Yancoal Australia Ltd. · ASX:YAL

Yancoal Australia — Corporate Update (March 2015)

37 slides from Yancoal Australia's corporate update, Mar 24, 2015

  1. Slide 1: Community Consultative Committee Presentation – 24 March 2015

    Ashton Coal Operations Pty Ltd Community Consultative Committee Presentation – 24 March 2015

  2. Slide 2: Action List

    Action List ITEM RESPONSIBILITY PROGRESS UPDATE Newsletter to be drafted, published and distributed to DS Articles being prepared for the newsletter. A brief community – including donations summary, SEOC appeal, bio/profile is required for each CCC Member if UG infrastructure projects and rehabilita

  3. Slide 3: Community Newsletter

    Community Newsletter ▪ Yancoal appointed Community Relations Coordinator in February ▪ Standard Yancoal Branding ▪ Proposal frequency TBD (Autumn 2015) ▪ 2015 Topics • CCC Members • Message from Operations Manager • Community Support Projects • WMRS Nursery establishment • Mine planning – extraction

  4. Slide 4: Ashton Statistics

    Ashton Statistics Ashton Coal Statistics 2014 Actual 2014 Budget Jan-15 Feb-15 2015 Budget ROM (t) 2,771,218 3,196,678 355,977 30,981 567,250 YTD Product Coal (t) 1,278,770 1,571,908 126,224 39,597 291,996 YTD Total Coal Sales (t) 1,259,207 1,520,000 98,643 60,374 208,000 YTD Lost Time Injury (LTI)

  5. Slide 5: Community Support Program

    Community Support Program ▪ Q1 2015 – Mayoral Scholarship Program ▪ Community Support Program • Established to provide assistance to local initiatives within the Upper Hunter region of Singleton and Camberwell. • Wide range of community needs such as education, environment, health, infrastructure pr

  6. Slide 6: Current Operations / Projects

    Current Operations / Projects • ACOL is approximately 80% through LW103 in the Upper Liddell Seam. The LW suffered significant delays due to stone intrusions and seam thinning resulting in the loss of ~6 weeks production. • South East Open Cut – no further movement • Upper Lower Liddell Drifts (ULLD

  7. Slide 7: Exploration Activities

    Exploration Activities No exploration was conducted in EL5860 or EL4918. 7 20 December 2024 7

  8. Slide 8: Approvals Update

    Approvals Update As mining at ACOL progresses additional approvals are required to continue operations. Recent Approval determinations include: • First workings approval for North West Mains and LW106-107B Gategroads • Dams Safety Committee – First workings Approval for Void 5 Ash Dam Future approva

  9. Slide 9: EP 105-107 Extraction Plan

    EP 105-107 ▪ ACOL is in the process of preparing an Extraction Plan covering LW 105 to 107 in the ULD Seam. ▪ ACOL have proposed a mine plan which remains consistent with DA 309-11-2001-i however differs slightly from the previously assessed layout. ▪ The layout is designed to optimise underground m

  10. Slide 10: Comparison of Previous vs Proposed Layout

    Comparison of Previous vs Proposed Layout Previous Layout (LW105-108) Proposed Layout (LW 105-107) 10 20 December 2024 10

  11. Slide 11: Key features in the EP area

    EP 105-107 ▪ Key features in the EP area include: ▪ Lemington Road ▪ New England Highway ▪ Bowman's Creek Diversion ▪ Power infrastructure ▪ Unsealed access roads ▪ Water pipelines (Ravensworth – Mt Owen) ▪ Easements for power and gas pipelines (no existing pipeline) ▪ NOW Gauging Station ▪ Ravenswo

  12. Slide 12: Management measures and controls for subsidence impacts

    EP 105-107 ▪ Management measures and controls for subsidence impacts include: ▪ Pre, during and post subsidence monitoring ▪ Groundwater monitoring ▪ Visual inspections ▪ Onsite road maintenance crew ▪ Signage ▪ Regular reporting and incident notification protocols ▪ Operational checks such as press

  13. Slide 13: Questions or comments contact

    EP 105-107 ▪ Should you have any questions or comments please don’t hesitate to contact me at: James Barben Environment and Community Coordinator James.barben@yancoal.com.au 02 65 709 102 0409 526 374 13 20 December 2024 13

  14. Slide 14: Environment Monitoring Data

    Environment Monitoring Data ▪ The following slides present environmental monitoring data for the reporting period ▪ Meteorological • Rainfall ▪ Air Quality • Depositional Dust Gauges – Total suspended dust • PM10 – Tapered Element Oscillating Microbalance (TEOM) ▪ Surface Water – Glennies Ck, Bowman

  15. Slide 15: Rainfall

    Rainfall 15 20 December 2024 15

  16. Slide 16: Air Quality & Noise Monitoring Locations

    Air Quality & Noise Monitoring Locations 16 20 December 2024 16

  17. Slide 17: Depositional Dust

    Depositional Dust On-site Dust Gauges 17 20 December 2024 17

  18. Slide 18: Total Suspended Dust

    Total Suspended Dust 18 20 December 2024 18

  19. Slide 19: Total Suspended Dust

    Total Suspended Dust 19 20 December 2024 19

  20. Slide 20: PM10 Dust – Site 1

    PM10 Dust – Site 1 20 20 December 2024 20

  21. Slide 21: PM10 Dust – Site 2

    PM10 Dust – Site 2 21 20 December 2024 21

  22. Slide 22: PM10 Dust – Site 3

    PM10 Dust – Site 3 22 20 December 2024 22

  23. Slide 23: PM10 Dust – Site 8

    PM10 Dust – Site 8 23 20 December 2024 23

  24. Slide 24: Surface Water Sampling Locations

    Surface Water Sampling Locations 24 20 December 2024 24

  25. Slide 25: Surface Water Quality – pH

    Surface Water Quality – pH 25 20 December 2024 25

  26. Slide 26: Surface Water Quality – EC

    Surface Water Quality – EC 26 20 December 2024 26

  27. Slide 27: Surface Water Quality – pH

    Surface Water Quality – pH 27 20 December 2024 27

  28. Slide 28: Surface Water Quality – EC

    Surface Water Quality – EC 28 20 December 2024 28

  29. Slide 29: Surface Water Quality – pH

    Surface Water Quality – pH 29 20 December 2024 29

  30. Slide 30: Surface Water Quality – EC

    Surface Water Quality – EC 30 20 December 2024 30

  31. Slide 31: Groundwater Sampling Locations

    Groundwater Sampling Locations 31 20 December 2024 31

  32. Slide 32: Groundwater – Standing Depth

    Groundwater – Standing Depth 32 20 December 2024 32

  33. Slide 33: Groundwater – EC

    Groundwater – EC 33 20 December 2024 33

  34. Slide 34: Noise Monitoring

    Noise Monitoring Attended noise monitoring is conducted Monthly. There were no exceedences for the reporting period. 34 20 December 2024 34

  35. Slide 35: Complaints and Enquiries

    Complaints and Enquiries There were nil complaints received during this quarter. 2014 2015 YTD Complaints 1 0 Enquiries 1 0 Note: The noise files were assessed for the 2014 complaint and they were found to be dominated by livestock and noise from highway traffic. ACOL conducted attended noise monito

  36. Slide 36: What else is going on?

    What else is going on? ▪ Triannual CCC Frequency ▪ AEMR Preparation and Lodgement (Copies available on website) ▪ 1 Alpha St – WMR Nursery • Tree Planting and irrigation works on Bowmans Creek Diversion ▪ Weed Management • Weeds along Glennies Creek including Green Cestrum, Castor Oil Plant and Boxt

  37. Slide 37: Any Questions?

    Any Questions? 37 20 December 2024 37