  1. Slide 1: City of Cleveland Concept Review Presentation

    Slide 1: City of Cleveland Concept Review Presentation

    20 July 2021 City of Cleveland Concept Review Presentation PICKARD CHILTON | HGA | VOCON | WELTY-GILBANE J.V.

  2. Slide 2: Concept Design Review

    Slide 2: Concept Design Review

    Concept Design 1. Project Summary Review 2. Catalyst for Growth 20 July 2021 3. Site & Context 4. Concept Design 5. High-rise Towers in Urban Context 6. Progress Update Schematic Design 7. Appendix BUILDING OUR FUTURE 20 July 2021 City of Cleveland Concept Review Presentation PROPERTY OF THE SHERWIN

  3. Slide 3: Project Summary

    Slide 3: Project Summary

    1 PROJECT SUMMARY BUILDING OUR FUTURE 20 July 2021 City of Cleveland Concept Review Presentation PROPERTY OF THE SHERWIN-WILLIAMS COMPANY | Page 3

  4. Slide 4: Sherwin-Williams Headquarters

    Slide 4: Sherwin-Williams Headquarters

    Sherwin-Williams Headquarters Pavilion: • Visitor entry • Center of Excellence • Learning & development • Approximately 50,000 GSF • 2 stories Headquarters Tower: • Employee lobby • Workplace for more than 3,000 employees • Conference, dining, wellness • Loading dock & central plant • Approximately

  5. Slide 5: Design Review Approvals Timeline

    Slide 5: Design Review Approvals Timeline

    Design Review Approvals Timeline *EXACT DATES COULD BE SUBJECT TO CHANGE AND SHOULD NOT BE CONSIDERED FINAL. Design Process Submission Meeting Concept July 1, 2021 July 20, 2021 Schematic August 31, 2021 September 14 2021 Final November 16, 2021 November 30, 2021 BUILDING OUR FUTURE 20 July 2021 Cit

  6. Slide 6: Catalyst for Growth

    Slide 6: Catalyst for Growth

    2 CATALYST FOR GROWTH BUILDING OUR FUTURE 20 July 2021 City of Cleveland Concept Review Presentation PROPERTY OF THE SHERWIN-WILLIAMS COMPANY | Page 6

  7. Slide 7: Oklahoma City & Devon Energy Headquarters

    Slide 7: Oklahoma City & Devon Energy Headquarters

    CATALYST FOR GROWTH Oklahoma City & Devon Energy Headquarters BUILDING OUR FUTURE 20 July 2021 City of Cleveland Concept Review Presentation PROPERTY OF THE SHERWIN-WILLIAMS COMPANY | Page 7

  8. Slide 8: Oklahoma City & Devon Energy Headquarters

    Slide 8: Oklahoma City & Devon Energy Headquarters

    CATALYST FOR GROWTH Oklahoma City & Devon Energy Headquarters 2012 2021 OKLAHOMA CITY OKLAHOMA CITY OK OK Devon Energy Center Devon Energy Center NEW DEVELOPMENT CATALYZED BY DEVON ENERGY CENTER BUILDING OUR FUTURE 20 July 2021 City of Cleveland Concept Review Presentation PROPERTY OF THE SHERWIN-WI

  9. Slide 9: Milwaukee & Northwestern Mutual Headquarters

    Slide 9: Milwaukee & Northwestern Mutual Headquarters

    CATALYST FOR GROWTH Milwaukee & Northwestern Mutual Headquarters BUILDING OUR FUTURE 20 July 2021 City of Cleveland Concept Review Presentation PROPERTY OF THE SHERWIN-WILLIAMS COMPANY | Page 9

  10. Slide 10: Milwaukee & Northwestern Mutual Headquarters

    Slide 10: Milwaukee & Northwestern Mutual Headquarters

    CATALYST FOR GROWTH Milwaukee & Northwestern Mutual Headquarters 2017 2021 MILWAUKEE MILWAUKEE WI WI Northwestern Mutual Northwestern Mutual NEW DEVELOPMENT CATALYZED BY NORTHWESTERN MUTUAL BUILDING OUR FUTURE 20 July 2021 City of Cleveland Concept Review Presentation PROPERTY OF THE SHERWIN-WILLIAM

  11. Slide 11: City of Richmond & Dominion Energy Headquarters

    Slide 11: City of Richmond & Dominion Energy Headquarters

    CATALYST FOR GROWTH City of Richmond & Dominion Energy Headquarters BUILDING OUR FUTURE 20 July 2021 City of Cleveland Concept Review Presentation PROPERTY OF THE SHERWIN-WILLIAMS COMPANY | Page 11

  12. Slide 12: City of Richmond & Dominion Energy Headquarters

    Slide 12: City of Richmond & Dominion Energy Headquarters

    CATALYST FOR GROWTH City of Richmond & Dominion Energy Headquarters 2019 2021 RICHMOND RICHMOND VA VA Dominion Energy Dominion Energy NEW DEVELOPMENT CATALYZED BY DOMINION ENERGY BUILDING OUR FUTURE 20 July 2021 City of Cleveland Concept Review Presentation PROPERTY OF THE SHERWIN-WILLIAMS COMPANY |

  13. Slide 13: Site & Context

    Slide 13: Site & Context

    3 Site & Context BUILDING OUR FUTURE 20 July 2021 City of Cleveland Concept Review Presentation PROPERTY OF THE SHERWIN-WILLIAMS COMPANY | Page 13

  14. Slide 14: Sherwin-Williams Headquarters Site

    Slide 14: Sherwin-Williams Headquarters Site

    Site & Context Sherwin-Williams Headquarters Site Key Tower Cleveland Memorial Shoreway Terminal Tower First Energy Stadium Rock & Roll Detro 200 Public Square Hall of Fame it-Sup erior B ridge Cleveland Mall Current Sherwin-Williams HQ Public Square St. C lair Ave Sup . erio r Av Rocket Mortgage Fi

  15. Slide 15: Public Square Relationship

    Slide 15: Public Square Relationship

    Site & Context Public Square Relationship Warehouse District Weston North Site Vacated Frankfort Ave. Weston South Site Frank fort A ve. Jacobs Site Rock well Ave. ay dw oa Public Square tR es W Sup erio r Av e. BUILDING OUR FUTURE 20 July 2021 City of Cleveland Concept Review Presentation PROPERTY

  16. Slide 16: Warehouse District Relationship

    Slide 16: Warehouse District Relationship

    Site & Context Warehouse District Relationship Cleveland Memorial Shoreway Warehouse District Sain t Cl air A ve. Weston North Site t. dS Su 6 r pe s t We rio Vacated Frankfort Ave rA . St ve rd . Weston South Site t3 es W BUILDING OUR FUTURE 20 July 2021 City of Cleveland Concept Review Presentatio

  17. Slide 17: Existing Site Conditions, Parking, & Curb Cuts

    Slide 17: Existing Site Conditions, Parking, & Curb Cuts

    Site & Context Existing Site Conditions, Parking, & Curb Cuts St Clair Ave. Existing Surface Parking Lots = +/- 987 spaces • 148 Jacobs Site surface parking spaces Building Gilman • 352 Weston South surface parking spaces • 463 Weston North surface parking spaces • 18 Frankfort On-Street Parking • 6

  18. Slide 18: Context Photos

    Slide 18: Context Photos

    Site & Context Context Photos W 3rd St. W 6th St. B A St Clair Ave. A - St. Clair at W 6th facing west B - St. Clair & W 3rd facing southeast Frankfort Ave. D E C Rockwell Ave. W Roadway G H Superior Ave. F C - W 6th facing north D - Frankfort facing west from 3rd E - Frankfort facing west F - W 6th

  19. Slide 19: Zoning Summary

    Slide 19: Zoning Summary

    Site & Context Zoning Summary Jacobs Site GR-9 - General Retail Business Design Review District - Downtown / Flats Local Landmark District - N/A Overlay District - N/A Height District - 9 Weston North & South Sites LLR-9 - Limited Retail Business Design Review District - Downtown / Flats Local Landm

  20. Slide 20: Transit & Parking

    Slide 20: Transit & Parking

    Site & Context Transit & Parking LEGEND Sherwin-Williams Future Headquarters Existing Surface Parking used by Sherwin-Williams employees Existing Structured Parking used by Sherwin-Williams employees Other Cleveland Surface Parking Other Cleveland Structured Parking Existing Bus Stops Train Routes a

  21. Slide 21: Concept Design

    Slide 21: Concept Design

    4 Concept Design BUILDING OUR FUTURE 20 July 2021 City of Cleveland Concept Review Presentation PROPERTY OF THE SHERWIN-WILLIAMS COMPANY | Page 21

  22. Slide 22: Proposed Master Plan with Future Development Concept

    Slide 22: Proposed Master Plan with Future Development Concept

    Concept Design Proposed Master Plan with Future Development Concept St. Clair Ave. Future Residential or Retail LEGEND TBD (for example 3 Stories) GILMAN BLDG. Sherwin-Williams HQ Future Expansion TBD N Garage Exit Future West 3rd St. West 6th St. Commercial Retail & RETAIL LINER PARKING GARAGE Offi

  23. Slide 23: Proposed Master Plan with Phase Surface Parking

    Slide 23: Proposed Master Plan with Phase Surface Parking

    Concept Design Proposed Master Plan with Phase 1 Surface Parking St. Clair Ave. LEGEND GILMAN BLDG. Sherwin-Williams HQ N ±145 Spaces Garage Exit West 3rd St. West 6th St. RETAIL LINER PARKING GARAGE ±920 Cars 4 Levels Above Grade 1 Level Below Grade 55 PUBLIC SQUARE Garage Existing Curbline Entry B

  24. Slide 24: Proposed Master Plan with Phase Surface Parking

    Slide 24: Proposed Master Plan with Phase Surface Parking

    Concept Design Proposed Master Plan with Phase 1 Surface Parking St. Clair Ave. Proposed Phase 1 Parking Condition = +/- 1,200 spaces • 920 Parking Garage spaces GILMAN • 135 Weston South surface parking spaces BLDG. • 145 Weston North surface parking spaces ±145 Spaces Garage Exit West 3rd St. West

  25. Slide 25: Cleveland Context & Sherwin-Williams Headquarters Site

    Slide 25: Cleveland Context & Sherwin-Williams Headquarters Site

    Concept Design Cleveland Context & Sherwin-Williams Headquarters Site W es to n No rth Sit e W es to Sit n So e uth Ja c Sit obs e LEGEND Sherwin-Williams HQ Site N BUILDING OUR FUTURE 20 July 2021 City of Cleveland Concept Review Presentation PROPERTY OF THE SHERWIN-WILLIAMS COMPANY | Page 25

  26. Slide 26: Axonometric View of Proposed Master Plan with Future Development

    Slide 26: Axonometric View of Proposed Master Plan with Future Development

    Concept Design Axonometric View of Proposed Master Plan with Future Development Concept E FIC ER OF OW T G R KIN GE PA ARA G ER IN ILL TA RE ION AVIL P LEGEND Sherwin-Williams HQ Future Expansion TBD N BUILDING OUR FUTURE 20 July 2021 City of Cleveland Concept Review Presentation PROPERTY OF THE SHE

  27. Slide 27: Axonometric View of Proposed Master Plan with Phase 1 Surface Parking

    Slide 27: Axonometric View of Proposed Master Plan with Phase 1 Surface Parking

    Concept Design Axonometric View of Proposed Master Plan with Phase 1 Surface Parking E FIC ER OF OW T G R KIN GE PA ARA G ER IN ILL TA RE ION AVIL P LEGEND Sherwin-Williams HQ N BUILDING OUR FUTURE 20 July 2021 City of Cleveland Concept Review Presentation PROPERTY OF THE SHERWIN-WILLIAMS COMPANY |

  28. Slide 28: Pavilion & Podium Connections

    Slide 28: Pavilion & Podium Connections

    Concept Design Pavilion & Podium Connections Tower Above Office & Work Space G E R G E A ID A G BR T ED P O Level 2 - Podium Food Service and Lobby Y B B LO P ID B E G R D E Level 2 - Pavilion t. Learning & Development S LO th B 6 B st Y e W Lo a d in g D o ck Level 1 - Podium Lobby, Loading Dock, a

  29. Slide 29: Contextual Building Heights

    Slide 29: Contextual Building Heights

    Concept Design Contextual Building Heights The new Sherwin-Williams Headquarters Tower will be a prominent addition to Cleveland’s skyline, in scale with the adjacent high-rise buildings surrounding Public Square. The Pavilion will create a welcoming entry presence at the pedestrian scale. The Garag

  30. Slide 30: High-rise Towers in Urban Context

    Slide 30: High-rise Towers in Urban Context

    5 HIGHRISE TOWERS IN URBAN CONTEXT BUILDING OUR FUTURE 20 July 2021 City of Cleveland Concept Review Presentation PROPERTY OF THE SHERWIN-WILLIAMS COMPANY | Page 30

  31. Slide 31: Northwestern Mutual Tower & Commons, Milwaukee WI

    Slide 31: Northwestern Mutual Tower & Commons, Milwaukee WI

    HIGHRISE TOWERS IN URBAN CONTEXT Northwestern Mutual Tower & Commons, Milwaukee WI BUILDING OUR FUTURE 20 July 2021 City of Cleveland Concept Review Presentation PROPERTY OF THE SHERWIN-WILLIAMS COMPANY | Page 31

  32. Slide 32: River Point, Chicago IL

    Slide 32: River Point, Chicago IL

    HIGHRISE TOWERS IN URBAN CONTEXT River Point, Chicago IL BUILDING OUR FUTURE 20 July 2021 City of Cleveland Concept Review Presentation PROPERTY OF THE SHERWIN-WILLIAMS COMPANY | Page 32

  33. Slide 33: 300 North LaSalle, Chicago IL

    Slide 33: 300 North LaSalle, Chicago IL

    HIGHRISE TOWERS IN URBAN CONTEXT 300 North LaSalle, Chicago IL BUILDING OUR FUTURE 20 July 2021 City of Cleveland Concept Review Presentation PROPERTY OF THE SHERWIN-WILLIAMS COMPANY | Page 33

  34. Slide 34: Progress Update Schematic Design

    Slide 34: Progress Update Schematic Design

    6 PROGRESS UPDATE SCHEMATIC DESIGN BUILDING OUR FUTURE 20 July 2021 City of Cleveland Concept Review Presentation PROPERTY OF THE SHERWIN-WILLIAMS COMPANY | Page 34

  35. Slide 35: Views from the Tower

    Slide 35: Views from the Tower

    Progress Update Schematic Design Views from the Tower Views to Lake Erie Views to Warehouse District Views to City Hall / Rock & Roll Hall of Fame Views to the Flats LEGEND Sherwin-Williams HQ Site Views to Public Square Views to Gateway District N BUILDING OUR FUTURE 20 July 2021 City of Cleveland

  36. Slide 36: View to the Tower

    Slide 36: View to the Tower

    Progress Update Schematic Design View to the Tower View from Cleveland Memorial Shoreway BUILDING OUR FUTURE 20 July 2021 City of Cleveland Concept Review Presentation PROPERTY OF THE SHERWIN-WILLIAMS COMPANY | Page 36

  37. Slide 37: Tower Massing Strategies

    Slide 37: Tower Massing Strategies

    Progress Update Schematic Design Tower Massing Strategies Top 990’ • Serve as a landmark on the skyline • Architectural lighting opportunity Top • Visible from numerous vantage points 825’ with increased height Middle 660’ Top • Articulated to avoid monolithic appearance • Emphasize slender, vertica

  38. Slide 38: Aspect Ratio

    Slide 38: Aspect Ratio

    Progress Update Schematic Design Aspect Ratio 130’ width 100’ width Aspect ratio is a proportional relationship between a building’s 990’ height and width. 825’ 660’ 495’ 888’ 709’ 330’ 165’ Key Tower Terminal Tower 6.8 : 1 7:1 BUILDING OUR FUTURE 20 July 2021 City of Cleveland Concept Review Presen

  39. Slide 39: Public Square Relationship

    Slide 39: Public Square Relationship

    Progress Update Schematic Design Public Square Relationship 616’ 200 Public Square Public Square Terminal Tower Sherwin-Williams HQ TBD SHW Rockefeller Building Future Expansion BUILDING OUR FUTURE 20 July 2021 City of Cleveland Concept Review Presentation PROPERTY OF THE SHERWIN-WILLIAMS COMPANY |

  40. Slide 40: Level Plan

    Slide 40: Level Plan

    Progress Update Schematic Design Level 1 Plan St. Clair Ave. LEGEND GILMAN BLDG. Sherwin-Williams HQ Sherwin-Williams Lobby N ±145 Spaces Garage Exit West 3rd St. West 6th St. RETAIL LINER PARKING GARAGE ±920 Cars 4 Levels Above Grade 1 Level Below Grade 55 PUBLIC SQUARE Garage Entry Existing Curb l

  41. Slide 41: Level Plan

    Slide 41: Level Plan

    Progress Update Schematic Design Level 2 Plan St. Clair Ave. LEGEND GILMAN BLDG. Sherwin-Williams HQ Sherwin-Williams Lobby N ±145 Spaces Garage Exit West 3rd St. West 6th St. RETAIL LINER PARKING GARAGE ±920 Cars 4 Levels Above Grade 1 Level Below Grade 55 PUBLIC SQUARE Garage Entry Existing Curb l

  42. Slide 42: Tower Aspect Ratio

    Slide 42: Tower Aspect Ratio

    Progress Update Schematic Design Tower Aspect Ratio Aspect ratio is a Concept Schematic proportional relationship Design Design between a building’s Massing Massing height and width. Height : Height : Width Width 3:1 5:1 7:1 616’ 616’ 220’ 120’ 90’ BUILDING OUR FUTURE 20 July 2021 City of Cleveland

  43. Slide 43: Tower Concept - Design Step 1

    Slide 43: Tower Concept - Design Step 1

    Progress Update Schematic Design Tower Concept - Design Step 1 N BUILDING OUR FUTURE 20 July 2021 City of Cleveland Concept Review Presentation PROPERTY OF THE SHERWIN-WILLIAMS COMPANY | Page 43

  44. Slide 44: Tower Concept - Design Step 2

    Slide 44: Tower Concept - Design Step 2

    Progress Update Schematic Design Tower Concept - Design Step 2 N BUILDING OUR FUTURE 20 July 2021 City of Cleveland Concept Review Presentation PROPERTY OF THE SHERWIN-WILLIAMS COMPANY | Page 44

  45. Slide 45: Tower Concept - Design Step 3

    Slide 45: Tower Concept - Design Step 3

    Progress Update Schematic Design Tower Concept - Design Step 3 N BUILDING OUR FUTURE 20 July 2021 City of Cleveland Concept Review Presentation PROPERTY OF THE SHERWIN-WILLIAMS COMPANY | Page 45

  46. Slide 46: Tower Concept - Design Step 4

    Slide 46: Tower Concept - Design Step 4

    Progress Update Schematic Design Tower Concept - Design Step 4 Views to Warehouse District Views to Lake Erie Height of urban datum Views to Public Square Views to the Flats N BUILDING OUR FUTURE 20 July 2021 City of Cleveland Concept Review Presentation PROPERTY OF THE SHERWIN-WILLIAMS COMPANY | Pa

  47. Slide 47: View from Southeast

    Slide 47: View from Southeast

    Progress Update Schematic Design View from Southeast Tower Garage Podium Pavilion BUILDING OUR FUTURE 20 July 2021 City of Cleveland Concept Review Presentation PROPERTY OF THE SHERWIN-WILLIAMS COMPANY | Page 47

  48. Slide 48: Pavilion & Podium Connections

    Slide 48: Pavilion & Podium Connections

    SCHEMATIC DESIGN PROGRESS Pavilion & Podium Connections Tower Above Office & Work Space g e ra g a d e G Bri to d e P Level 2 - Podium Food Service and Lobby P dg B e e ri d Level 2 - Pavilion t. Learning & Development S th 6 st e W Lo a d in g D o ck Level 1 - Podium Lobby, Loading Dock, and Suppor

  49. Slide 49: View to the Tower

    Slide 49: View to the Tower

    Progress Update Schematic Design View to the Tower View from Cleveland Memorial Shoreway BUILDING OUR FUTURE 20 July 2021 City of Cleveland Concept Review Presentation PROPERTY OF THE SHERWIN-WILLIAMS COMPANY | Page 49

  50. Slide 50: Model Photos

    Slide 50: Model Photos

    Progress Update Schematic Design Model Photos BUILDING OUR FUTURE 20 July 2021 City of Cleveland Concept Review Presentation PROPERTY OF THE SHERWIN-WILLIAMS COMPANY | Page 50

  51. Slide 51: Model Photos

    Slide 51: Model Photos

    Progress Update Schematic Design Model Photos BUILDING OUR FUTURE 20 July 2021 City of Cleveland Concept Review Presentation PROPERTY OF THE SHERWIN-WILLIAMS COMPANY | Page 51

  52. Slide 52: Model Photos

    Slide 52: Model Photos

    Progress Update Schematic Design Model Photos BUILDING OUR FUTURE 20 July 2021 City of Cleveland Concept Review Presentation PROPERTY OF THE SHERWIN-WILLIAMS COMPANY | Page 52

  53. Slide 53: Appendix

    Slide 53: Appendix

    7 APPENDIX BUILDING OUR FUTURE 20 July 2021 City of Cleveland Concept Review Presentation PROPERTY OF THE SHERWIN-WILLIAMS COMPANY | Page 53

  54. Slide 54: Building Our Future

    Slide 54: Building Our Future

    Building Our Future Sherwin-Williams currently operates out of a 90-year-old headquarters Sherwin-Williams plans to invest more than $300 million to build its new building that, while serving us well for decades, is no longer able to meet the headquarters that will house more than 3,100 employees. O

  55. Slide 55: Sherwin-Williams Headquarters

    Slide 55: Sherwin-Williams Headquarters

    Sherwin-Williams Headquarters Three blocks in the heart of downtown Cleveland, between Superior and St. Clair Avenues, and between West Roadway and West 6th Street will be transformed into the new Headquarters campus for Sherwin-Williams. Their program includes a learning and development Pavilion to

  56. Slide 56: Existing Conditions Survey Part 1 of 2

    Slide 56: Existing Conditions Survey Part 1 of 2

    APPENDIX Existing Conditions Survey Part 1 of 2 BUILDING OUR FUTURE 20 July 2021 City of Cleveland Concept Review Presentation PROPERTY OF THE SHERWIN-WILLIAMS COMPANY | Page 56

  57. Slide 57: Existing Conditions Survey Part 2 of 2

    Slide 57: Existing Conditions Survey Part 2 of 2

    APPENDIX Existing Conditions Survey Part 2 of 2 BUILDING OUR FUTURE 20 July 2021 City of Cleveland Concept Review Presentation PROPERTY OF THE SHERWIN-WILLIAMS COMPANY | Page 57

  58. Slide 58

    Slide 58