Boom Logistics Ltd · ASX:BOL

Boom Logistics — FY2022 Earnings Presentation

20 slides from Boom Logistics's earnings presentation, Aug 26, 2022

  1. Slide 1: FY22 Results

    FY22 RESULTS 26 August 2022 Boom Logistics FY22 Results 0

  2. Slide 2: About Us

    ABOUT US At Boom, we deliver safe lifting solutions, Our People are our strength. We strive to retain with scale and precision, every time. Managing risk and recruit the best talent to ensure safety, performance and complexity with confidence – that’s the promise we and growth including our commitme

  3. Slide 3: FY22 Results

    FY22 RESULTS* Revenue EBITDA EBIT NPAT $215.8m $41.6m $7.1m $3.8m up from $173.3m up from $36.3m up from $4.5m up from $1.2m Operating Cashflow ROCE Net CAPEX Gearing $37.6m 4.1% $16.8m 29.4% (net debt/equity) up from $25.9m up from 2.5% up from $14.7m (before tax) * FY22 compared to FY21 (pcp) Boom

  4. Slide 4: Safety & ESG

    SAFETY & ESG Positive safety TRIFR SAOFR culture across • Boom’s safety performance is a key operational metric, the business with ongoing focus on Safe Act Observations (SAO’s) and on-site interactions with the workforce with SAOFR • Three year HSEQ strategic plan in place with a transition to over

  5. Slide 5: Diversified Revenue Streams

    DIVERSIFIED REVENUE STREAMS Boom Logistics FY22 Results 4

  6. Slide 6: Operating Results

    OPERATING RESULTS FY22 FY21 Change FY22 revenue up 25% $’m $’m % Revenue from Services 215.8 173.3 25% • SCM21 Olympic Dam shutdown • Coopers Gap and Bango wind farms Less: Direct Expenses (147.1) (113.1) 30% • Snowy 2.0 infrastructure project Gross Profit 68.7 60.2 14% • Increased maintenance activ

  7. Slide 7: Balance Sheet

    BALANCE SHEET 30 Jun 22 $’m 30 Jun 21 $’m Change $m Cash 2.4 2.3 0.1 • Gearing at 29% within Board approved range of Trade and Other Receivables 41.5 42.9 (1.4) 20%-35% Other Assets 3.0 2.7 0.3 • Net Debt of $32.7m at 30th June 2022, compared to $29.4m at 30th June 2021 Property Plant and Equipment

  8. Slide 8: Cash Flow

    CASH FLOW FY22 $’m FY21 $’m Change $m EBITDA 41.6 36.3 5.3 • Working capital optimised to manage timing of Movement in working capital (1.0) (7.5) 6.5 projects and shutdowns Interest paid (cash net of interest (3.0) (2.9) (0.1) received) • Net capex of $16.8m with assets committed to: Cash flow from

  9. Slide 9: Crane & Shutdown Services

    CRANE & SHUTDOWN SERVICES Strong demand in mining sector FY22 overview with crane • Significant revenue growth across all regions with 37% services revenue up 37% increase in Crane & Shutdown Services • Major BHP Olympic Dam SCM21 completed, delivering $17.9m in shutdown revenue on last year • Contr

  10. Slide 10: Travel Towers

    TRAVEL TOWERS Focus on renewables, FY22 overview interconnector • FY22 revenue lower, as telecommunications network upgrades and energy in Melbourne and Sydney deferred due to COVID restrictions sectors for large • High-voltage transmission line project in the Pilbara (WA) Travel Towers scope extend

  11. Slide 11: Projects

    PROJECTS Infrastructure and wind farm FY22 overview project revenue • Wind farm installation works completed at Coopers Gap and commenced new project at Bango wind farm (NSW) up 33% • Snowy 2.0 project continued, installing new tunnel boring on last year machines (TBMs) and tunnel refurbishment work

  12. Slide 12: Asset Management

    ASSET MANAGEMENT Crane and Travel Tower utilisation FY22 overview • Total asset utilisation at 81%, up from 77% last year • $16.8m net capex facilitating delivery of major contracts and securing new growth opportunities • Ongoing use of flexible asset rental model continues to enable efficient asset

  13. Slide 13: Our Industries & Market Opportunities

    OUR INDUSTRIES & MARKET OPPORTUNITIES Mining support services is Wind farm construction Mining circa $37B* over next 3 years, Renewables projects planned is circa driven by strong demand for $5B* over next 3 years commodities Renewables Mining Boom provides a total Boom provides total lifting constr

  14. Slide 14: FY23 Outlook

    FY23 OUTLOOK 1H revenue versus pcp Strategy to achieve long Building recurring Strong tender pipeline to be lower without term profit growth in revenues on Mining in Renewables as SCM21 project. Strong growth markets and maintenance and major wind farm projects 2H revenue expected as return on capit

  15. Slide 15: Appendix

    APPENDIX Boom Logistics FY22 Results

  16. Slide 16: Wind Farm sector

    Wind Farm sector Powering in Renewables • Boom provides installation, engineering and maintenance services on wind farms across Australia • Our maintenance activities include removal and replacement of gear boxes, generators and blades • Our construction package includes installation of towers, mech

  17. Slide 17: Mining & Resources sector

    Mining & Resources sector Maintenance and Shutdowns • Providing 24/7 lifting solutions, using cranes and crews, travel towers, engineering services, supervision and project management on mine sites • Work includes shutdowns, major lifts to support bucket rebuilds, shovel replacements, conveyor belt

  18. Slide 18: Infrastructure sector

    Infrastructure sector Growth in construction work • Ongoing major tunnel boring machine (TBM) and infrastructure work for Snowy 2.0 project • Completed Armadale Road Bridge, Parramatta Light Rail, Martinus Rail, and Melbourne level crossing projects • Strong tender pipeline on infrastructure, civil

  19. Slide 19: Energy sector

    Energy sector Power Transmission Lines • Continuing high voltage project work in the Pilbara WA • Contracted to provide travel towers and specialised labour for the completion of a 220kv transmission line running between mines in the Pilbara region • The current stage includes the installation of 28

  20. Slide 20: Disclaimer

    DISCLAIMER This presentation contains certain forward-looking statements with respect to the financial condition, results of operations and business of Boom and certain plans and objectives of the management of Boom. Forward-looking statements can generally be identified by the use of words such as