Eloro Resources Ltd. · TSX:ELO

Eloro Resources — Investor Presentation (June 2024)

41 slides from Eloro Resources's investor presentation, June 2024

  1. Slide 1: Iska Iska: Major Silver-Tin Polymetallic Resource

    ISKA ISKA Major Silver-Tin Polymetallic Resource CORPORATE PRESENTATION TSX ELO | FSE P2Q | OTCQX ELRRF JUNE 2024

  2. Slide 2: Cautionary Language

    Cautionary Language This presentation contains “forward-looking statements” and “forward-looking information” and other risks of the mineral exploration industry as well as those risks discussed in the within the meaning of applicable Canadian securities laws concerning Eloro Resources Ltd. Company’

  3. Slide 3: About Eloro

    About Eloro TSX ELO | FSE P2Q | OTCQX ELRRF Eloro is focused on developing its world-class Iska Iska Found/developed this deposit in just silver-tin polymetallic discovery in the Potosí 3 years with only CDN$56 million in Department of southern Bolivia financings with Cantor Fitzgerald Canada Corpor

  4. Slide 4: Capital Structure and Ownership

    Capital Structure and Ownership 22% TSX Management and Board ELO 50% 3% Implied Cartier Silver Retail Corporation TSX: ELO | Frankfurt: P2Q (WKNA1JKAT) | OTCQX: ELRRF Shares Issued and Outstanding (June 3, 2024) 79.85M Warrants ($2.00 to $4.25 on exercise) 6.00M 25% Institutional Options and Restric

  5. Slide 5: Experienced Team

    Experienced Team Management Team Board of Directors TechnicalAdvisors THOMAS LARSEN B.A. THOMAS LARSEN B.A. QUINTON HENNIGH Ph.D., Chairman and CEO Chairman and CEO P.Geo.Geology / Geochemistry Geologic and Technical Advisor to MILES NAGAMATSU C.P.A., C.A. ALEXANDER HORVATH P.Eng Crescat Capital, a

  6. Slide 6: Silver: A Key Decarbonization Metal

    Silver: A Key Decarbonization Metal SOLAR PV CAPACITY THROUGH 2030 (GW) Silver is the Element of Change Highest electrical and thermal conductivity of all the metals 30% of silver supply is used in electrical applications • 10% of current silver supply is used in photovoltaics • Worldwide PV Capacit

  7. Slide 7: Tin: Technology Driven

    Tin: Technology Driven TIN INVENTORIES AT VERY LOW LEVELS Demand • 377,000 tonnes in 2021, 300,000 tonnes mined concentrate • Electronics accounts for 50% of demand (CAGR +5%) • Significant demand use for photovoltaics and electric vehicles – 1 GW of solar requires 8 tonnes of tin (40% increase YTD)

  8. Slide 8: About Bolivia

    About Bolivia Modern mining laws and a supportive political environment • Rich history of mining and prospectivity is excellent. Limited exploration in the early 2000s has now provided the opportunity to find Tier 1 assets • Straightforward mining laws and a simple tax structure with no capital cont

  9. Slide 9: Southwest Bolivia and Northern Chile Infrastructure Map

    Southwest Bolivia and Northern Chile Infrastructure Map Easy access to Northern Chilean seaports Iska Iska project close to established domestic paved road and rail transportation routes Two projected rail spur lines and road access for connection to main rail transportation routes to the Northern C

  10. Slide 10: Definitive Option Agreement

    Definitive Option Agreement Definitive Option Agreement signed January 6, 2020 • Vendor owns 100% of property • Fully permitted for exploration drill program and road accessible • No fixed expenditure requirement • No royalties on property Eloro will issue the Title Holder US $4.6M by July 25th, 202

  11. Slide 11: Strong Environmental and Social Governance Program

    Strong Environmental and Social Governance Program A historical mining region that Eloro Resources Implementation and support for courses, is committed to supporting: workshops, classes, materials and other requirements of social projects focused • Supplies to the communities during COVID-19 on wome

  12. Slide 12: Mineral Deposits: Bolivia, a Prolific Mining Country

    Mineral Deposits: Bolivia, a Prolific Mining Country Iska Iska is in the SW part of the Eastern Cordillera which hosts a number of world-class deposits of gold, silver, iron ore, zinc, tin, lead and lithium Cerro Rico de Potosí is the world’s largest silver deposit and has been mined continuously si

  13. Slide 13: Bolivian Tin Belt Evolution

    Bolivian Tin Belt Evolution Break-up of the Farallon plate was the most important event during the Early Miocene, about 23 million years ago, when it split into the Cocos plate and the Nazca plate that been subducted beneath Central and South America Subducting older Nazca plate below the Central An

  14. Slide 14: View of Iska Iska Caldera Complex

    View of Iska Iska Caldera Complex View of the Iska Iska Caldera Main Target Areas Looking North Terrain is like doing a program in Arizona or Nevada except at a much higher elevation The Iska Iska core Porvenir Concession covers 900 ha and is road accessible Located 48km north of Tupiza city, in the

  15. Slide 15: Analytical Signal Plan Map - Iska Iska and Mina Casiterita

    Analytical Signal Plan Map - Iska Iska and Mina Casiterita Magnetic surveys by Eloro have outlined an extensive magnetic intrusive body on the Mina Casiterita property immediately southwest of Iska Iska Previously artisanal mining of high-grade tin veins – reported concentrate production in early Po

  16. Slide 16: Property Geology and Mineralization

    Property Geology and Mineralization Iska Iska is a major silver-tin polymetallic porphyry-epithermal complex associated with a Miocene collapsed/resurgent caldera, emplaced on Ordovician age rocks with major breccia pipes, dacitic domes and hydrothermal breccias Recent drilling indicates that there

  17. Slide 17: Santa Barbara Drilling Geological Plan Map

    Santa Barbara Drilling Geological Plan Map The Santa Barbara Underground and surface radial drill holes have been removed from the figure to provide a clearer image of the current drill program. DHK-26 ~757.2m Typical Mineralized Breccia Grading 287g Ag/t, 1.12% Pb 11.5% Zn and 0.18% Sn 10 cm 17

  18. Slide 18: Top 12 Iska Iska Intercepts

    Top 12 Iska Iska Intercepts Intercept Grade Grade x Ag Sn Zn Pb Date Drill Hole ID (m) (g AgEq/t) Intercept (g/t) (%) (%) (%) 31-Jan-23 DHK-27 325.48 137.51 44,757 69.80 0.12 1.21 0.49 20-Sep-22 DSB-30 441.21 95.59 42,174 9.45 0.07 1.53 0.88 21-Jul-22 DSBU-10 349.03 120.04 41,897 44.75 0.14 1.05 0.7

  19. Slide 19: Top 12 Iska Iska Intercepts

    Top 12 Iska Iska Intercepts Grade x Value of Major Metal Components Date Drill Hole ID Intercept Ag (g/t) Sn (%) Zn (%) Pb (%) 31-Jan-23 DHK-27 44,757 20-Sep-22 DSB-30 42,174 21-Jul-22 DSBU-10 41,897 28-Jul-21 DHK-18 34,994 28-Sep-21 DHK-21 26,387 23-Feb-22 METSBUG-02 26,348 26-Jan-21 DHK-15 26,172

  20. Slide 20: Initial Mineral Resource Statement Iska Iska

    Initial Mineral Resource Statement Iska Iska 3D PERSPECTIVE OF THE ISKA ISKA PIT CONSTRAINED Item Average Grade RESOURCE Showing Distribution of Resource in Major Domains Mining Zn-Pb NSR Tonnage Zn Pb Ag Category Domain Method Cut-off (US$) (Mt) (%) (%) (g/t) OP 9.20 541 0.69 0.28 13.6 Inferred Pol

  21. Slide 21: Iska Iska Initial Mineral Resource Summary

    Iska Iska Initial Mineral Resource Summary Total insitu metal estimated to be 298 million CROSS SECTION OF ISKA ISKA PIT CONSTRAINED RESOURCE ounces Ag, 4.09 million tonnes Zn, 1.74 million tonnes Pb and 130,000 tonnes Sn Potentially open pittable inferred mineral resource in Polymetallic Domain (Zn

  22. Slide 22: Higher-Grade Shallower Resource in Polymetallic Domain

    Higher-Grade Shallower Resource in Polymetallic Domain LONGITUDINAL SECTION (A – A’) OF ISKA ISKA PIT This portion of the potentially open pittable resource RESOURCE MODEL with NSR CUTOFF>US$25/T blocks in red provides potential for early payback for the Iska Iska project Stripping ratio will likely

  23. Slide 23: Major Upsides for Iska Iska Mineral Resource

    Major Upsides for Iska Iska Mineral Resource As pointed out in the Technical report, the best grade areas are also those with the most drilling Much of current Polymetallic Domain resource is defined by 100m spaced drilling which likely underestimates overall grade All 139 drill holes in the resourc

  24. Slide 24: High-Grade Silver & Tin in Definition Drilling at Iska Iska

    High-Grade Silver & Tin in Definition Drilling at ISKA ISKA December 18, 2023 & January 11, 2024 Releases 279.22g Ag/t, 0.47% Pb and 0.43% Sn (339.82 g Ag Designed to fill-in major gaps in the block model eq/t) over 62.84m (DSB-61) as well as upgrade and expand higher-grade zone in general area of p

  25. Slide 25: Distribution of Silver at Iska Iska

    Distribution of Silver at Iska Iska Longitudinal section shows distribution of UPDATED GEOLOGICAL INTERPRETATION OF AG DISTRIBUTION silver. Definition drilling has expanded high grade zones As drilling density is increased, grades especially for silver, increase due to improved sample density Silver

  26. Slide 26: Distribution of Tin at Iska Iska

    Distribution of Tin at Iska Iska Tin is concentrated on the northwestern UPDATED GEOLOGICAL INTERPRETATION OF SN DISTRIBUTION side of Iska Iska As with silver, when drilling density is increased, grades of tin increase due to improved sample density Tin mineralization is controlled by multiple diffe

  27. Slide 27: Major Mineralized Corridor with Additional 600 m Strike Length

    Major Mineralized Corridor with Additional 600 m Strike Length New chargeability high southeast of the CHARGEABILITY ANOMALY CROSS SECTION ALONG LINE 56100N MRE open pit indicates that the major mineralized structural corridor that is up to 800 m wide extends a further 600 m along strike to the sout

  28. Slide 28: Chargeability Model at 3,700 m

    Chargeability Model at 3,700 m MODEL CHARGEABILITY AT 3,700 m ELEVATION STRONG CORRELATION OF HIGH-GRADE AREAS PLAN VIEW WITH CHARGEABILITY ANOMALY 28

  29. Slide 29: Major Exploration Upside Still to be Tested

    Major Exploration Upside Still to be Tested Recent drilling at Casiterita 2km SW of Santa Barbara returned 0.17% Sn over 52.78m confirming overall extent of Iska Iska mineralizing system is much more extensive as predicted from geophysical data Iska Iska deposit is open in all directions Limits of m

  30. Slide 30: "Ore-Sorting" Game Changer

    “ORE-SORTING” GAME CHANGER Successful Bulk Metallurgical Test Recently Completed

  31. Slide 31: Schematic Flowsheet With XRT Ore Sorting

    Schematic Flowsheet With XRT1 “Ore” Sorting 1 XRT = X-RAY TRANSMISSION 2 Separation chambers can be switched depending on nature of feed to optimize compressed air usage. 31

  32. Slide 32: Ore-Sorting – Major Advantages for Potential Productions

    “Ore-Sorting” – Major Advantages for Potential Productions Bulk Open Pit Mining lowers operating costs High Grade Low Grade Medium Grade compared with selective mining, but creates dilution Dilution is removed by Ore Sorting and DMS, this reduced downstream capital costs Crushing and ore sorting is

  33. Slide 33: Positive Bulk Metallurgical Tests

    Positive Bulk Metallurgical Tests Bulk Metallurgical tests from a 6.3 tonne PQ drill The metallurgical tests confirm the core bulk sample representative of the higher grade viability of “Ore” Sorting and Dense Polymetallic (Ag-Zn-Pb) Domain returned a significantly higher average silver value of 91

  34. Slide 34: Pre-concentration Metallurgical Test Program – Diagram

    Pre-concentration Metallurgical Test Program – Diagram 6,300 kg crushed to -60 mm and the screened into 2,137 kg of -60 mm + 25 mm for “Ore” Sorter Cascade Test 2,689 kg of -25 mm + 9.5 mm for “Ore” Sorter Cascade Test Sub sample of 278 kg of -9.5 mm + 5.0 mm for Heavy Liquid Testwork Sub Sample of

  35. Slide 35: Trade off Study – Metal Recovery/Revenue Vs Capex/Opex

    Trade off Study – Metal Recovery/Revenue Vs Capex/Opex The outputs of the pre-concentrate testwork at different weight yields and metal recoveries will now be economically optimised to provide the optimum solution. “Ore” Sorting and DMS Combination Versus All “Ore” Sorting or all Dense Media Separat

  36. Slide 36: Iska Iska Joins Giant Deposits of Bolivian Tin Belt

    Iska Iska Joins Giant Deposits of Bolivian Tin Belt Dr. Osvaldo Arce, P.Geo., General Manager of Minera Tupiza and the author of Yacimientos Metaliferos de Bolivia, the authoritative book on metalliferous deposits of Bolivia commented: “Iska Iska, which is a very large “Bolivian-type” polymetallic p

  37. Slide 37: Conclusions

    Conclusions Iska Iska has the potential to host two world class deposits in the same property which Eloro believes is an extraordinary opportunity Bolivia is a mining friendly In just 3 years and 56 million Very strong Bolivian country that is significantly in equity financings, Eloro has operationa

  38. Slide 38: Next Steps – Definition Drilling, More Met Work and PEA

    Next Steps – Definition Drilling, More Met Work and PEA Robust Initial Inferred Mineral Inaugural mineral resource confirms New chargeability high Resource Estimate of 560Mt at Iska Iska as a giant deposit in the southeast of MRE pit extends 13.8 g Ag/t, 0.73% Zn & 0.28% prolific Bolivian Tin Belt m

  39. Slide 39: Appendix: Summary Notes MRE

    APPENDIX Summary Notes MRE 39

  40. Slide 40: Summary, Iska Iska Initial Mineral Resources at August 19, 2023

    Summary, Iska Iska Initial Mineral Resources at August 19, 2023 Notes: 1. The mineral resources have been estimated in accordance with the CIM Best domain = US$5.29/t comprising US$0.40/t for pre-concentration followed by Practice Guidelines (2019) and the CIM Definition Standards (2014). US$13.80 f

  41. Slide 41: Contact

    TSX ELO | FSE P2Q | OTCQX ELRRF CANADA BOLIVIA Thomas Larsen Dr. Osvaldo Arce Ph.D., P.Geo. CEO General Manager, Jimena Moran Minera Tupiza S.R.L. V.P. Marketing and Logistics – Tel: +59 171 591-004 Executive Assistant Bilingual Toll Free: 1 800 360-8006 Tel: 1 416 868-9168 20 Adelaide Street East,