Aic Mines Limited · ASX:A1M

Aic Mines — Investor Presentation (February 2021)

14 slides from Aic Mines's investor presentation, Feb 24, 2021

  1. Slide 1: Investor Presentation February 2021

    For personal use only Investor Presentation February 2021

  2. Slide 2: Important Information

    Important Information For personal use only This presentation has been prepared by AIC Mines Limited (“the Company” or “AIC Mines”) to provide summary information about AIC Mines and its activities at the date of this presentation. The information contained in this presentation does not purport to b

  3. Slide 3: Company Overview

    Company Overview For personal use only An experienced management team focused on building a new Australian mid-tier gold and copper miner through exploration, development and acquisition ASX Code A1M Board of Directors Share Price 1 30c Josef El-Raghy Chairman Shares on Issue 68.7M Aaron Colleran Ma

  4. Slide 4: Current Projects: Exploring for Gold and Copper in WA

    Current Projects Exploring for Gold and Copper in WA For personal use only Lamil Joint Venture • 1,280km2 tenement package located 30km west of the world-class Telfer Gold-Copper Mine • Displays all the ingredients required to host a Telfer-style deposit • Maiden drilling program completed December

  5. Slide 5: Lamil Project, Paterson Province WA

    Lamil Project Paterson Province WA For personal use only • The Paterson Province is one of the most highly endowed yet under-explored regions in Australia • Recent discoveries at Winu and Havieron are testament to the potential of the region • The main Lamil Dome target exhibits the key structural f

  6. Slide 6: Lamil Project: Prominent Regional Hinge Zone

    Lamil Project Prominent Regional Hinge Zone For personal use only • The project area occupies a prominent regional ‘hinge zone’ which is clearly defined by a significant flexure in major belt-parallel structures • AIC geophysical interpretation shows a regional scale NE-SW trending structure is trac

  7. Slide 7: Lamil Project: Phase 1 Drilling Program Completed December 2020

    Lamil Project Phase 1 Drilling Program Completed December 2020 For personal use only • A total of 68 AC/RC holes were completed to an average depth of 126m for a total 8,591m • Very broad-spaced pattern – 1600m x 400m • A total of 7 diamond holes were completed to an average depth of 406m for a tota

  8. Slide 8: Lamil Project: What We Learnt from Phase 1 Drilling

    Lamil Project Phase 1 Drilling Program Completed December 2020 For personal use only • What we learnt: • Confirmed the presence of prospective basement lithologies including metasedimentary rocks (quartz sandstones, siltstones, quartzite) and mafic intrusives (dolerite) • Key pathfinder elements are

  9. Slide 9: Marymia Project: Prospective for Gold and Copper

    Marymia Project Prospective for Gold and Copper For personal use only Significant Copper Prospects • Surface geochem has identified a significant copper anomaly at the Curara Well JV1. The target occurs at the base of the Naracoota Formation and in close proximity to the Jenkins Fault – a similar se

  10. Slide 10: Marymia Project: 3,600km2 Tenement Package

    Marymia Project 3,600km2 tenement package For personal use only • Current evaluation is designed to map structural complexity under cover and target deep controlling structures • Numerous targets with elements consistent with the known major deposits in the region (i.e. Plutonic, Marymia and DeGruss

  11. Slide 11: Marymia Project: Forward Work Program

    Marymia Project Forward Work Program For personal use only • Drilling at the Curara Well JV Cu target1 due to commence mid- March 2021 • Downhole EM testing at Doolgunna Cu prospect • EIS co-funding received to test for extensions of the Plutonic- Marymia greenstone belt beneath over-thrust granite

  12. Slide 12: Growth Strategy: A Disciplined Acquisition Strategy

    Growth Strategy A Disciplined Acquisition Strategy For personal use only Build a portfolio of mines through exploration, development and acquisition • Our strategy is to target late-stage Australian gold and copper projects where we can add value through exploration and development • Numerous opport

  13. Slide 13: Investment Thesis

    Investment Thesis For personal use only • Highly credentialed team • Well capitalised • Committed to high impact exploration using highest quality geoscientific data sets • Inaugural drilling program at Lamil Project has confirmed the key elements required to host intrusive related gold-copper miner

  14. Slide 14: Contact details

    Commencement of RC drilling at the Lamil Project – September 2020 For personal use only www.aicmines.com.au ABN: 11 060 156 452 P: +61 (8) 6269 0110 E: info@aicmines.com.au A: A8, 435 Roberts Rd, Subiaco, WA, 6008 14

AIC Mines — Investor Presentation (February 2021) on 6ix