Boral — ESG Presentation (September 2017)
10 slides from Boral's sustainability presentation, Sep 6, 2017
Slide 1: Safety and Environmental Data for FY2017
BORAL Safety and Environmental Data for FY2017 For Macquarie ESG lunch 6 September 2017 Boral’s new fixed concrete plant at Granville, NSW
Slide 2: Boral Group overview
Boral Group overview1 • Boral is an international building and construction materials group with operations in Australia, North America, Asia and the Middle East • 703 operating sites • 17 countries • ~16,475 employees • ~8,200 contractors 1. Includes USG Boral and Meridian Brick joint venture opera
Slide 3: Safety performance
Safety performance Company-wide commitment to Zero Harm Today Employee and Contractor RIFR1 • Continuing to reduce injuries in FY2017 (per million hours worked) LTIFR with 8% improvement in RIFR1 down to 19.0 8.1 from 8.8 MTIFR 17.4 RIFR - LTIFR increased slightly to 1.5 from 1.3 - MTIFR reduced to
Slide 4: Divisional safety performance
Divisional safety performance Acquired businesses are a key area of focus Employee and Contractor Divisional RIFR1 (per million hours worked) FY2017 FY2016 Var, % • Meridian Brick JV underpinned increased RIFR in Boral North America Boral Australia 11.2 13.1 15% in FY2017 • Acquired businesses are a
Slide 5: Safety performance
Safety performance Outperfoming Australian industry benchmarks Boral Australia’s Lost Time Injury Frequency Rate (LTIFR) relative to Australia industry averages1 (per million hours worked) 8.6 8.3 8.0 1.3 Manufacturing Transport, postal Construction Boral Australia and warehousing 1. Safe Work Austr
Slide 6: Our GHG emissions totalled 2.50m tonnes in FY17
Our GHG emissions totalled 2.50m tonnes in FY17 Boral’s emissions and emissions intensity have reduced by ~30% since FY12 GHG emissions from operations1 and emissions intensity per A$m of revenue2 (million tonnes of CO2-e) 1. Data provided for FY2017 GHG emissions and energy consumption is for Boral
Slide 7: Boral's energy and fuel exposure
Boral’s energy and fuel exposure Energy and fuel costs make up ~7% of Boral’s overall cost base FY20171 Boral Boral USG Total Gas usage ~9PJ1 p.a. Australia North Boral - Fixed term contracts: Australian east America (50% share) coast contracts renew January 2018, WA renews 2017 Gas ~2.6PJ ~2.9PJ
Slide 8: Boral 2017 Annual Review & Sustainability Report
Boral 2017 Annual Review & Sustainability Report Available from 15 September 2017 8
Slide 9: Disclaimer
Disclaimer The material contained in this document is a presentation of information about the Group’s activities current at the date of the presentation, 30 August 2017. It is provided in summary form and does not purport to be complete. It should be read in conjunction with the Group’s periodic rep
Slide 10: Boral Limited www.boral.com.au
Boral Limited www.boral.com.au