Pacific Gas & Electric Co. · NYSE:PCG

Pacific Gas & Electric — PG&E — Q2 2015 Earnings Presentation

34 slides from Pacific Gas & Electric's earnings presentation, Jul 29, 2015

  1. Slide 1: Second Quarter Earnings Call

    SECOND QUARTER EARNINGS CALL July 29, 2015

  2. Slide 2: Safe Harbor Statements

    Safe Harbor Statements Management's statements providing guidance for PG&E Corporation’s 2015 financial results and the underlying assumptions and forecasts (including those relating to unrecovered costs, capital expenditures, rate base, equity issuances, authorized revenues, and general earnings se

  3. Slide 3: Key Focus Areas

    Key Focus Areas Positioning PG&E for a Clean Energy Economy • Grid of Things™ • Greenhouse gas reduction policy • Updated rate structures Deliver on Customer Expectations • Unwavering safety focus • Community and stakeholder engagement • Affordable and reliable service Address Outstanding Issues • R

  4. Slide 4: Regulatory and Operational Update

    Regulatory and Operational Update Regulatory Update • Electric Distribution Resource Plan – Filed with CPUC in July • Residential Rate OIR – Final decision issued in July • Net Energy Metering – Filing in August • Gas Transmission and Storage rate case – Two separate decisions Executing on Operation

  5. Slide 5: Q2 2015 Earnings Results

    Q2 2015 Earnings Results Earnings EPS (millions) Earnings from Operations $ 442 $ 0.91 Items Impacting Comparability Pipeline Related Expenses (9) (0.02) Legal and Regulatory Related Expenses (10) (0.02) Fines and Penalties (44) (0.09) Insurance Recoveries 23 0.05 Earnings on a GAAP Basis $ 402 $ 0.

  6. Slide 6: Q2 2015: Quarter over Quarter Comparison

    Q2 2015: Quarter over Quarter Comparison EPS from Operations $0.06 $1.00 $0.04 $0.05 $0.21 ($0.09) ($0.03) ($0.02) $0.80 $0.60 $0.91 $0.40 $0.69 $0.20 $0.00 Q2 2014 EPS 2014 GRC delay Growth in rate Timing of taxes Miscellaneous Impact of GT&S Gain on Increase in Q2 2015 EPS from Operations base ear

  7. Slide 7: 2015 Earnings Per Share Guidance

    2015 Earnings Per Share Guidance Low High Estimated EPS on an Earnings from Operations Basis $ 2.90 $ 3.10 Estimated Items Impacting Comparability Pipeline related expenses (0.18) (0.12) Legal and regulatory related expenses (0.09) (0.03) Fines and penalties (1) ~(1.17) ~(1.17) Insurance Recoveries

  8. Slide 8: Assumptions for 2015

    Assumptions for 2015 Capital Expenditures Authorized Rate Base (weighted average) ($ millions) ($ billions) 2015 2015 Electric Distribution 1,950 Electric Distribution 13.1 Electric Transmission 1,150 Electric Transmission 5.1 (1) Gas Transmission 650 Gas Transmission (3) 1.8 Gas Distribution 900 Ga

  9. Slide 9: 2015 Items Impacting Comparability

    2015 Items Impacting Comparability ($ millions, pre-tax) 2015 Pipeline related expenses 100 - 150 Legal and regulatory related expenses 25 - 75 Fines and penalties (1) ~900 Insurance recoveries (39) 2015 Items Impacting Comparability Total ~$986 - 1,086 Fines and penalties (millions, pre-tax) Fine p

  10. Slide 10: CPUC Penalty Decision in Gas Transmission Pipeline Investigations

    CPUC Penalty Decision in Gas Transmission Pipeline Investigations Previously Estimated Estimated Future ($ millions) Incurred 2015 Periods Total (1) Fine payable to the State 200 100 300 Customer bill credit (2) 400 400 Charge for disallowed capital (3) ~400 ~300 ~700 Disallowed revenue for pipeline

  11. Slide 11: 2015 Equity Issuance

    2015 Equity Issuance $700M - 800M 2015 2014 EOY shares outstanding: 476M June 30, 2015 shares outstanding: 481M Changes from prior quarter are noted in blue. See the Safe Harbor Statements for factors that could cause actual results to differ materially from the guidance presented and underlying ass

  12. Slide 12: Capital Expenditures 2014-2016

    Capital Expenditures 2014-2016 $5.3B - 5.8B* ~$5.5B* $4.9B 2014 2015 2016 Recorded (1) * Range reflects recent regulatory decisions, current or planned regulatory filings, and historic spending patterns and includes ~$400 million in 2015 and ~$300 million in 2016 ($689 million total) for estimated c

  13. Slide 13: Rate Base Growth 2014-2016

    Rate Base Growth 2014-2016 2014-2016 Weighted Average Authorized Rate Base CAGR: ~8% $32.9 - 33.3B* ~$29.5B* ~$28.2B 2014 2015 2016 * Range reflects recent regulatory decisions, current or planned regulatory filings, and historic spending patterns. Changes from prior quarter are noted in blue. See t

  14. Slide 14: Appendix – Regulatory and Guidance Matters

    Appendix 1 – Regulatory and Guidance Matters • Updates to Appendix 1 Since the Previous Quarter slide 15 Regulatory • 2015 CPUC Gas Transmission and Storage Rate Case slide 16 • CPUC General Rate Cases slide 17 • FERC Transmission Owner Rate Cases slide 18 • Gas Regulatory Proceedings Schedule slide

  15. Slide 15: Updates to Appendix Since the Previous Quarter

    Updates to Appendix 1 Since the Previous Quarter • Slide 16 2015 CPUC Gas Transmission and Storage Rate Case • Slide 18 FERC Transmission Owner Rate Cases • Slide 19 Gas Regulatory Proceedings Schedule 15

  16. Slide 16: 2015 CPUC Gas Transmission and Storage Rate Case

    2015 CPUC Gas Transmission and Storage Rate Case • Application filed with the CPUC on December 19, 2013 • Request for authorized revenue requirement for 2015-2017 – Includes operating costs and capital for CPUC jurisdictional gas transmission and storage • 2015 requested revenue requirement of $1.3

  17. Slide 17: CPUC General Rate Cases

    CPUC General Rate Cases 2014 GRC • General Rate Case set base revenue requirement for 2014-2016 – Includes operating costs and capital for generation and electric and gas distribution – Excludes cost of capital determination, electric transmission, gas transmission, and cost of fuel and purchased po

  18. Slide 18: FERC Transmission Owner Rate Case

    FERC Transmission Owner Rate Case TO16 • July 2, 2015 – PG&E filed a proposed settlement • Settlement includes revenue requirement of $1.2 billion, a $161 million increase over TO15 • FERC approval expected in late 2015 or early 2016 TO17 • July 29, 2015 – TO17 filed with FERC • Requested revenue re

  19. Slide 19: Gas Regulatory Proceedings Schedule

    Gas Regulatory Proceedings Schedule 7/1: Final Decision Gas Pipeline adopting revised Safety OIR General Order 112-F R. 11-02-019 for Gas Transmission and Distribution 9/30: SED supplemental Gas Distribution testimony and work OII and Order to papers Show Cause I. 14-11-008 June August 2015 May July

  20. Slide 20: Incremental Equity Factors

    Incremental Equity Factors Incremental Equity Factors for CPUC Final Penalty Decision Equity Impacting Event Multiplier Fine payable to State (1) 100% Customer bill credit (2) (4) 60% Charge for disallowed capital (3) (4) 30% Disallowed revenue for pipeline safety expenses (2) (4) 60% CPUC estimated

  21. Slide 21: Appendix 2 – Supplemental Earnings Materials

    Appendix 2 – Supplemental Earnings Materials Exhibit A: Reconciliation of PG&E Corporation Earnings from Operations to Consolidated slide 22 Income Available for Common Shareholders in Accordance with GAAP Exhibit B: Key Drivers of PG&E Corporation Earnings per Common Share from Operations slide 23

  22. Slide 22: Exhibit A: Reconciliation of Earnings from Operations to GAAP

    Exhibit A: Reconciliation of PG&E Corporation Earnings from Operations to Consolidated Income Available for Common Shareholders in Accordance with Generally Accepted Accounting Principles (“GAAP”) Second Quarter and Year to Date (“YTD”), 2015 vs. 2014 Three Months Ended June 30, 2015 Six Months Ende

  23. Slide 23: Exhibit B: Key Drivers of EPS from Operations

    Exhibit B: Key Drivers of PG&E Corporation Earnings per Common Share (“EPS”) from Operations Second Quarter and YTD, 2015 vs. 2014 ($/Share, Diluted) Second Quarter 2014 EPS from Operations (1) $ 0.69 2014 GRC cost recovery (2) 0.21 Growth in rate base earnings 0.05 Timing of taxes (3) 0.04 Miscella

  24. Slide 24: Exhibit C: Operational Performance Metrics

    Exhibit C: Operational Performance Metrics 2015 Performance Results Q2 YTD EOY Meets YTD Actual Target Target (1) Safety (includes both public and employee safety metrics) Nuclear Operations Safety Unit 1 Performance Indicator 90.38 94.20  Unit 2 Performance Indicator 96.64 94.20  Gas Operations S

  25. Slide 25: Definitions of 2015 Operational Performance Metrics

    Definitions of 2015 Operational Performance Metrics from Exhibit C Safety Public and employee safety are measured in four areas: (1) Nuclear Operations Safety, (2) Gas Operations Safety, (3) Electric Operations Safety, and (4) Employee Safety. 1. The safety of the Utility’s nuclear power operations,

  26. Slide 26: Exhibit D: Sales and Sources Summary

    Exhibit D: Pacific Gas and Electric Company Sales and Sources Summary Second Quarter and YTD, 2015 vs. 2014 Three Months Ended June 30, Six Months Ended June 30, 2015 2014 2015 2014 Sales from Energy Deliveries (in millions kWh) 20,682 20,847 40,041 40,231 Total Electric Customers at June 30 5,300,4

  27. Slide 27: Exhibit E: Earnings Per Share Guidance

    Exhibit E: PG&E Corporation Earnings Per Share Guidance 2015 EPS Guidance Low High Estimated EPS on an Earnings from Operations Basis $ 2.90 $ 3.10 Estimated Items Impacting Comparability: (1) Pipeline related expenses (2) (0.18) (0.12) Legal and regulatory related expenses (3) (0.09) (0.03) Fines a

  28. Slide 28: Exhibit F: General Earnings Sensitivities

    Exhibit F: General Earnings Sensitivities PG&E Corporation and Pacific Gas and Electric Company Estimated 2015 Variable Description of Change Earnings Impact Rate base +/- $100 million change in allowed rate base +/- $5 million Return on equity (ROE) +/- 0.1% change in allowed ROE +/- $16 million Sh

  29. Slide 29: Exhibit G: Summary of Selected Regulatory Cases

    Exhibit G: Pacific Gas and Electric Company Summary of Selected Regulatory Cases Regulatory Case Docket # Key Dates 2015 Gas Transmission and Storage Rate Case A.13-12-012 Dec 19, 2013 – Application filed Jan 16, 2014 – PG&E workshop Mar 7, 2014 – Supplemental testimony served Mar 12, 2014 – Prehear

  30. Slide 30: Exhibit G: Summary of Selected Regulatory Cases

    Exhibit G: Pacific Gas and Electric Company Summary of Selected Regulatory Cases Regulatory Case Docket # Key Dates Gas Distribution System Records Order Instituting I.14-11-008 Nov 20, 2014 – OII issued Investigation and Order to Show Cause Dec 15, 2014 – Comments on preliminary scoping memo Dec 18

  31. Slide 31: Exhibit G: Summary of Selected Regulatory Cases

    Exhibit G: Pacific Gas and Electric Company Summary of Selected Regulatory Cases Regulatory Case Docket # Key Dates Gas Pipeline Safety Order Instituting Rulemaking R.11-02-019 Dec 20, 2012 – Final decision on Pipeline Safety Enhancement Plan D.11-03-047 Jan 28, 2013 – Intervenor requests for rehear

  32. Slide 32: Exhibit G: Summary of Selected Regulatory Cases

    Exhibit G: Pacific Gas and Electric Company Summary of Selected Regulatory Cases Regulatory Case Docket # Key Dates 2014 Long-Term Procurement Plan Phase 1 R.13-12-010 Phase 1a: system reliability needs Aug 13, 2014 – Phase 1a testimony of modeling parties Phase 1b: filling system reliability needs,

  33. Slide 33: Exhibit G: Summary of Selected Regulatory Cases

    Exhibit G: Pacific Gas and Electric Company Summary of Selected Regulatory Cases Regulatory Case Docket # Key Dates Residential Rate OIR R.12-06-013 Jan 28, 2014 – Summer 2014 rate design reform proposal (Phase 2) filed Phase 1: long-term rate design D.14-06-029 Feb 28, 2014 – Long-term rate design

  34. Slide 34: Exhibit G: Summary of Selected Regulatory Cases

    Exhibit G: Pacific Gas and Electric Company Summary of Selected Regulatory Cases Regulatory Case Docket # Key Dates Net Energy Metering OIR R.14-07-002 Jul 17, 2014 – Commission issues OIR to establish net metering successor tariffs Aug 11, 2014 – Staff workshop on Public Tool Aug 18, 2014 – Comment