil pr

  6. Slide 6: West High/West Flank

    Slide 6: West High/West Flank

    West High/West Flank West High  Undrilled structural culmination that appears to be connected to the main field  Drillable from the platform  Work continuing to finalise subsurface definition  Detailed geological interpretation for reservoir prediction and characterisation  Cliff Head 3D seismi

  7. Slide 7: South East Nose

    Slide 7: South East Nose

    South East Nose  Low relief feature updip of Cliff Head-1 oil column  Broad area of 10m - 15m column height  0.86 – 1.43 – 2.4 MMstb Contingent Resources (1C-2C-3C)  Long reach development well from the platform Final Investment Decision Dec 2019 SE Nose Development well updip of Cliff Head-1 7

  8. Slide 8: Mentelle

    Slide 8: Mentelle

    Mentelle  Updip Mentelle-1  Oil shows in D3 reservoir  M1 drilled off structure, limited seismic when drilled  3.3 MMstb Best Estimate Prospective Resource  Needs additional seismic to mature for drilling  Further seismic planned for 2020  Can be developed from Cliff Head platform Updip Mente

  9. Slide 9: Resource Summary WA-31-L Cliff Head

    Slide 9: Resource Summary WA-31-L Cliff Head

    Resource Summary WA-31-L Cliff Head **The estimated quantities of petroleum that may potentially be recovered by the application of future development projects relate to undiscovered accumulations. These estimates have both an associated risk of discovery and a risk of development. Further explorati

  10. Slide 10: Extending the economic field life of Cliff Head infrastructure

    Slide 10: Extending the economic field life of Cliff Head infrastructure

    Extending the economic field life of Cliff Head infrastructure ead Gross (TEG equity share 78.75%) • Current reserves*1.71MMstb • The Cliff Head Renewal Project has additional 2C Contingent Resource of 3.13 MMstb • Contingent Resources that pass Final Investment Decision (“FID”) will transfer to Res

  11. Slide 11: Returning production to ~1000 bbls/day by mid November 2019

    Slide 11: Returning production to ~1000 bbls/day by mid November 2019

    Returning production to ~1000* bbls/day by mid November 2019 • CH-13 is planned for production restart mid November 2019* following completion of the Workover Step Change Project. • Conventionally deployed ESP’s will replace the current Electric Coiled Tubing deployed ESP’s. • Production downtime to

  12. Slide 12: Xanadu

    Slide 12: Xanadu

    Xanadu  Xanadu 3D acquired during 31st May – 14th July  Updated Xanadu discovery resource definition and appraisal well location  The seismic data is currently being processed  Results from the final interpreted data expected to be available by October 2019  The interpreted results of the 3D se

  13. Slide 13: Xanadu

    Slide 13: Xanadu

    Xanadu  Substantial additional prospectivity in TP15 West Xanadu C Xanadu Xanadu FTG anomaly  West Xanadu leads  Infill 2D seismic program being West Xanadu evaluated to define these for drilling West Xanadu  Oil potential for lower IRCM/Kingia at Xanadu  Will be evaluated by Xanadu 3D  South

  14. Slide 14: South Xanadu

    Slide 14: South Xanadu

    South Xanadu  Possible structure on Full Tensor Gravity and single seismic line  Needs more seismic data to define closure to the South West Xanadu Xanadu N S South Xanadu South Xanadu

  15. Slide 15: State Gas Limited (ASX:GAS)

    Slide 15: State Gas Limited (ASX:GAS)

    State Gas Limited (ASX:GAS) TEG trading at less than value of State Gas Shares 33.34% equity interest worth ~$ 28.7 million (at ~$0.60 per share 26-08-19)  GAS holds an 80% interest and is the Operator of the Reid’s Dome Gas Project (PL231) in the Bowen Basin QLD (47,830,148 shares)  Successfully

  16. Slide 16: Moving contingent resource to reserves & production

    Slide 16: Moving contingent resource to reserves & production

    Moving contingent resource to reserves & production 2019 – Laying the 2020 – Building capability 2021 Target: 3000 bbls/d foundation for growth in preparation for drilling Drill & complete production well Increasing equity to 45% in TP/15– Planning for Xanadu-2 at SE Nose, West High, Cliff Head X

  17. Slide 17: Indonesian Arbitration Update

    Slide 17: Indonesian Arbitration Update

    Indonesian Arbitration Update  Triangle Energy (Global) Limited advised* that it has received a request for arbitration from former joint venture partner Perusahaan Daerah Pembangunan Aceh (PDPA), an Acehnese government owned company  PDPA are alleging Triangle Energy (Global) Limited owe: • Contr

  18. Slide 18: Triangle is planning a period of company changing activity

    Slide 18: Triangle is planning a period of company changing activity

    Triangle is planning a period of company changing activity 2005 The Cliff Head field has had no new infield, near field or well re- development mid 2019 Xanadu 3D seismic completed (interpretation ongoing) mid 2020 Xanadu-2 development well mid 2020 New 2D seismic actioned (planning for wide survey

  19. Slide 19: Launching into growth

    Slide 19: Launching into growth

    Wrap-up Launching into growth ……with new drilling for the next wave of Has set up the Company for production and asset life growth in 2020 growth in 2021/22 Our work in 2019  Increasing near term production at Cliff Drilling campaign (SE Nose, West High, Mentelle, others) Increasing equity to 45%

  20. Slide 20: Notes Regarding Contingent and Prospective Resources

    Slide 20: Notes Regarding Contingent and Prospective Resources

    Notes Regarding Contingent and Prospective Resources  The Contingent Resources for the Cliff Head asset are held under the Production Licence WA-31-L in which Triangle holds a net equity share of 78.75%. Some of these Contingent Resources were previously reported as Prospective Resources (Triangle

  21. Slide 21: Disclaimer and Forward Looking Statements

    Slide 21: Disclaimer and Forward Looking Statements

    DISCLAIMER AND FORWARD LOOKING STATEMENTS  This Presentation is provided on the basis that Triangle Energy (Global) Limited (“Triangle” or the “Company”) nor its respective officers, shareholders, related bodies corporate, partners, affiliates, employees, representatives and advisers make any repre

  22. Slide 22: Triangle Energy (Global) Limited - Contact

    Slide 22: Triangle Energy (Global) Limited - Contact

    Triangle Energy (Global) Limited (ASX:TEG) Mr Rob Towner – Managing Director Ground Floor, 100 Havelock St West Perth Western Australia 6005 E: info@triangleenergy.com.au T: +61 8 9219 7111 W: www.triangleenergy.com.au

Source: Internet Archive copy of triangleenergy.com.au

More decks from Triangle Energy (Global) Limited