Hastings Technology Metals Limited · ASX:HAS

Hastings Technology Metals — Hastings Rare Metals — Technology Metals Summit 2013

24 slides from Hastings Technology Metals's conference presentation, April 2013

  1. Slide 1: Heavy Rare Earths: A Strategic Opportunity

    Heavy Rare Earths A Strategic Opportunity Technology Metals Summit | April 2013 Hastings Rare Metals

  2. Slide 2: Important information

    Important information All currency amounts are in AUD$ unless stated otherwise. Disclaimer This presentation has been prepared by Hastings Rare Metals Limited (“Company”). It does not purport to contain all the information that a prospective investor may require in connection with any potential inve

  3. Slide 3: Current World Class HREO projects

    Current World Class HREO projects Advanced Rare Earth projects, sorted by contained tonnes of HREO* Deposit Company JORC Resource GRADE % HREO:TREO Contained Contained Co-products Resource mt TREO HREO HREO t Dy2O3 1. Strange Lake Quest Y 492.5 0.9 0.33 37% 1,651,000 148,980 Zr 2. Norra Karr Tasman

  4. Slide 4: Predicted major shortfall

    Predicted major shortfall Dysprosium oxide supply/demand Critical Supply Matrix (5-15yr) Hastings Tonnes p.a. 23% supply REE mix shortage 4,000 3,447 3,500 3,000 2,799 2,500 2,240 2,000 1,902 Supply Demand 1,500 1,377 1,353 1,000 500 0 2010 2015 2020 Based on IMCOA and Oko-Institute data US Departme

  5. Slide 5: China supplies +95% of rare earths

    China supplies +95% of rare earths Recent initiatives by China › Imposed export quotas, then reduced to Light rare earth: ample supply ~30,000tpa (2010) › Prohibited new operations/expansions (2012) › Eliminating 20% of processing capacity (2012) › Concentrating supply to a few (2012 & 2013) “Forget

  6. Slide 6: Potential Dy supply from Light rare earth producers

    Potential Dy supply from Light rare earth producers 1tpa Dy Very limited supply from light rare earth producers outside China 14tpa Dy New mines need a Others ? high LREO price and higher demand 6 Hastings Rare Metals

  7. Slide 7: Only a few advanced Heavy rare earth projects

    Only a few advanced Heavy rare earth projects Possible Dy Current Project Project production Supplying mine life Location (tpa) Strange Lake 470 > 100 Canada USA Norra Karr 320 40 Sweden Europe Hastings 140-200 >25 Australia ?? Zeus (Kipawa) 185 13 Canada USA Kutessay n/a n/a Kyrgystan Japan Dubbo 7

  8. Slide 8: Dy is highly valuable to the Western World

    Dy is highly valuable to the Western World Critical for Hybrid cars. Wind turbines, high-tech applications 8 Hastings Rare Metals

  9. Slide 9: Dysprosium in magnets

    Dysprosium in magnets › Dysprosium added to magnets in the generator: • Eliminates the gearbox (direct drive) and reduces weight • Less maintenance and improved performance • HAS = 20,000 3MW units or 60GW/year GE wind turbine generator › Dysprosium added to magnets in drive systems: • Increases per

  10. Slide 10: Yttrium and Niobium also of strategic value

    Yttrium and Niobium also of strategic value 39 Yttrium is used predominantly in Y phosphors › Monitors, TVs, LEDs › iPad, phones › Lasers, filters, superconductors A “Critical Metal” 41 Niobium agent is used predominantly as an Nb alloy › Structural steel › Auto industry › Electronics A “Critical Me

  11. Slide 11: Key reasons to invest in Hastings

    Key reasons to invest in Hastings Rare earths are indispensible Our Vision To become an essential supplier of heavy › Used extensively in modern manufacturing rare earths for high tech industries › Minimal practical substitution or recycling Heavy rare earths have strategic value › Higher value, lim

  12. Slide 12: The Hastings project (100%)

    The Hastings project (100%) › Largest heavy rare earth project in Australia, fourth largest globally* › Resources for +25 years at 1mtpa › To produce over 10,000tpa, including: 140tpa Dysprosium oxide Heavy 830tpa Yttrium oxide Rare 590tpa Mixed rare earth oxide earths 2,630tpa Niobium oxide Rare 6,

  13. Slide 13: Existing JORC Resource

    Existing JORC Resource › Existing Resource sufficient for +25 year mine life › Outcrops at surface › Open at depth and along strike › A large & efficient open pit operation › 36.2 million tonnes Indicated and Inferred JORC Resource* at 0.21% TREO (0.18% HREO), plus 0.35% Nb₂O₅ and 0.89% ZrO2 * Compr

  14. Slide 14: Hastings deposit dimensions

    Hastings deposit dimensions Surface Longitudinal section from the east  Efficient open cut mine  Mineralisation from surface Surface  Consistent grade and Viewed from the south metallurgy HREO GRADE  Resource is open to the north and south Shows Indicated Resources excluding Inferred Resources H

  15. Slide 15: Southern Extension

    Southern Extension › Recent mapping and sampling has identified the potential of the Southern Extension to add to the existing Resource › There is potential for higher grade mineralisation › At-Surface folding indicates potential for lower strip ratio Mineralised outcrop at southern extension Encour

  16. Slide 16: Metallurgical success

    Metallurgical success Bulk solution handling at ANSTO Multi-stage solvent extraction at ANSTO › ANSTO (Australian Government) scientists completed extensive test work and experiments › Time and cost advantage from historical work › Metallurgical recoveries of 75% for Dysprosium, Yttrium and Niobium

  17. Slide 17: Process design and flow sheet determined

    Process design and flow sheet determined  Process designed  Flow sheet determined  Optimisation work continues Sulphation Rare metals Rare earths HREO Grind Leaching baking extraction extraction purification Hastings Rare Metals 17

  18. Slide 18: Attractive economics

    Attractive economics* › 25 years mine life from existing Resource › Producing oxides of: Tonnes % world p.a. supply Dysprosium 140 10% Yttrium 830 6% Mixed heavy rare earths 590 n/a Niobium 2,630 ±3% Zirconium 6,170 <1% Port of Wyndham $720m Capital costs (excluding contingencies) $482m Annual reven

  19. Slide 19: The Yangibana project (60%)

    The Yangibana project (60%) › Exploration Licences covering 320sq km › Surface rock chip samples to 19.4% TREO › Limited drilling indicates average grade of 1.6% TREO › Very high neodymium oxide grade averaging 4000ppm Nd₂O₃ or 25% of TREO › Elevated europium oxide grade (115ppm Eu₂O₃) enhances pote

  20. Slide 20: The Yangibana project

    The Yangibana project RC DRILLING RESULTS INCLUDED Prospect m %TREO Yangibana North 7 2.21 8 2.78 4 1.83 6 2.40 Gossan 3 2.12 The Lion's Ear 4 1.80 4 2.05 4 2.73 3 1.78 4 1.77 Hook South 2 1.65 Kane's Gossan 8 1.43 5 1.18 Yangibana 2 1.25 ROCK CHIP SAMPLES INCLUDED No of Yangibana – REO Mineralisati

  21. Slide 21: Strong board & management

    Strong board & management Tony Ho Guy Robertson Steve Mackowski Chairman Executive Director Technical Director • Director of Brazin, • +25 years CFO • +30 years technical and Bioxyne, Dolomatrix, experience operational experience Greenland Minerals, • Former senior finance in rare earths and • Chair

  22. Slide 22: Significant milestones achieved

    Significant milestones achieved JORC compliant Resource Nov-11 ANSTO validates sulphation and Water Leach flowsheet Jul-12 case Scoping Study defines operating parameters and confirms strong business Sept-12 Primary solvent extraction of valuable minerals successful Nov -12  Commence feasibilit

  23. Slide 23: Additional information

    Additional information ASX Code – HAS, HASO Shares on issue 167 million Listed options Major shareholders 81 million (15c March 2014) Unlisted options 5 million Singapore investor 6% Australian Market capitalisation (at 6c) $10 million investor 15% Cash (March 2013) $3 million Japanese fund 5% Top 2

  24. Slide 24: Key reasons to invest in Hastings

    Key reasons to invest in Hastings Rare earths are indispensible Our Vision To become an essential supplier of heavy › Used extensively in modern manufacturing rare earths for high tech industries › Minimal practical substitution or recycling Heavy rare earths have strategic value › Higher value, lim

Hastings Rare Metals — Technology Metals Summit 2013 on 6ix