  1. Slide 1: Annual General Meeting 28 November 2017

    For personal use only ENERGY WORLD CORPORATION LTD. Annual General Meeting 28 November 2017

  2. Slide 2: Disclaimer

    Disclaimer For personal use only These materials have been prepared by Energy World Group (the "Company") solely for information use during this presentation. These materials may not be copied, reproduced, passed on or redistributed, directly or indirectly, to any other person (whether within or out

  3. Slide 3: Financial Highlights 2017

    For personal use only Financial Highlights 2017 ENERGY WORLD CORPORATION

  4. Slide 4: Financial Highlights – Revenue

    Financial Highlights – Revenue For personal use only Revenue by segment 200,000 180,000 160,000 140,000 120,000 USD'000 100,000 80,000 60,000 40,000 20,000 - FY2013 Reported FY2014 Reported FY2015 Reported FY2016 Reported FY2017 Reported Revenue Revenue Revenue Revenue Revenue Australia: Oil & Gas 1

  5. Slide 5: Financial Highlights – Gross Profit

    Financial Highlights – Gross Profit For personal use only Gross Profit 120,000 100,000 80,000 USD' 000 60,000 40,000 20,000 - FY2013 FY2014 FY2015 FY2016 FY2017 Gross Profit 71,847 92,095 105,926 111,100 106,436 ENERGY WORLD CORPORATION

  6. Slide 6: Financial Highlights – Fixed Assets

    Financial Highlights – Fixed Assets For personal use only Oil & Gas Assets, PP&E, Assets Under Construction and Exploration & Evaluation Assets 1,600,000 1,400,000 1,200,000 1,000,000 USD'000 800,000 600,000 400,000 200,000 - FY2013 FY2014 FY2015 FY2016 FY2017 Oil & Gas Assets 96,264 109,954 107,294

  7. Slide 7: Business Opportunity - LNG

    For personal use only Business Opportunity - LNG ENERGY WORLD CORPORATION

  8. Slide 8: Project Development Requirement

    Project Development Requirement HARDWARE For personal use only • Processing Engineering • Equipment Design • Civil Engineering • Land Acquisition • E.P.C. Contractor SOFTWARE FINANCING • Permits • Equity • Environmental • Debt • Cultural Heritage • Project Finance • Local Community Welfare • Capital

  9. Slide 9: Teaming up with industry leaders on Modular LNG

    For personal use only Teaming up with industry leaders on Modular LNG ENERGY WORLD Investor, Developer & Operator LNG process provider Electrical and rotating Cold boxes equipment Gas treatment (By TDE) Slipform Engineering – civil works, Electrical BOP Liquefaction BOP process engineering and LNG t

  10. Slide 10: Our Projects

    Our Projects Energy World’s focus is on LNG to Asia For personal use only Projects Existing Assets Under Development South Korea Japan China Sengkang Philippines Power Plant Pakistan LNG Hub Block 1 & Block 2 Bangladesh North Pacific Ocean India Taiwan Myanmar Hong Sengkang Laos Kong Philippines Pow

  11. Slide 11: Sengkang Power Station, Indonesia

    For personal use only Sengkang Power Station Indonesia ENERGY WORLD CORPORATION

  12. Slide 12: Indonesia – Sengkang Power

    For personal use only Indonesia – Sengkang Power • The Sengkang Power Station is 315 MW, comprising of Block 1 of 135 MW and Block 2 of 180 MW • Gas is obtained from the Sengkang gas field • Electricity is sold under a take or pay PPA with PLN. • The PPA is currently until 2022. We have had initial

  13. Slide 13: Indonesia – Sengkang Power

    Indonesia – Sengkang Power Sengkang Power Station Block 1 and Block 2 For personal use only Block 2 Aerial view of Sengkang Power Plant Block 1 ENERGY WORLD CORPORATION

  14. Slide 14: Sengkang Production Sharing Contract (PSC)

    For personal use only Sengkang Production Sharing Contract (PSC) Indonesia ENERGY WORLD CORPORATION

  15. Slide 15: Indonesia – Sengkang Gas

    Indonesia – Sengkang Gas The Sengkang PSC Block is located in the province of South Sulawesi. The PSC is For personal use only operated by Energy Equity Epic Sengkang (“EEES”) which is 100% owned by EWC and covers 2,925 square kilometres. Gas from the PSC is supplied to the 315MW Sengkang Power Stat

  16. Slide 16: Indonesia – Sengkang Gas

    Indonesia – Sengkang Gas Gas Processing Plant in Sengkang Indonesia with expansion For personal use only ENERGY WORLD CORPORATION

  17. Slide 17: Indonesia – Sengkang Gas

    Indonesia – Sengkang Gas Gas Processing Plant in Sengkang Indonesia with expansion For personal use only ENERGY WORLD CORPORATION

  18. Slide 18: Indonesia – Sengkang Gas Wasambo Pipe Line Routing Plan

    Indonesia – Sengkang Gas 410 mm Φ x 14 km Wasambo Pipe Line Routing Plan For personal use only ENERGY WORLD CORPORATION

  19. Slide 19: Indonesia – Sengkang Gas Wasambo Natural Gas Pipe Line

    Indonesia – Sengkang Gas 410 mm Φ x 14 km Wasambo Natural Gas Pipe Line For personal use only ENERGY WORLD CORPORATION

  20. Slide 20: Indonesia – Sengkang Gas

    Indonesia – Sengkang Gas Wasambo Natural Gas Pipe Line Construction in Progress For personal use only ENERGY WORLD CORPORATION

  21. Slide 21: Sengkang LNG Plant, Indonesia

    For personal use only Sengkang LNG Plant Indonesia ENERGY WORLD CORPORATION

  22. Slide 22: Indonesia – Sengkang LNG

    For personal use only Indonesia – Sengkang LNG The Sengkang LNG Plant has a design capacity of 2 mtpa, consisting of 4 modular 500,000 tpa trains, an import/export terminal and jetty facilities Construction is 80% complete Gas will be purchased from our Sengkang gas field, where an allocation agreem

  23. Slide 23: Indonesia – Sengkang LNG

    For personal use only Indonesia – Sengkang LNG ENERGY WORLD CORPORATION

  24. Slide 24: Indonesia – Sengkang LNG

    Indonesia – Sengkang LNG View of LNG Plant Site For personal use only ENERGY WORLD CORPORATION

  25. Slide 25: Indonesia – Sengkang LNG

    Indonesia – Sengkang LNG View of LNG Plant Site For personal use only ENERGY WORLD CORPORATION

  26. Slide 26: Indonesia – Sengkang LNG

    Indonesia – Sengkang LNG View of LNG Plant Site For personal use only ENERGY WORLD CORPORATION

  27. Slide 27: Indonesia – Sengkang LNG

    Indonesia – Sengkang LNG Progress of the LNG Tank For personal use only ENERGY WORLD CORPORATION

  28. Slide 28: Indonesia – Sengkang LNG

    Indonesia – Sengkang LNG Welding Works for Tank Interior Lining at Dome Roof in Progress For personal use only ENERGY WORLD CORPORATION

  29. Slide 29: Indonesia – Sengkang LNG

    Indonesia – Sengkang LNG LNG Tank and Cold Box For personal use only ENERGY WORLD CORPORATION

  30. Slide 30: Indonesia – Sengkang LNG

    Indonesia – Sengkang LNG Main Processing Plant Area For personal use only ENERGY WORLD CORPORATION

  31. Slide 31: Indonesia – Sengkang LNG

    Indonesia – Sengkang LNG Main Processing Plant Area For personal use only ENERGY WORLD CORPORATION

  32. Slide 32: Indonesia – Sengkang LNG

    Indonesia – Sengkang LNG Fabrication & Installation of ICP For personal use only ENERGY WORLD CORPORATION

  33. Slide 33: Indonesia – Sengkang LNG

    Indonesia – Sengkang LNG Fabrication & Installation of ICP For personal use only ENERGY WORLD CORPORATION

  34. Slide 34: Indonesia – Sengkang LNG

    Indonesia – Sengkang LNG Fabrication & Installation of ICP For personal use only ENERGY WORLD CORPORATION

  35. Slide 35: Indonesia – Sengkang LNG

    Indonesia – Sengkang LNG Main Processing Plant Area For personal use only ENERGY WORLD CORPORATION

  36. Slide 36: Indonesia – Sengkang LNG

    Indonesia – Sengkang LNG Main Processing Plant Area For personal use only ENERGY WORLD CORPORATION

  37. Slide 37: Indonesia – Sengkang LNG

    Indonesia – Sengkang LNG Main Processing Plant Area For personal use only ENERGY WORLD CORPORATION

  38. Slide 38: Indonesia – Sengkang LNG

    Indonesia – Sengkang LNG SIEMENS Compressor Trains Installation completed For personal use only ENERGY WORLD CORPORATION

  39. Slide 39: Indonesia – Sengkang LNG

    Indonesia – Sengkang LNG SIEMENS Compressor Trains Installation For personal use only ENERGY WORLD CORPORATION

  40. Slide 40: Indonesia – Sengkang LNG

    Indonesia – Sengkang LNG Main Processing Plant Area For personal use only ENERGY WORLD CORPORATION

  41. Slide 41: Indonesia – Sengkang LNG

    Indonesia – Sengkang LNG Main Processing Plant Area For personal use only ENERGY WORLD CORPORATION

  42. Slide 42: Indonesia – Sengkang LNG

    Indonesia – Sengkang LNG Main Processing Plant Area For personal use only ENERGY WORLD CORPORATION

  43. Slide 43: Indonesia – Sengkang LNG

    Indonesia – Sengkang LNG Main Processing Plant Area For personal use only ENERGY WORLD CORPORATION

  44. Slide 44: Indonesia – Sengkang LNG Central Control Building

    Indonesia – Sengkang LNG Central Control Building For personal use only ENERGY WORLD CORPORATION

  45. Slide 45: Indonesia – Sengkang LNG Switchyard Control Building

    Indonesia – Sengkang LNG Switchyard Control Building For personal use only ENERGY WORLD CORPORATION

  46. Slide 46: Indonesia – Sengkang LNG Progress of Marine Jetty

    Indonesia – Sengkang LNG Progress of Marine Jetty For personal use only ENERGY WORLD CORPORATION

  47. Slide 47: Indonesia – Sengkang LNG Progress of Marine Jetty

    Indonesia – Sengkang LNG Progress of Marine Jetty For personal use only ENERGY WORLD CORPORATION

  48. Slide 48: Indonesia – Sengkang LNG Gangway Tower

    Indonesia – Sengkang LNG Erection of 12.5m Gangway Tower at Marine Jetty For personal use only ENERGY WORLD CORPORATION

  49. Slide 49: Indonesia – Sengkang LNG Marine Jetty Walkway

    Indonesia – Sengkang LNG Erection of Marine Jetty Walkway For personal use only ENERGY WORLD CORPORATION

  50. Slide 50: Indonesia – Sengkang LNG Cutter Suction Dredger

    Indonesia – Sengkang LNG Cutter Suction Dredger For personal use only ENERGY WORLD CORPORATION

  51. Slide 51: Indonesia – Sengkang LNG Cutter Suction Dredger

    Indonesia – Sengkang LNG Cutter Suction Dredger For personal use only ENERGY WORLD CORPORATION

  52. Slide 52: Our Australian Projects

    For personal use only Our Australian Projects Existing Facilities ENERGY WORLD CORPORATION

  53. Slide 53: Australian Projects

    For personal use only Australian Projects Alice Springs Eromanga Gilmore Australia ENERGY WORLD CORPORATION

  54. Slide 54: Australia – Eromanga Gas Field

    Australia – Eromanga Gas Field View of Eromanga Gas Field For personal use only ENERGY WORLD CORPORATION

  55. Slide 55: Australia – Eromanga Gas Field

    Australia – Eromanga Gas Field View of Eromanga Gas Field For personal use only ENERGY WORLD CORPORATION

  56. Slide 56: Australia – Eromanga Gas Field

    Australia – Eromanga Gas Field View of Eromanga Gas Field For personal use only ENERGY WORLD CORPORATION

  57. Slide 57: Australia – Gilmore Gas Field

    Australia – Gilmore Gas Field View of Gilmore Gas Field For personal use only ENERGY WORLD CORPORATION

  58. Slide 58: Australia – Alice Springs Power Station

    Australia – Alice Springs Power Station Alice Springs 8.68MW Power Station For personal use only ENERGY WORLD CORPORATION

  59. Slide 59: Australia – Alice Springs LNG

    Australia – Alice Springs LNG  EWC has over 18 years of Safe Operation of LNG production in Australia For personal use only ENERGY WORLD CORPORATION

  60. Slide 60: Australia – Alice Springs LNG

    Australia – Alice Springs LNG Alice Springs 10,000 TPA LNG Plant For personal use only ENERGY WORLD CORPORATION

  61. Slide 61: Australia – Gilmore LNG Project

    Australia – Gilmore LNG Project Erection of Process Equipment For personal use only ENERGY WORLD CORPORATION

  62. Slide 62: Australia – Gilmore LNG Project

    Australia – Gilmore LNG Project Erection of Process Equipment For personal use only ENERGY WORLD CORPORATION

  63. Slide 63: Australia – Gilmore LNG Project

    Australia – Gilmore LNG Project Erection of Process Equipment For personal use only ENERGY WORLD CORPORATION

  64. Slide 64: Australia – PEL Southern Cooper Gas

    Australia – PEL 96 Southern Cooper Gas EWC Interest 33.3% For personal use only Australia Operating Party Strike Energy Status Strike has recently completed a full review of the project, confirming its materiality and PEL quality, and is now progressing 96 towards drilling 1 or 2 wells in the “Jaws”

  65. Slide 65: Australia – PEL Southern Cooper Gas

    Australia – PEL 96 Southern Cooper Gas Ongoing Production Testing at PEL96 For personal use only ENERGY WORLD CORPORATION

  66. Slide 66: Philippines Projects

    For personal use only Philippines Projects The Philippines – Pagbilao LNG Hub Terminal and Power Plant ENERGY WORLD CORPORATION

  67. Slide 67: LNG Hub Terminal

    For personal use only Philippines – Pagbilao LNG Hub Terminal ENERGY WORLD CORPORATION

  68. Slide 68: LNG Hub Terminal

    For personal use only Philippines – Pagbilao LNG Hub Terminal Pagbilao Power Plant and LNG PHILI PPINES Terminal:  Terminal will act as a hub for onward distribution of LNG throughout the Philippines  We are also developing a 650MW Manila CCGT power plant at this site Pagbilao LNG Hub Terminal and

  69. Slide 69: Our LNG Projects

    For personal use only Our LNG Projects The Philippines – Pagbilao LNG Hub Terminal and Power Plant LNG Hub Terminal ENERGY WORLD CORPORATION

  70. Slide 70: LNG Hub Terminal

    For personal use only Philippines – Pagbilao LNG Hub Terminal LNG TANK PAGBILAO LNG HUB TERMINAL AND POWER PLANT DELIVERING CLEAN AND GREEN ENERGY ENERGY WORLD CORPORATION

  71. Slide 71: LNG Hub Terminal

    Philippines – Pagbilao LNG Hub Terminal • The Hub is a strategically important asset for Philippines nascent gas industry For personal use only • 130,000 m3 LNG Hub Terminal is 90% completed • Deep water jetty is capable of handling all sizes of LNG vessels • Facility is capable of handling 3 mtpa o

  72. Slide 72: LNG Hub Terminal View of The Tank

    Philippines – Pagbilao LNG Hub Terminal View of The Tank For personal use only ENERGY WORLD CORPORATION

  73. Slide 73: LNG Hub Terminal View of The Tank

    Philippines – Pagbilao LNG Hub Terminal View of The Tank No. 1 For personal use only ENERGY WORLD CORPORATION

  74. Slide 74: LNG Hub Terminal Construction

    Philippines – Pagbilao LNG Hub Terminal Construction of Tier 1 & 2 For personal use only ENERGY WORLD CORPORATION

  75. Slide 75: LNG Hub Terminal Construction of Roof Dome Pump Platform

    Philippines – Pagbilao LNG Hub Terminal Construction of Roof Dome Pump Platform For personal use only ENERGY WORLD CORPORATION

  76. Slide 76: LNG Hub Terminal Site Foundation of LNG Tank

    Philippines – Pagbilao LNG Hub Terminal Site Foundation of LNG Tank No. 2 For personal use only LNG Tank No.1 LNG Tank No.2 ENERGY WORLD CORPORATION

  77. Slide 77: LNG Hub Terminal Site Foundation of LNG Tank

    Philippines – Pagbilao LNG Hub Terminal Site Foundation of LNG Tank No. 2 For personal use only ENERGY WORLD CORPORATION

  78. Slide 78: LNG Hub Terminal Suspended Ceiling installation in LNG Tank 1

    Philippines – Pagbilao LNG Hub Terminal Suspended Ceiling installation in LNG Tank 1 For personal use only ENERGY WORLD CORPORATION

  79. Slide 79: LNG Hub Terminal LNG Jetty

    For personal use only Philippines – Pagbilao LNG Hub Terminal LNG Jetty ENERGY WORLD CORPORATION

  80. Slide 80: LNG Hub Terminal Layout Plan of Jetty Area

    Philippines – Pagbilao LNG Hub Terminal Layout Plan of Jetty Area For personal use only 330 m ENERGY WORLD CORPORATION

  81. Slide 81: LNG Hub Terminal View of LNG Jetty Area

    Philippines – Pagbilao LNG Hub Terminal View of LNG Jetty Area For personal use only ENERGY WORLD CORPORATION

  82. Slide 82: LNG Hub Terminal Progress of the Jetty

    Philippines – Pagbilao LNG Hub Terminal Progress of the Jetty For personal use only ENERGY WORLD CORPORATION

  83. Slide 83: LNG Hub Terminal View of Jetty Area

    Philippines – Pagbilao LNG Hub Terminal View of Jetty Area For personal use only ENERGY WORLD CORPORATION

  84. Slide 84: LNG Hub Terminal Gangway Tower installation completed

    Philippines – Pagbilao LNG Hub Terminal Gangway Tower & Fire Monitoring Towers installation completed For personal use only ENERGY WORLD CORPORATION

  85. Slide 85: LNG Hub Terminal Installation of the Jetty Walkway

    Philippines – Pagbilao LNG Hub Terminal Installation of the Jetty Walkway For personal use only ENERGY WORLD CORPORATION

  86. Slide 86: LNG Hub Terminal Installation of the LNG Transmission Piping

    Philippines – Pagbilao LNG Hub Terminal Installation of the LNG Transmission Piping For personal use only ENERGY WORLD CORPORATION

  87. Slide 87: LNG Hub Terminal Welding and Insulation of LNG Pipeline

    Philippines – Pagbilao LNG Hub Terminal Welding and Insulation of LNG Pipeline For personal use only ENERGY WORLD CORPORATION

  88. Slide 88: LNG Hub Terminal Installation of the LNG Transmission Piping

    Philippines – Pagbilao LNG Hub Terminal Installation of the LNG Transmission Piping For personal use only ENERGY WORLD CORPORATION

  89. Slide 89: LNG Hub Terminal Quick Release Hooks & Mooring Dolphin

    Philippines – Pagbilao LNG Hub Terminal Quick Release Hooks & Mooring Dolphin For personal use only ENERGY WORLD CORPORATION

  90. Slide 90: LNG Hub Terminal Testing and commissioning of big dredger

    Philippines – Pagbilao LNG Hub Terminal Testing and commissioning of big dredger For personal use only ENERGY WORLD CORPORATION

  91. Slide 91: Power Regasification Facility

    For personal use only Philippines – Pagbilao Power Regasification Facility For 650 MW Power Station ENERGY WORLD CORPORATION

  92. Slide 92: Power View of Regasification Facility & Pipe way

    Philippines – Pagbilao Power View of Regasification Facility & Pipe way For personal use only Pipe Way Regasification ENERGY WORLD CORPORATION

  93. Slide 93: Power Installation of Regasification Facility

    Philippines – Pagbilao Power Installation of Regasification Facility For personal use only ENERGY WORLD CORPORATION

  94. Slide 94: Power Combined Cycle Gas Fired Power Station

    For personal use only Philippines – Pagbilao Power 650 MW Combined Cycle Gas Fired Power Station ENERGY WORLD CORPORATION

  95. Slide 95: Power Combined Cycle Gas Turbine Power Plant

    Philippines – Pagbilao Power • 650 MW Combined Cycle Gas Turbine Power For personal use only Plant construction is significantly completed • Project is being developed in stages: • Block 1 - 200 MW gas turbine (85% complete) • Block 2 - 200 MW gas turbine (80% complete) • Block 3 - 250 MW steam turb

  96. Slide 96: Power Main Plant Area

    Philippines – Pagbilao Power Main Plant Area For personal use only Existing Transmission Tower Power Block 1 Power Block 2 Steam Turbine Foundations Switchyard Area ENERGY WORLD CORPORATION

  97. Slide 97: Power View of Power Station

    Philippines – Pagbilao Power View of Power Station For personal use only ENERGY WORLD CORPORATION

  98. Slide 98: Power View of Power Station

    Philippines – Pagbilao Power View of Power Station For personal use only ENERGY WORLD CORPORATION

  99. Slide 99: Power Construction of Bypass Stack at Power Station

    Philippines – Pagbilao Power Construction of Bypass Stack at Power Station For personal use only ENERGY WORLD CORPORATION

  100. Slide 100: Power Construction of Bypass Stack at Power Station

    Philippines – Pagbilao Power Construction of Bypass Stack at Power Station For personal use only ENERGY WORLD CORPORATION

  101. Slide 101: Power Construction of Power Station – Switchyard Area

    Philippines – Pagbilao Power Construction of Power Station – Switchyard Area For personal use only ENERGY WORLD CORPORATION

  102. Slide 102: Power Construction – Steam Turbine Foundations

    Philippines – Pagbilao Power Construction of Power Station – Steam Turbine Foundations For personal use only ENERGY WORLD CORPORATION

  103. Slide 103: Power HP Rotor & LP Rotor Photos

    Philippines – Pagbilao Power HI Rotor & LP Rotor Photos For personal use only ENERGY WORLD CORPORATION

  104. Slide 104: Philippines – Facilities

    For personal use only Philippines – Facilities ENERGY WORLD CORPORATION

  105. Slide 105: Power Construction of Control Room / Admin. Building

    Philippines – Pagbilao Power Construction of Control Room / Admin. Building For personal use only ENERGY WORLD CORPORATION

  106. Slide 106: Power Warehouse in Operation

    Philippines – Pagbilao Power Warehouse in Operation For personal use only ENERGY WORLD CORPORATION

  107. Slide 107: Power View of Resettlement House

    Philippines – Pagbilao Power View of Resettlement House For personal use only ENERGY WORLD CORPORATION

  108. Slide 108: Power View of Resettlement House

    Philippines – Pagbilao Power View of Resettlement House For personal use only ENERGY WORLD CORPORATION

  109. Slide 109: Power Fitting Out of Resettlement House

    Philippines – Pagbilao Power Fitting Out of Resettlement House For personal use only ENERGY WORLD CORPORATION

  110. Slide 110: Power Fitting Out of Resettlement House

    Philippines – Pagbilao Power Fitting Out of Resettlement House For personal use only ENERGY WORLD CORPORATION

  111. Slide 111: Power Coffee Shop

    Philippines – Pagbilao Power Coffee Shop For personal use only ENERGY WORLD CORPORATION

  112. Slide 112: Power and LNG Support From Stakeholders

    For personal use only Philippines – Pagbilao Power and LNG Support From Stakeholders ENERGY WORLD CORPORATION

  113. Slide 113: Site Visit by The Department of Energy, Philippines

    Philippines – Pagbilao LNG and Power Site Visit by The Department of Energy, Philippines For personal use only ENERGY WORLD CORPORATION

  114. Slide 114: Site Visit by Secretary of the Department of Energy

    Philippines – Pagbilao LNG and Power Site Visit by Mr. Alfonso Cusi, Secretary of the Department of Energy, Philippines For personal use only ENERGY WORLD CORPORATION

  115. Slide 115: Site Visit by Secretary of the Department of Energy

    Philippines – Pagbilao LNG and Power Site Visit by Mr. Alfonso Cusi, Secretary of the Department of Energy, Philippines For personal use only ENERGY WORLD CORPORATION

  116. Slide 116: Site Visit by the House of Representatives

    Philippines – Pagbilao LNG and Power Site Visit by the House of Representatives, Congressman Lord Allan Jay Q. Velasco Chairman House Committee on Energy For personal use only ENERGY WORLD CORPORATION

  117. Slide 117: House of Representatives’ Site Visit

    Philippines – Pagbilao LNG and Power House of Representatives’ Site Visit For personal use only ENERGY WORLD CORPORATION

  118. Slide 118: Site Visit by Clermont Group

    Philippines – Pagbilao LNG and Power Site Visit by Clermont Group For personal use only ENERGY WORLD CORPORATION

  119. Slide 119: Business Updates

    For personal use only Business Updates 118 ENERGY WORLD CORPORATION

  120. Slide 120: Philippines – Land Agreement

    For personal use only Philippines – Land Agreement Land Agreement Following the NCGP’s announcement of the exact location of the Pagbilao Sub Station, we were able to identify the exact termination point for our right of way. We entered into a binding agreement with a Land Agent, who together with t

  121. Slide 121: Philippines – Connection Agreement

    For personal use only Philippines – Connection Agreement Connection Agreement: We have previously signed a connection agreement with NGCP that provides us access to the main grid as follows: - A tie in connection to the existing Taybas – Naga transmission line for up to 200 MW, which is immediately

  122. Slide 122: Land Agreement Ceremony

    Philippines – Pagbilao LNG and Power Land Agreement Ceremony For personal use only ENERGY WORLD CORPORATION

  123. Slide 123: Pagbilao Power Plant – Development Plan

    Pagbilao Power Plant – Development Plan OCT 2017 For personal use only 2011 DEC-2011 • NGCP Confirms the location of the New Pagbilao Sub Station. EWC receives DOE Endorsement for LNG Power Project at Pagbilao NGCP Construction of New Pagbilao HV Substation JUN-2013 EWC receives DOE Approval to appl

  124. Slide 124: LNG as a Clean Source of Energy

    LNG as a Clean Source of Energy Philippines President Executive Order No. 66 For personal use only LIQUEFIED NATURAL GAS WHEREAS, natural gas has been recognized as an environment-friendly, indigenous and low-cost source of energy among the indigenous energy resources; ENERGY WORLD CORPORATION

  125. Slide 125: Philippines President Executive Order

    Philippines President Executive Order No. 66 Designating the Department of Energy as the lead agency in developing For personal use only the Philippines Natural Gas Industry ENERGY WORLD CORPORATION

  126. Slide 126: Philippines Landscape – Robust Demand for Power

    Philippines Landscape – Robust Demand for Power The Department of Energy forecasts that the Philippines will need 43,765 MW of For personal use only additional power capacity by 2040, up from the existing capacity of 13,877 MW, representing a compound growth rate of 6% pa. The Luzon grid, which acco

  127. Slide 127: Luzon – Power Generation

    For personal use only Luzon – Power Generation ENERGY WORLD CORPORATION

  128. Slide 128: Philippines – Power Generation

    Philippines – Power Generation Demand for Clean and Green Energy in the Philippines For personal use only ENERGY WORLD CORPORATION

  129. Slide 129: Philippines – Power Generation

    Philippines – Power Generation Demand for Clean and Green Energy in the Philippines For personal use only Prepared by SHELL ENERGY WORLD CORPORATION

  130. Slide 130: LNG Distribution Options – Creating a Market

    LNG Distribution Options – Creating a Market • The LNG Terminal at Pagbilao will For personal use only act as a Hub Terminal. LNG can Large LNG vessel for be imported to the Hub Terminal, deliveries of LNG to and then distributed in smaller the Hub terminal cargos to users around the Philippines. Mi

  131. Slide 131: LNG Distribution Options - Pipelines

    LNG Distribution Options - Pipelines For personal use only ENERGY WORLD CORPORATION

  132. Slide 132: LNG Distribution Options - Shipping

    LNG Distribution Options - Shipping EWC is Working with GTT to Develop Suitable Shipping Solutions For personal use only ENERGY WORLD CORPORATION

  133. Slide 133: LNG Distribution Options - Shipping

    LNG Distribution Options - Shipping EWC is Working with GTT to Develop Suitable Shipping Solutions For personal use only 16,500m³ Shallow LNG Carrier Main Dimensions Cargo Tanks Length overall: 133 m 2 Membrane type GTT Mark III Flex tanks Length between perpendiculars: 126 m Cargo Capacity (100%V):

  134. Slide 134: LNG Distribution Options - Shipping

    LNG Distribution Options - Shipping EWC is Working with GTT to Develop Suitable Shipping Solutions For personal use only ENERGY WORLD CORPORATION

  135. Slide 135: LNG Distribution Options - Shipping

    LNG Distribution Options - Shipping LNG Ship - Ocean Quest, owned by EWI, at Jetty For personal use only ENERGY WORLD CORPORATION

  136. Slide 136: Indonesia – Current Status

    For personal use only Indonesia – Current Status We have been progressing a solution for our assets in Indonesia with the appropriate regulatory authorities. • We have been invited by DG Migas and SKK Migas to submit an extension application for the Sengkang PSC, to extend the field beyond its curre

  137. Slide 137: Indonesia – Current Status

    For personal use only Indonesia – Current Status ENERGY WORLD CORPORATION

  138. Slide 138: Indonesia – Growth Opportunities

    Indonesia – Growth Opportunities We are working to secure an extension to the PSC, we have many For personal use only opportunities to expand in Sengkang and other parts of Indonesia 2017 2022 PSC 20 YEARS EXTENSION 2042 POWER STATION EXTENSION OF EXISTING 90 BSCF POWER STATION PPA EXISTING 360 BSCF

  139. Slide 139: Australian Projects

    For personal use only Australian Projects EWC owns significant interests in onshore gas fields with existing gas discoveries EWC has the only non PL115 producing wells, independent PL116 PL 1030- of Gladstone LNG, which are 1033 connected to infrastructure. PL 184 ATP 932 (Eromanga ) EWC seeks to ma

  140. Slide 140: Australian Projects – Resource and Infrastructure

    Australian Projects – Resource and Infrastructure Proven Resource with Existing For personal use only Recorded Effective Resource Future Potential Processing Facilities Interest (BCF) (BCF) Gas processing facilities are in place I II III and have the potential to provide 12 PL 65 Gilmore 100% 20 400

  141. Slide 141: Australian Projects – Short Term Rewards with Huge Upside Potential

    Australian Projects – Short Term Rewards with Huge Upside Potential Revenue Potential For personal use only Unconventional Drilling - upside Unconventional drilling Conventional Drilling Fracture Stimulation and new zones within existing wells – 43 BCF Restart existing production wells – 18 BCF Time

  142. Slide 142: Australian Projects – A full Cycle Opportunity

    Australian Projects – A full Cycle Opportunity EWC will have the platform to sell gas to almost anyone in Australia through For personal use only existing pipeline connections and a partially developed small scale LNG facility • Can take advantage of market opportunities through cycles ENERGY WORLD

  143. Slide 143: Project Funding Plan Update

    Project Funding Plan Update Phase I – Financing USD’m For personal use only 1. DBP/Landbank for Philippine Power Plant 150 2. LNG Hub Corporate Note Phase II 42 3. Bank Mandiri Sengkang LNG 120 312 Summary of Financing Plan USD’m Phase II – Project Expansion USD’m 1. PHASE II Philippines Power (ST)

  144. Slide 144: Value Proposition

    For personal use only Value Proposition EWC’s 5 projects in 3 core countries of operation are at various stages of completion, with substantive works having been completed in the Philippines and Indonesia over the last few years, and with existing facilities currently on care and maintenance in Aust

  145. Slide 145: Value Proposition

    For personal use only Value Proposition US$4bn+ Philippines On Power Plant Completion Value Uplift Philippines Hub Indonesian Power US$1.5bn Construction Value Uplift Indonesian LNG US$140m Australian Gas EWI takes Control ENERGY WORLD CORPORATION

  146. Slide 146: Many Thanks from Energy World

    For personal use only Many Thanks from Energy World Delivering Clean and Green Energy to Asia Whatever Quantity You Require EWG20171128 ENERGY WORLD CORPORATION

Energy World — Shareholder Meeting (November 2017) on 6ix