Roxgold — Investor Presentation (October 2011)
22 slides from Roxgold's investor presentation, Oct 3, 2011
Slide 1: Gold Can Hide But It Can't Run
``GOLD CAN HIDE BUT IT CAN`T RUN`` 1
Slide 2: Roxgold interest in Yaramoko Concession and Burkina Faso highlights
Roxgold has earned a 60% interest from Riverstone Resources in the Yaramoko Concession and two other gold properties near existing gold producers in Burkina Faso, West Africa and is in the process of acquiring the remaining 40% Burkina Faso is the fastest growing gold country in Africa; six new gold
Slide 3: Roxgold properties relative to neighbouring producers
ROXGOLD ROXGOLD 62.4 gpt Au/16m Semafo Nyefe ROXGOLD Avion Orezone Reported gold values are over intercept lengths not true widths 3
Slide 4: Yaramoko Concession
YARAMOKO CONCESSION Nyafe Deposit 927000 tonnes 5.03 gpt Haho West Arm Bagassi Central Zones 55 and 35 Concession 200 sq km Grandodioritic intrusion into Greenstone Sub- Sub-parallel quartz veins in north- north-west trending shears cut intrusive and volcanics Contiguous with Semafo’ Semafo’s produc
Slide 5: Yaramoko Concession Zone 55 Bagassi Central
YARAMOKO CONCESSION ZONE 55 45.0 gpt Au/9m BAGASSI CENTRAL ZONE 35 Reported gold values are over intercept lengths not true widths 5
Slide 6: Yaramoko Concession Zone 55 Drill Results
YARAMOKO CONCESSION ZONE 55 DRILL RESULTS 100.6 gpt Au/4m Reported gold values are over intercept lengths not true widths 6
Slide 7: Zone 55
ZONE 55 37.7 gpt Au/16m Reported gold values are over intercept lengths not true widths 7
Slide 8: Zone 55 Cross Section
ZONE 55 CROSS SECTION 17.2 gpt Au/12m Reported gold values are over intercept lengths not true widths 8
Slide 9: Zone 35 Drill Plan
Assays Pending ZONE 35 DRILL PLAN Reported gold values are over intercept lengths not true widths 9
Slide 10: Summary of Drilling Area Significant Results
Summary of Drilling Area 55 Significant Results October 1. 2011 Drill Hole EAST_X NORTH_Y AZIMU DIP Depth (m) From(m) To (m) Interval (m) Est True(m) Au gpt VG YRM-11-DD-028 469481 1299079 360 -55 224.22 108.1 113.3 5.20 3.38 X YRM-11-DD-024 469481 1299180 180 -60 98.04 43.0 59.0 16.00 9.60 37.68 X
Slide 11: Yaramoko Concession and Zones
Yaramoko Concession 55 and 35 Zones 39.0 gpt Au/2m Bagassi South Reported gold values are over intercept lengths not true widths 11
Slide 12: Bagassi Central Drill Target Map
BAGASSI CENTRAL Drill Target Map Proposed Drill Fences 14.1 gpt Au/9m Reported gold values are over intercept lengths not true widths 12
Slide 13: Bagassi South
35.6 gpt Au/1m 11.25 gpt Au/2m Holes in black are core BAGASSI SOUTH Reported gold values are over intercept lengths not true widths 13
Slide 14: Bissa West (Bouboulou)
BISSA WEST (BOUBOULOU (BOUBOULOU) BOUBOULOU) 51sq km concession in Central Burkina Faso West end of the 120 km long Sabcé shear hosting the Bissa Hill gold Deposit of High River. 4 gold zones reported Bouboulou Phase 1 RC Program Results Hole # Az Dip TD (m) Intercept (m) Width(m) Au Grade(gpt) Area
Slide 15: Solna Group
SOLNA GROUP 415 sq km concession Covers 30 km long shear zone in greenstone belt Near Essakane & Samira Hill (Niger) gold mines 141 rock samples; 29 >1 g/t Au; max 8.35 g/t Au define 3 km corridor of quartz tourmaline veins assays from incomplete Phase 1 RC low grade only Subsequent RAB program foun
Slide 16: Roxgold Objectives 2011-2012
ROXGOLD OBJECTIVES 2011-2012 Delineate resources at Zones 55 and 35 Trend drilling on Bagassi Central and South linears Explore Yaramoko West Arm south of Neyafe Deposit Assess drill results from 20 RC drill holes pending from Bissa West and pursue any new targets generated Complete acquisition of 1
Slide 17: Capital Structure
CAPITAL STRUCTURE Issued and Outstanding; (October 2011) 49.53 million Cash on hand $3.74 million Advances $1.0 million Warrants 12.337 million at $0.25 expiring Oct 27 2012 5.0 million at $1.00 expiring May 10 2013 0.7 million at $0.75 expiring May 10 2013 Total potential dilution 18.037 million To
Slide 18: Yaramoko drill intercepts map
28.6 gpt Au/20 m 62.4 gpt Au/16 m 17.2 gpt Au/12 m Work begins 24.6 gpt Au/ 6m 53.6 gpt Au/8m 45.0 gpt Au/9m 37.7 gpt Au/16m 100.2 gpt Au/4m Reported gold values are over intercept lengths not true widths 18
Slide 19: Management & Directors
MANAGEMENT & DIRECTORS Robert A. Sibthorpe, President, CEO and Director Mr. Sibthorpe (B.Sc. in Geology 1972; MBA 1979 University of Toronto) has forty years experience in mining and finance industries including project geologist and corporate development officer for mining companies active in Afric
Slide 20: 20
20
Slide 21: Bernard Baruch gold quote
Gold has worked down from Alexander's time... When something holds good for two thousand years I do not believe it can be so because of prejudice or mistaken theory. -- Bernard M. Baruch 1870-1965, American Financier 21
Slide 22: Disclaimer
DISCLAIMER Information in this presentation is provided as at Oct 03, 2011. . This presentation includes “forward-looking” statements or information within the meaning of Canadian securities legislation and the United States Private Securities Litigation Reform Act of 1995. Forward-looking statement