Sia Engineering Co. Ltd. · SGX:S59

Sia Engineering — Shareholder Meeting (July 2021)

9 slides from Sia Engineering's shareholder meeting presentation, Jul 23, 2021

  1. Slide 1: Annual General Meeting

    Annual General Meeting 23rd July 2021

  2. Slide 2: Recap of FY20/21

    Recap of FY20/21 Toughest year since listing due to impact of COVID-19 • Flights handled at Changi hit a historical low • Work volume at our hangars and Joint Ventures dropped significantly • Considerable reduction in expenditure could not fully offset revenue loss

  3. Slide 3: Looking Ahead

    Looking Ahead The worst of the aviation industry’s COVID-19 downturn may be behind us Flights Handled by Line Maintenance 3,500 23% of pre-COVID-19 3,000 2,500 2,000 1,500 10% of pre-COVID-19 1,000 Apr-20 May-20 Jun-20 Jul-20 Aug-20 Sep-20 Oct-20 Nov-20 Dec-20 Jan-21 Feb-21 Mar-21

  4. Slide 4: Outlook

    Outlook Recovery amidst uncertainty Global Revenue Passenger Kilometers (RPKs) • COVID-19 vaccination gathering pace Departures • Increase in vaccine manufacturing capacity and supply • Restart of international air travel through travel bubbles • Stark gap in vaccination levels between different cou

  5. Slide 5: Our Response

    Our Response Emerging stronger and more resilient Tighten Cost Workforce Safety Reshape Our Pursue New Measures & Upskilling Portfolio Opportunities • Cuts in Management • Lean and digital training • Acquired full ownership of • Set up new Engine salaries and Directors fees • Rostered Routine Testin

  6. Slide 6: Strategic Partnerships – JV Portfolio

    Strategic Partnerships – JV Portfolio 23 JVs Across 7 Countries (Total Revenue in FY20/21: S$4B) Airframe and Line Maintenance Engine and Component SIA Engineering PT JAS Aero- Singapore Aero Engine Component Aerospace SIA Engineering Japan Engineering Services Eagle Services Asia (USA) Services Sin

  7. Slide 7: Accelerating Pace of Transformation

    Accelerating Pace of Transformation Transformation Phase 2 Power Up with Lean Power Up with Digital o More than 20% improvement and Technology in turnaround time Planned o Launch core digital applications o Scale up to over 20 projects investments of o Progress on major platform o Enterprise wide im

  8. Slide 8: Engineering a Sustainable Future

    Engineering a Sustainable Future Responsible business practices to drive positive change in the community Installed solar photovoltaic system  To provide up to 20% of electrical energy needs  Expected to reduce 2,594 tonnes of CO2e annually Green building  Hangar 2 achieved BCA Green Mark Platinu

  9. Slide 9: Thank You

    SIA ENGINEERING company

SIA Engineering Company — Shareholder Meeting (July 2021) on 6ix