Slide 1: Welcome to Imperial Metals Corporation Annual General Meeting
Welcome to Imperial Metals Corporation Annual General Meeting Wednesday, May 25, 2022 1
Slide 2: Election of Directors
Imperial | Election of Directors • Carolyn D. Anglin • Janine North • Brian Kynoch • James Patrick Veitch • Pierre Lebel • Edward Yurkowski • Larry Moeller 2
Slide 3: Appointment of Auditors
Imperial | Appointment of Auditors Appointment of Deloitte LLP as Auditors of the Company for the ensuing year and authorizing the Directors to fix the remuneration of the Auditors. 3
Slide 4: Approval of Unallocated Stock Options
Imperial | Approval of Unallocated Stock Options “RESOLVED, AS AN ORDINARY RESOLUTION, THAT: 1. all unallocated stock options under the Company’s Amended and Restated Stock Option Plan (2007) (“Amended Plan”) be and are hereby approved; 2. the Company has the ability to continue granting stock optio
Slide 5: Voting Results
Imperial | Voting Results • Election of Directors • Appointment of Auditors • Approval of Unallocated Stock Options 5
Slide 6: Company Presentation
Company Presentation 6
Slide 7: Cautionary Note | Forward-Looking Information
Cautionary Note | Forward-Looking Information Certain statements in this presentation may constitute forward-looking information within the meaning of Canadian securities laws. Other than statements of historical facts, statements which address estimated mineral resource and reserve quantities, grad
Slide 8: Mount Polley | Reopening
Imperial Mount Polley | Reopening Awi Metals
Slide 9: Mount Polley | Reopening in 2022
Mount Polley | Reopening in 2022 The Mount Polley mine consists of a conventional truck-shovel open pit mine with a small underground component, with conventional crushing, grinding and flotation technology to process about 7 million tonnes of ore per year. Springer Pit Plant Site 9
Slide 10: Mount Polley | Reopening
Imperial Mount Polley | Reopening Awi Metals Sportinear Bit
Slide 11: Mount Polley | Mining since November 2021
Mount Polley | Reopening Mining since November 2021 11
Slide 12: Mount Polley | Reopening
Mount Polley | Reopening Mobilizing drill to saddle between the Cariboo and Springer pits – December 2021 Mining in saddle between the Cariboo and Springer pits – April 2022 Mining operations to began anew in November 2021, by the end of April approximately 6.8 million tonnes had been mined in prepa
Slide 13: Mount Polley | Reopening
Imperial Mount Polley | Reopening Awi Metals
Slide 14: Mount Polley Main Zone Long Section
. Imperial Mount Polley | Reopening AX Metals 1300 — 1200 - Mount Polley Main Zone Long Section (az 162) 1000 — 900 - 800 - 700 — 14
Slide 15: Mount Polley | Grinding Circuit
Mount Polley | Reopening Grinding Circuit: three stage grinding circuit, two rod mills, three ball mills, and three pebble mills. 15
Slide 16: Mount Polley | Gold and Copper Production
Mount Polley | Reopening Gold Production (ounces per year ) Copper Production (pounds per year) Cariboo ore only; 70000000 120000 Majority Wight Pit, high gold, high copper oxide high copper and 2012- 2013 therefore, low low oxide ratio Majority Deep 100000 2012 -2013 60000000 copper recovery yielde
Slide 17: General Arrangement of Conceptual Block Cave
Mount Polley | Reopening General Arrangement of Conceptual Block Cave 17
Slide 18: Springer at depth exploration target
Mount Polley | Reopening Shadow of Springer exploration target Springer at depth 18
Slide 19: Mount Polley | Copper and green minerals demand
Mount Polley | Reopening Copper and other green minerals are going to be needed in massive amounts to decarbonize the world’s economies, and a reopened Mount Polley can help provide some of the required copper. 19
Slide 20: Red Chris Mine | Exploration Success
Red Chris Mine | Exploration Success Section line 20
Slide 21: Red Chris Mine | East Ridge Section
Red Chris Mine | East Ridge Section 21
Slide 22: Red Chris Mine | Longitudinal Section of Development Area
Red Chris Mine | Longitudinal Section of Development Area 22
Slide 23: Red Chris Mine | Underground Development
Red Chris Mine | Underground Development Portal collared at end of June 2021; exploration decline has advanced more than 1300 metres. 23
Slide 24: Red Chris Mine | September 2021 Prefeasibility Study
Red Chris Mine | September 2021 Prefeasibility Study 24
Slide 25: Red Chris Mine | Block Cave Pre-Feasibility Summary
Red Chris Mine | Block Cave Pre-Feasibility Summary • Ore production of 406 million tonnes and 4.9Moz Au and 1.5Mt copper • Life of mine annual production of 158 koz Au and 48kt copper • Peak Production of 316koz Au and 80kt Cu FY2029-2034 • Average all in Sustaining Costs of C$180/oz • Total estima
Slide 26: Red Chris Mine | Block Cave Mine Design
Red Chris Mine | Block Cave Mine Design 26
Slide 27: Red Chris Mine | Block Cave: Early Mining
Red Chris Mine | Block Cave: Early Mining 27
Slide 28: Huckleberry | Mine Site with Exploration Targets
Huckleberry | Mine Site with Exploration Targets West Main Zone Target • Several drill holes at various orientations with ore-grade intercepts adjacent to Main Zone Northeast Target stock (probable Main Zone ore • 91m @ 0.287% Cu in 2004 drill hole 04- source) 287 • 72m @ 0.338% Cu in historical • T
Slide 29: Huckleberry | New Targets
Imperial Huckleberry | New Targets IN Metals 615000 620000 630000 Huckleberry and Whiting Creek ZTEM Survey - 2021 Resistivity at Om Depth and Exploration Targets ac: Creek i oO 2021_ZTEM_Resistivity Targets Lakes — Main FSR Major Rivers 615000 620000 630000
Slide 30: Imperial | Diverse Project Portfolio
Imperial | Diverse Project Portfolio 1 Red Chris (30%) Operating Mine 2 Mount Polley/ Huckleberry Reserve/Permitted Mine on Care and Maintenance 5 Cat Face/Sustut/Ruddock Resource 4 Fandora Exploration Drilling 15 Lj/Wasi Grassroots Exploration 27 06 Total Projects 14 Royalty Interests Copper Projec