Star Diamond Corporation · TSX:DIAM

Star Diamond — Investor Presentation (December 2021)

28 slides from Star Diamond's investor presentation, Dec 17, 2021

  1. Slide 1: Advancing the world's largest and most attractive diamond development project

    Advancing the world’s largest and most attractive diamond development project Star - Orion South Diamond Project & Fort à la Corne Diamond District CORPORATE PRESENTATION December 17, 2021 1

  2. Slide 2: Forward Looking Statements

    Forward Looking Statements This presentation contains "forward-looking statements" and/or "forward-looking information" within the meaning of applicable securities laws (collectively referred to as "forward-looking statements"). Forward-looking statements are often, but not always, identified by the

  3. Slide 3: Star Diamond's most significant asset is its interest in the Fort à la Corne property

    Star Diamond’s most significant asset is its interest in the Fort à la Corne property in central Saskatchewan • Star Diamond Corporation currently holds, through a joint venture arrangement with Rio Tinto Exploration Canada, a 25% participating interest in certain Fort à la Corne mineral disposition

  4. Slide 4: Star Diamond is Focused on Advancing the World's Largest and Most Attractive Diamond Development Project

    Star Diamond is Focused on Advancing the World’s Largest and Most Attractive Diamond Development Project Star-Orion South Diamond Project: • Large, long-life mine: ~66 million carats over 38-year mine life 1 • Outstanding geology: large, contiguous diamond bearing kimberlites hosting very attractive

  5. Slide 5: Star – Orion Results Indicate Favourable Comparison to Current Producers

    Star – Orion Results Indicate Favourable Comparison to Current Producers • Valuation of diamond deposits dependent on tonnes, grade and STAR HAS AN UNUSUALLY COARSE SFD AND ONLY LETSENG IS COARSER diamond price • Diamond price is unique for each kimberlite • Star and Orion South have significant car

  6. Slide 6: Star and Orion South Kimberlites are Well-Understood and Project is Well-Advanced

    Star and Orion South Kimberlites are Well-Understood and Project is Well-Advanced • Diamond exploration began in 1995 • Bulk sampling programs conducted between 2003-2009 • 200 carats from Star bulk sample selected for cutting and polishing in 2007, proving high-quality polished diamonds could be pr

  7. Slide 7: Ideal Location and Jurisdiction

    Ideal Location and Jurisdiction Existing Mines Exploration and Evaluation Projects • Saskatchewan: very stable geo-political jurisdiction (rated #2 Mining Investment Jurisdiction by Fraser Institute) Nunavut Territories Northwest Naujaat Chidliak • Constructive and collaborative relationships Territ

  8. Slide 8: Proximity to existing infrastructure and labour significantly lowers operating costs

    Proximity to existing infrastructure and labour significantly lowers operating costs • Project is less than 20km from paved highway • Access to provincial power grid • Access to pool of local skilled workers including from local communities 8

  9. Slide 9: Attractive Geology: Extensive Kimberlites

    Attractive Geology: Extensive Kimberlites • Large, contiguous diamond bearing kimberlites hosting very attractive diamonds. • Star - Orion South Project located in the south-eastern part of the Fort à la Corne properties • More than 60 additional kimberlites represent exploration upside potential 9

  10. Slide 10: PEA (2018) Site Layout – General Arrangement

    PEA (2018) Site Layout – General Arrangement • Two open pits with a centralized processing plant • The Star - Orion South Diamond Project is located in the southern area of Star Diamond’s Fort à la Corne properties (for which Star Diamond holds a 25 percent carried interest) 10

  11. Slide 11: Star and Orion South Kimberlites - Core, Large Diameter Drilling and Underground Bulk Sampling

    Star and Orion South Kimberlites - Core, Large Diameter Drilling and Underground Bulk Sampling • Resource is well-understood as a result of extensive archival and current drilling • Core drilling to define the extent and internal structure of the kimberlite • Large Diameter Drilling for grade determ

  12. Slide 12: Star and Orion South Kimberlites - Core, Large Diameter Drilling and Underground Bulk Sampling

    Star and Orion South Kimberlites - Core, Large Diameter Drilling and Underground Bulk Sampling UNDERGROUND BULK SAMPLING RESULTS LARGE DIAMETER DRILLING Kimberlite Dry Tonnes Number of Total Grade Largest Stone Kimberlite Total Holes Kimberlite (m) Unit Processed Stones Carats (cpht) (carats) Unit C

  13. Slide 13: Attractive Geology

    Attractive Geology • Bulk samples have delivered excellent results: – Star: over 75,000 tonnes of ore yielded nearly 11,000 WEIGHTED AVERAGE PRICE carats, including a 49-carat stone (Per Carat USD) – Orion South: over 23,000 tonnes of ore yielded 2,300 Star: carats, including a 45-carat stone • Star

  14. Slide 14: High Value Diamonds

    High Value Diamonds Star 5.39 carat • Evaluation parcel IF $2,466/ct US$13,300 recovered to date includes these high value diamonds Star 4.77 carat Orion South 10.53 carat IF $4,535/ct • High value diamonds Fancy Yellow $8,000/ct US$84,240 US$21,600 include internally flawless octahedra, fancy yello

  15. Slide 15: Star - Orion South Contains a Significant Percentage of High-Value Type IIa Diamonds

    Star - Orion South Contains a Significant Percentage of High-Value Type IIa Diamonds • Type IIa diamonds: Star and Orion South Kimberlites - Type IIa Diamond Statistics (Diamonds +11 DTC (0.32 carats) to >10.8 carats) – contain no nitrogen or boron impurities Kimberlite Geological Diamonds Type IIa

  16. Slide 16: Preliminary Economic Analysis (2018) Demonstrates Very Attractive Economics

    Preliminary Economic Analysis (2018) Demonstrates Very Attractive Economics Surface Mine Recovery Base Case Net Present Value (7%) Payback Period After Tax ~66 Million Carats $2.0 Billion IRR 19% 3.4 Years Project Life 38 Years LOM plant feed Construction Capex LOM Capex 470 Million tonnes $1.41 Bil

  17. Slide 17: Bulk Sampling Program and Site Work by RTEC

    Bulk Sampling Program and Site Work by RTEC • Rio Tinto Exploration Canada (RTEC) embarked on a complex bulk sampling program using new RTEC Trench Cutter Holes (10) drilled on the technology derived from civil engineering Star Kimberlite during applications 2019, in relation to historical undergrou

  18. Slide 18: Bulk Sampling Program: Initial Trench Cutter Diamonds Results

    Bulk Sampling Program: Initial Trench Cutter Diamonds Results Comparison to Underground (UG) & Large Diameter Drilling (LDD) STAR EJF Kimberlite Carats Grade Stones Stones per tonne Kimberlite Tonnes (+1 DTC) (cpht) (+1DTC) (+1 DTC) Underground 43,372.18 7,425.42 17.12 56,007 1.29 LDD Inner1 8,440.5

  19. Slide 19: Resolution Reached with RTEC

    Resolution Reached with RTEC During December 2021, Star Diamond and Rio Tinto announced binding agreements that comprehensively resolve all disputes between them. As part of that resolution, Star Diamond and Rio Tinto have agreed to revised joint venture arrangements that best position the joint ven

  20. Slide 20: Experienced Management and Technical Team

    Experienced Management and Technical Team Ken MacNeill George Read President, CEO, Director Senior Technical Advisor Extensive background with over 37 years Diamond exploration geologist with 38 experience in all aspects of natural years of international experience resource exploration and developme

  21. Slide 21: With an Excellent Location, Geology & Economics, Star Diamond is Advancing the World's Largest & Most Attractive Diamond Development Project

    With an Excellent Location, Geology & Economics, Star Diamond is Advancing the World’s Largest & Most Attractive Diamond Development Project • Large, long-life mine: ~66 million carats over 38 year mine life 1 • Outstanding geology: large, contiguous diamond bearing kimberlites hosting very attracti

  22. Slide 22: Appendix

    STAR DIAM@ND CORPORATION Appendix

  23. Slide 23: Preliminary Economic Analysis (2018) Demonstrates Very Attractive Economics

    Preliminary Economic Analysis (2018) Demonstrates Very Attractive Economics NEW TECHNOLOGY PROVIDES ATTRACTIVE ECONOMICS OF PEA Total potential plant feed 470 MT Weighted average diamond grade 14 CPHT Total recovered carats 66 MCT Life of mine 34 Years Takraf compact bucketwheel excavator for removi

  24. Slide 24: Bulk Sampling Site Construction Completed by RTEC

    Bulk Sampling Site Construction Completed by RTEC KIMBERLITE SEPARATION UNIT (KSU) ON-SITE SAMPLE STORAGE AREA RTEC’s KSU recovers washed kimberlite in the size range -80 to +0.85 On-site cubic metre bulk bag storage area: 6,848 bulk bags of kimberlite millimetre, from the slurry that is pumped from

  25. Slide 25: Project Falcon Bulk Sampling Plant by RTEC

    Project Falcon Bulk Sampling Plant by RTEC 25

  26. Slide 26: Diamond Assortment: Star EJF +11 DTC

    Diamond Assortment: Star EJF +11 DTC • Star UG EJF +11DTC diamonds sorted by Type (Type I and Type II) and Colour • 2,608 stones weighing 1,601 carats • High proportion of “white” diamonds and very low proportion of boart 26

  27. Slide 27: Diamond Assortment: Orion South EJF +11 DTC

    Diamond Assortment: Orion South EJF +11 DTC • Orion South UG EJF +11DTC diamonds sorted by Type (Type I and Type II) and Colour • 772 stones weighing 310.8 carats • High proportion of “white” diamonds and very low proportion of boart 27

  28. Slide 28: Head Office: Saskatoon, Saskatchewan

    Head Office: 600, 224 - 4th Avenue South Saskatoon, Saskatchewan Canada S7K 5M5 Tel: +1 (306) 664-2202 stardiamondcorp.com @StarDiamondCorp Star Diamond Corp 28

Star Diamond — Investor Presentation (December 2021) on 6ix