Mandalay Resources Corp

Mandalay Resources — Corporate Update (January 2011)

32 slides from Mandalay Resources's corporate update, January 2011

  1. Slide 1: Cerro Bayo Operations Analyst Tour

    TSX: MND, MND.WT Cerro Bayo Operations Analyst Tour January 2011

  2. Slide 2: Forward-looking statements

    Forward-looking statements This presentation contains "forward-looking statements" within the meaning of applicable securities laws, including statements relating to life of mine production plans and exploration plans, the Cerro Bayo restart plan and the Furioso mine closure costs. Readers are cauti

  3. Slide 3: Quality control and assurance

    Quality control and assurance Quality control and assurance programs are implemented in line with the standards of National Instrument 43-101. The exploration program on the Cerro Bayo project is supervised by Ronald Luethe (Member, American Institute of Professional Geologists), General Manager of

  4. Slide 4: Safety

    Safety • Excellent safety record following restart – 1 minor contractor LTI • Changed philosophy for safety reporting – Including contractors • Construction of escape ways and installation of refuge chambers • Mines rescue team formation – advanced training course • SERNAGEOMIN Permission for Delia

  5. Slide 5: Environmental

    Environmental • Furioso mine closure o Closure to continue through 2012 (2011 bulkhead wall, 2012 capping of open pit) o Water monitoring to continue through 2017 o Estimated cost US$4M • Proactive mine closure from 2012 • Application for Delia SE environmental permission Q4 2011 5

  6. Slide 6: Human resources

    Human resources • Cerro Bayo workforce of 265 (excluding contractors). Contractor workforce of 85 • Cerro Bayo workforce expected to increase to over 400 employees as Delia development starts. Contractor workforce to remain stable. • Focus on promoting local workforce into positions of authority Act

  7. Slide 7: Restart progress in 2010

    Restart progress in 2010 • Summary of Actual Unit Budget Actual % Budget Capital Development m 500 547 109% Operational Development m 603 856 142% Production t 4,858 12,048 248% Grade Ag g/t 348 282 81% Grade Au g/t 1.10 0.87 79% Ounces Ag oz 54,351 109,323 201% Ounces Ag oz 173 336 194% Total cash

  8. Slide 8: Current life of mine operations plan

    Current life of mine operations plan • 4 new single ramp access mines utilizing longhole stoping methods (Benching retreat) in Coigues Este area • Reopen one mine in Cerro Bayo area (Marcela) • Mill feed produced: o Fabiola – 200 – 250 kt o Dagny – 250 – 300 kt o Delia NW – 400 – 450 kt o Delia SE –

  9. Slide 9: Four single-ramp, long-hole stoping mines

    Four single-ramp, long-hole stoping mines

  10. Slide 10: Production starts with Dagny and Fabiola

    Production starts with Dagny and Fabiola Dagny (Mining on 3 levels) Yasna Yasna (potential addition to mine plan) Fabiola Mining on 5 levels 10

  11. Slide 11: Delia Veins - to be developed from surface

    Delia Veins - to be developed from surface Delia NW Timing • SERNAGEOMIN permission expected Mar-2011 • Development planned beginning April-2011 • First production expected Q4-2011 • Large opportunity to convert inferred resource to probable reserves and extend ore shoots Delia SE 11

  12. Slide 12: Plant

    Plant Tolva Flotacion Columnar 10 m. x 1.10 m COMPANIA MINERA CERRO BAYO LTDA PLANTA PROCESAMIENTO MINERALES DE ORO CAPACIDAD DE PLANTA 1.500 TPD —— | oe - § a Molino SAG 18’ x 9.25’ Agua 2 Celdas 150 Ft3 Cleaner3 4 celdas 150 Ft3 Molino Bola: 11.5’ x 18’ Ciclones D-15 Clasificador 42” = = elf Home

  13. Slide 13: Tailings

    Tailings • Permitted dam elevation 320 masl • Actual dam elevation 316 masl • Actual tails elevation 313.5 masl • Permitted and design capacity 2,300 kt • Required capacity for LOM 1,141 kt (including inferred) • Permitted capacity vs LOM 2X • Number of lifts required 2, each of 2 m • Estimated cost

  14. Slide 14: LOM plan and potential upgrades

    LOM plan and potential upgrades Mine Production LOM 120,000 Possible Dagny, Fabiola Possible Delia NW and and Yasna extensions Delia SE extensions 100,000 80,000 Metric Tonnes (t) 60,000 40,000 Blue‐sky exploration 20,000 Delia SE Delia NW Marcela Fabiola Dagny 14

  15. Slide 15: Current plan

    Current plan Unit 2011 2012 2013 2014 Gold Sold oz 12,051 21,269 23,398 24,577 Silver Sold oz 1,919,324 3,486,654 2,855,481 2,391,859 Operating Costs US$’000 29,939 34,420 33,796 28,319 Concentrate Shipping US$’000 3,757 6,678 6,036 5,375 and Treatment Expensed Exploration US$’000 1,864 2,000 1,000

  16. Slide 16: 2011 potential production upside

    2011 potential production upside • Processing of low-grade stockpiles o 2 major waste dumps (Cisne and Juncos) and multiple smaller dumps – could contribute 5 million low-grade tonnes o Trial run carried out in December 2010 – 2,517 tonnes processed @ 28.8g/t Au and 0.64g/t Au o Further test runs sc

  17. Slide 17: Large budget capital items for 2011

    Large budget capital items for 2011 • Development of Delia NW mine – US$2,327,000 • Underground major equipment – US$1,500,000 o 1 scoop o 1 underground dump truck o 1 Raptor longhole drill • Processing plant filter – US$650,000 • Hydro-geological study for Delia Mines – US$500,000 17

  18. Slide 18: Cerro Bayo 2011 Exploration Analyst Tour

    TSX: MND, MND.WT Cerro Bayo 2011 Exploration Analyst Tour Jan-2011 18

  19. Slide 19: 2011 exploration

    2011 exploration CURRENT NI- 43-101 RESOURCES(1) 2011 GOALS • Double Measured and Indicated Resources • Double Inferred Resources • Drill confirm at least one major new vein for 2012 infill • Generate high quality targets for 2012 drill testing (1) Source: Mandalay Resources Corporation NI 43-101 Te

  20. Slide 20: Cerro Bayo District - key features & targets

    Cerro Bayo District - key features & targets NI43-101 Reserve-Resource veins ¾ 2011 Infill Drilling and Step-Out Drilling 2011 Scheduled blue sky targets 2012 Scheduled blue sky targets Identified targets extending historic veins ¾ (+40 of these, systematic review needed) 20

  21. Slide 21: Cerro Bayo Resources - infill and step out

    Cerro Bayo Resources - infill and step out Tailings DAGNY Dalila Yasna FABIOLA Coyita Mill DELIA LAGUNA VERDE 21 21

  22. Slide 22: Cerro Bayo Schedule - exploration & drilling

    Cerro Bayo Schedule - exploration & drilling Infill AFE 43,605 m core ~US$3.9 million budgeted Goal: Add > 200 K oz Au Eq. M&I Step-out AFE 17,312 m core ~US$2.3 million budgeted Goal: Add >100 K oz Au Eq. M&I Blue Sky AFE 12,000 m core ~US$1.5 million budgeted Goal: Drill Confirm new veins for 2012

  23. Slide 23: Fabiola Vein & outcrops

    Fabiola Vein & outcrops 2010 development hit more ore than expected 2010 drilling hit high grade where low grade expected 23

  24. Slide 24: Dagny Vein & outcrops

    Dagny Vein & outcrops 2010 development hit more ore than expected 24

  25. Slide 25: Yasna Vein - initial results

    Yasna Vein - initial results 2010 drilling hit high grade where low grade expected 25

  26. Slide 26: Cerro Bayo District - current targeting

    Cerro Bayo District - current targeting NI43-101 Reserve-Resource veins ¾ 2011 Infill Drilling and Step-Out Drilling 2011 Scheduled blue sky targets 2012 Scheduled blue sky targets Identified targets extending historic veins ¾ (+40 of these, systematic review needed) 26

  27. Slide 27: Cerro Bayo District - initial thoughts

    Cerro Bayo District - initial thoughts Deep Level Exposures? ¾ Irregular breccia Guanaco ¾ Multiple generations qtz. veins ¾Large volume of low grade Ag>Au ¾ High Mo Laguna Verde Mallines Marisol-Carla Cascada Mid Level Exposures? ¾ Through going veins ¾ Quiescent fill?? ¾ Limited breccia ¾ Limited

  28. Slide 28: Deep level? Open pit breccia zone behind the plant

    Deep level? Open pit breccia zone behind the plant Breccia in pit wall Py-Mo breccia in pit wall with older & younger qtz. vns. Approx. 1m 28

  29. Slide 29: Mid level? Marisol– 500 m wide alteration zone

    Mid level? Marisol– 500 m wide alteration zone Barite crystals on Carla Vein Marisol vein- 1.2 km long +/-1m wide, 0.1-11 g/t Au equiv. in channel samples 29

  30. Slide 30: High level? Silica replacement cap at Sinter Hill

    High level? Silica replacement cap at “Sinter Hill” 30

  31. Slide 31: High level? Veta Madre stringer zone

    High level? Veta Madre stringer zone Calcite Replacement Texture Western 40 m of 100m wide zone 31

  32. Slide 32: High level? Veta Madre vein system - upper zone

    High level? Veta Madre vein system - upper zone 32

Mandalay Resources — Corporate Update (January 2011) on 6ix