Slide 1: Kentor Gold – Update on Murchison Site Activities
For personal use only Kentor Gold March 2013 Update on Murchison Site Activities
Slide 2: Lewis Pit – Current Level of Pit
Lewis Pit For personal use only Current Level of Pit 2
Slide 3: Lewis Pit – New open pit mining contractor performing well
Lewis Pit 19 Feb For personal use only New open pit mining contractor performing well 3
Slide 4: NOA Underground Design – Existing workings
NOA 2 Underground Design – Existing workings shown in blue For personal use only Potential new stope
Slide 5: Alliance Resource Update – Jan 2013
Alliance Resource Update – Jan 2013 For personal use only Alliance & New Alliance May 2011 Resource Estimate (1g/t gold cut-off) Increase in Tonnes 14% Increase in Grade 22% CLASS Weathering Density Kt Gold g/t Gold koz Increase in Ounces 40% Inferred Total 2.41 828.3 1.96 52.23 Alliance & New Allia
Slide 6: NOA Resource Update – Oct 2012
NOA 7 Resource Update – Oct 2012 For personal use only NOA 7 May 2011 Resource Estimate (1g/t gold cut-off) Increase in Tonnes 29% Increase in Grade 29% CLASS Kt Gold g/t Gold koz Increase in Ounces 66% Inferred 1,000 2.3 73,900 NOA 7 Resource Update Nov 2012 (1g/t gold cut-off) CLASS Kt Gold g/t Go
Slide 7: NOA – Dec 2012 exploration drilling
NOA 2 – Dec 2012 exploration drilling For personal use only 3m @ 51.5 g/t
Slide 8: NOA – ATW drilling to be assayed
NOA 2 – ATW drilling to be assayed (Orange) For personal use only
Slide 9: Planned underground drilling at NOA
Planned underground drilling at NOA 2 For personal use only 9
Slide 10: NOA Exploration Drilling
NOA 7 Exploration Drilling For personal use only NOA 7/8, 12BNRC0281, 7011200 mN. (drilled below existing resource) Intercepts in order down-dip: 3m @ 4.18g/t; 1m @ 1.32g/t; 1m @ 2.36g/t; 3m @ 3.74g/t; 4m @ 3.23g/t
Slide 11: NOA Long Section Showing g/t * m Interval
NOA 7 and 8 Long Section Showing g/t * m Interval For personal use only 11
Slide 12: NOA Exploration Drilling
NOA 1 Exploration Drilling For personal use only NOA 1 NOA 2 12
Slide 13: NOA Exploration Drilling
NOA 1 Exploration Drilling For personal use only 10 holes to test down dip extension of NOA1 ore body. Drilling completed 1st March 2013 NOA1 is located just 200m from the NOA 2 underground workings 13
Slide 14: Discussion points
Discussion points For personal use only Underground mining achieving the planned tonnes and grade Quantity of high grade underground ore in mill feed increasing New open pit contractor performing well Grade of open pit ore increasing Changes to site management 14
Slide 15: Alliance Pit – First Cap rock Blast
First blast at Alliance pit Alliance February 2013 Pit – First Cap rock Blast For personal use only 15
Slide 16: Indee Primary Crusher
Indee Primary Crusher For personal use only Large jaw crusher now operating has improved crushing rates to well in excess of designed mill throughput rates. 16
Slide 17: Murchison Upgrade Plans
Murchison Upgrade Plans For personal use only Install Indee Secondary Crusher and Screen – June 2013 Install New Tertiary Crusher - June 2013 Resource upgrade at NOA2 – May 2013 Add Heap Leach – Authaal pit resources to be upgraded from Inferred and added to mine plan. *Tertiary crushing is
Slide 18: For more information contact
For more information contact For personal use only Simon Milroy on +61 7 3071 9003 or visit www.kentorgold.com ASX Code: KGL Level 9, 40 Creek Street, Brisbane, QLD, AUSTRALIA 4000 Fax: +61 7 3071 9008 Forward-Looking Statements: This presentation includes certain “Forward-Looking Statements”. All s
Slide 19: Competent Persons
Competent Persons For personal use only Competent Person Statements Exploration data at Murchison has been compiled by Martin Bennett who is the Exploration Manager of Kentor Minerals (AUS) Pty Limited and a Member of the Australasian Institute of Geoscientists. Martin Bennett has sufficient exper