Boral — Corporate Update (November 2021)
21 slides from Boral's corporate update, Nov 30, 2021
Slide 1: Boral Cement Berrima Community Meeting
Click to edit Master title style Subheader Boral Cement Berrima Community Meeting Mittagong RSL Club 30 November 2021
Slide 2: Agenda
Agenda 1. Welcome, introductions, safety moment, administration 2. Operations summary 3. Environmental works update 4. Planning and projects 5. Communications update 6. General business and contacts 7. Next meeting 2
Slide 3: Welcome
01 Welcome
Slide 4: Boral Representatives
Boral Representatives Boral staff Dean Beltrame, Operations Manager Berrima Greg Johnson, Environmental Sustainability Manager Chris Aebi, National Health & Hygiene Manager Kate Woodbridge, Stakeholder Relations Manager NSW and ACT 4
Slide 5: Operations review
02 Operations review
Slide 6: Berrima Cement Operations – a quick update
Berrima Cement Operations – a quick update Safety People Community Customer Performance 6
Slide 7: Environmental Works Update
03 Environmental Works Update
Slide 8: Environmental Overview
Environmental Overview - Greg ˃ The 2021 Annual Environmental Management Review (May 2020 – April 2021) was submitted to DPIE in late June 2021 and acknowledged by DPIE in July 2021. Full report is available on the website. ˃ The following is a summary of management plan updates, monitoring, audits
Slide 9: Monitoring – Air Quality Management
Monitoring – Air Quality Management ˃ During the reporting period the site implemented the trial real-time dust monitor which links directly to the control room along with the site Trigger Action Response Management Plan (TARP) for dust which the site monitors current and forecast weather to manage
Slide 10: Air Quality Management – Dust Deposition
Air Quality Management – Dust Deposition During the reporting period (1 May 2020 – 30 April 2021) 14 complaints were received from the community in relation to deposited dust on vehicles and property, this was a decrease from 78 in 2019/20 reporting period. Since the 1 May 2021 we have received 0 co
Slide 11: Air Quality Management – High Volume Air sampling
Air Quality Management – High Volume Air sampling All readings were below the TSP annual average goal and PM10 24hour standard 11
Slide 12: Noise Monitoring
Noise Monitoring ˃ Boral manages noise on site in accordance with the Berrima Cement Works – Noise Management Plan (Boral 2018, updated April 2020), which describes the monitoring points, frequency and criteria. ˃ The Boral Cement Berrima works has a single noise limit condition for the total site,
Slide 13: Planning and projects
04 Planning and projects _—
Slide 14: Solid Waste Derived Fuels (SWDF)
Solid Waste Derived Fuels (SWDF) Project Name Modification 14 SWDF increase, delivery variation & site access Project Objective • To alter the composition of fuels used to feed the kiln by increasing SWDF (including the use of tyres) as a replacement for coal; • Amend vehicle movements, hours of del
Slide 15: Communications update
05 Communications update
Slide 16: Community Liaison group
Community Liaison group The Berrima Cement Works Community Liaison Group last met on 5 August 2021 The CLG representatives are: ˃ Clive West (Berrima Residents Association) ˃ Andrew Wood (New Berrima resident) ˃ Barry Arthur on behalf of Wingecarribee Shire Council ˃ Dean Beltrame, Greg Johnson and
Slide 17: Adopting climate targets aligned with <1.5°C pathway
Adopting climate targets aligned with <1.5°C pathway We have set science-based climate targets and committed to net-zero emissions from our operations by no later than 20501, in line with the most ambitious aim of the Paris Agreement to limit global warming to 1.5°C ▪ Committed to net zero emissions
Slide 18: Decarbonisation pathways have been identified
Decarbonisation pathways have been identified 18
Slide 19: General business
06 amie General business
Slide 20: General business and contacts
General business and contacts Items of general business Next meetings ˃ Next Community Liaison Group – February 2022 ˃ Next ‘Whole of Community’ meeting – November 2022 unless required beforehand Boral Berrima Cement contacts: ˃ Berrima Cement Works Reception 02 4860 2222 ˃ Kate Woodbridge Stakehold
Slide 21: Thanks for your participation
Thanks for your participation 21