Slide 1: Kier Group plc Infrastructure Services Seminar 6 July 2016
Kier Group plc Infrastructure Services Seminar 6 July 2016 1
Slide 2: Haydn Mursell, Chief Executive
Haydn Mursell Chief Executive Kier Group plc 2
Slide 3: Disclaimer
Disclaimer No representation or warranty, expressed or implied, is made or given by or on behalf of Kier Group plc (the “Company” and, together with its subsidiaries and subsidiary undertakings, the "Group" or any of its directors or any other person as to the accuracy, completeness or fairness of t
Slide 4: Today's schedule
Today's schedule Corporate update Trading, market and Group overview Haydn Mursell / Bev Dew Construction & Infrastructure Services Nigel Brook 10:30 Operations Construction - Infrastructure Sean Jeffery (Part 1) Guest contributor (video) Jim O'Sullivan, Highways England Services – Highways Dave Wri
Slide 5: Kier executive presenters
Kier executive presenters Haydn Mursell Bev Dew Nigel Brook Sean Jeffery Dave Wright Chief Executive Group Finance Executive Executive Executive Director Director Director Director Construction & Construction - Services - Infrastructure Infrastructure Highways Services Area 3 operations team 5
Slide 6: Guest contributors
Guest contributors Jim O'Sullivan Geoff Dobson Chief Executive Chief of Highways England Resource Management Suffolk County Council 6
Slide 7: Group update
Group update Core Market businesses Current conditions and trading & Brexit market position Simplifying Vision Group the 2020 summary portfolio summary 7
Slide 8: Current trading
Current trading Property Residential Construction Services >15% ROCE c1,450 Mixed c£2bn revenue c£2bn revenue >10 schemes Tenure units c2% operating c5% operating completed c750 Private margin margin annually units Order book Order book Avg capital Avg capital c£3.5bn c£5.5bn
Slide 9: Market Position and Brexit
Market Position and Brexit Brexit potential implications Property Residential 75% UK regions 100% regional Property Non-speculative private player Non speculative = yield producing focus Average sale Modest value, lower individual transaction exposure >£1bn pipeline price <£250k Pipe
Slide 10: Market Position and Brexit
Market Position and Brexit Brexit potential implications Construction Services UK building Mouchel Construction market good and performing well 85% secured for FY17 less competitive and LA highways strong pipeline Building – long term frameworks, less competition, Infrastructure risk profi
Slide 11: Group Brexit Summary
Group Brexit Summary Largest part of the Group (Services) is least affected c60% of Group profit Breadth of activities provides flexibility and resilience Order book of c£9bn > 85% secured in Construction and Services for FY17 c50% of Services secured and probable to 2020 Disciplined a
Slide 12: Current portfolio
Current portfolio Property Residential Construction Services Development and Structured Finance Invest Private, Mixed Tenure and Affordable Housing Building, Infrastructure, Build International Highways, Housing Maintenance, Facilities Maintain Management, Utilities, Environmental 12
Slide 13: Core businesses
Core businesses Building Infrastructure Residential Developments and Developments and Structured Finance Structured Finance Kier Living Invest Capital & Investment Construction - Regional Building Infrastructure Kier Living Build Options - Property Facilities Housing Highways Management Maintenance
Slide 14: Market position
Market position Leading UK Leading Top 3 infrastructure regional housing player builder maintenance (Kier + MG + Mouchel) provider with new build capabilities £1.5bn £1.5bn £600m >80% of Group turnover 14
Slide 15: Vision 2020: key future portfolio determinants
Key future portfolio determinants Vision 2020 Ability Fit with to generate Top 3 Cash positive integrated sustainable potential / ROCE > 15% offer profit Market Control / risk Client fit prospects management 15
Slide 16: Simplifying the portfolio
Simplifying the portfolio International Mouchel Environmental (Caribbean) Consulting Strategic fit Sustainable margin / pipeline ROCE > 15% Top 3 market position Risk Management Client Relationship Ongoing - expected to complete during 2017 16
Slide 17: Vision 2020 summary
Vision 2020 summary FY14 FY16 Journey to date Discipline / Risk management T/O £4.3bn Profit growth 10% YoY T/O £3.0bn PBT >£120m Order book visibility significantly improved PBT £88m Net Debt/EBITDA < 1x Net debt stable or reducing Div/Cover > 1.6 Progressive dividend (growth just behind earnings)
Slide 18: Group summary
Group summary Positive On track with Acquisitions FY16 Vision 2020 integrated trading goals Disciplined Focus on Growth and proven our core trajectory track record businesses 18
Slide 19: Bev Dew, Group Finance Director
Bev Dew Group Finance Director 19
Slide 20: Cash utilisation
Cash utilisation 250 120% cash conversion 200 +50 DIVIDEND -50 150 75 100 185 INVESTMENT DIVIDENDS 50 110 INVESTMENT - EBITDA Working Pension, Free cash capital interest & tax flow movement 20
Slide 21: Net debt
Net debt 400 350 300 250 200 < £140m 150 100 50 0 21
Slide 22: Working capital - monthly
Working capital - monthly Monthly cash cycle 400 Payment made at the end of month 350 Intra-month working 300 capital £90m Swing £90m 250 200 150 100 50 0 22
Slide 23: Working capital - annual
Working capital - annual Annual cash cycle 400 Cycle of £90m driven by work-led seasonality 350 300 Average monthly net debt 250 200 150 100 50 0 23
Slide 24: Peak net debt mid Feb
Peak net debt mid Feb Peak capital structure 400 approaching £350m 350 300 250 200 150 100 50 0 24
Slide 25: Peak net debt
Peak net debt Peak net debt asset 400 backed No net debt in 350 Construction and Services divisions 300 250 200 Residential assets 150 100 Property 50 assets 0 25
Slide 26: Facilities
Facilities £720m facilities 800 available as at 30 June 2016 700 600 500 c. £350+ headroom vs peak net debt 400 300 200 100 0 Peak net debt Facilities 26
Slide 27: Facilities
Facilities Average duration of 400 7 years RCF 85% beyond 4 350 Term Loan years 300 USPP 40% fixed rate Schuldschein 250 200 150 100 £82m/€100m 50 0 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 27
Slide 28: Net debt conclusion
Net debt conclusion Vision 2020 metrics re-validated Net debt to EBITDA 1:1 by 2017 – achieved one year ahead of target Group cash cycle results in peak net debt in line with assets in mid Feb Facilities give Group long-term core financial strength and flexibility to invest Maintenance of
Slide 29: Nigel Brook, Construction and Infrastructure Services
Nigel Brook Executive Director Construction and Infrastructure Services 29
Slide 30: Today's operational team presenters
Today's operational team presenters Sean Jeffery Dave Wright Scott Cooper Executive Director Executive Director Service Director Infrastructure Infrastructure - Highways Highways 30
Slide 31: Health and Safety – Accident Incidence Rate (Kier UK)
Health and Safety – Accident Incidence Rate (Kier UK) 500 450 HSE Benchmark 400 350 297 300 282 281 278 274 245 250 230 209 210 203 200 181 183 150 100 50 0 May-15 Jun-15 Jul-15 Aug-15 Sep-15 Oct-15 Nov-15 Dec-15 Jan-16 Feb-16 Mar-16 Apr-16 Source: HSE Benchmark October 2015 31
Slide 32: Market position
Market position Leading UK Leading Top 3 infrastructure regional housing player builder maintenance provider with new build capabilities £1.5bn £1.5bn £600m >80% of Group turnover 32
Slide 33: Market position
Market position Leading UK Leading Top 3 infrastructure regional housing player builder maintenance provider with new build capabilities £1.5bn £1.5bn £600m Construction Services (Capex) (Opex) Infrastructure Services - includes Highways Maintenance 33
Slide 34: Kier's areas of expertise
Kier's areas of expertise Breadth Local of capability Authority Strategic (Opex) Highways Aligned to (Opex) Government spending Wide skill base Capital £1.5bn In-house Design works (Capex) Design & Consultancy (Mouchel Consulting) Utilities & Waterways (Opex) 34
Slide 35: Infrastructure Services
Infrastructure Services Construction Services 20% 36% 23% 100% Utilities Strategic Highways Local Authorities 7% 1% 1% 12% Infrastructure Waterways Streetlighting Surface Dressing Design Total revenue £0.4bn Total revenue £1.1bn Infrastructure Services accounts for c.30% of Group revenue 35
Slide 36: UK Highways market
UK Highways market Highways England Local authorities and others Total annual highways spend £14bn £14bn £2bn Kier is largest supplier 4 areas New c.40% of spend expanded Capex New procurement opportunity £5bn provides growth opportunities £1bn £2bn Outsourced c.14% of spend Opex Healthy
Slide 37: Highways England funding
Highways England funding Five year funding Capex (Delivery Plan funding) Opex (Delivery Plan & CSR funding) Minor Capex works visibility 4,075 Road Investment £m 3,640 3,321 Strategy (RIS) 2,903 1,101 2,854 Government 1,113 1,080 backed Kier 1,072 1,076 Highways RIS1 totals 2,974 £17bn over fi
Slide 38: Acquisition rationale
Acquisition rationale JULY 2013 JUNE 2015 NOV 2015 APRIL 2016 Integration of Local Strategic Integration of infrastructure Authority Highways Kier Highway and utility Services focus operations business including highways units and utilities Development of an integrated capability in the Highways and
Slide 39: Capital works: Infrastructure projects
Capital works: Infrastructure projects Over thirty projects across the UK 39
Slide 40: Capital works: Highways projects
Capital works: Highways projects A number of highways projects including: Mersey Gateway Smart Motorways – M6 A30 40
Slide 41: Opex: Highways England footprint
Opex: Highways England footprint Maintaining approximately one third of England’s Strategic Highways network Kier hold a Area 13 Area 7 share of one of the four Scottish Area 9 regional Highway contracts Area 1 Area 3 41
Slide 42: Opex: Local Authority Highways footprint
Opex: Local Authority Highways footprint Lincoln Responsible for Northamptonshire maintaining Suffolk over 16,000 Surrey miles of Local Torbay Authority roads Harrow c.70% of Highways Westminster services not Bexley outsourced Merton Bromley Sutton Source: Credo 42
Slide 43: Total Highways footprint
Total Highways footprint Kier's Highways footprint is Highways England roughly one fifth Local Authority of the UK landmass LoHAC Streetlighting services Scotland Transerv 43
Slide 44: Infrastructure Services - order book and pipeline
Infrastructure Services - order book and pipeline Order book Pipeline Infrastructure capital projects £1.5bn £20bn Strategic Highways £1bn c.£3bn Australia (JV share) £0.5bn c.£1bn Local Authority Highways £0.5bn c.£2bn Total Infrastructure Services £3.5bn + £25bn 44
Slide 45: Our risk approach
Our risk approach JULY 2013 JULY 2015 JAN 2016 Continued Rolled out Services operation of Kier Risk Review Pre-Contract existing processes to Committee Committee robust Mouchel Mouchel implemented controls businesses Pre-contract gateway standards rolled out 45
Slide 46: People and skills
People and skills Over 1,000 on Kier early career schemes Significant projects coming on stream requiring skills Focus on managing the competitive market for early talent New entrant, graduate and undergraduate placements or post A Level Foundation Degrees 2016 target - Recruiting 230 – 24
Slide 47: Outlook
Outlook Infrastructure Acquisitions Significant Services accelerated market business platform for opportunities growing growth 47
Slide 48: Sean Jeffery, Construction - Infrastructure
Sean Jeffery Executive Director Construction - Infrastructure 48
Slide 49: 49
49
Slide 50: Infrastructure – active sectors
Infrastructure – active sectors Highways Nuclear Energy Water Rail Coastal and Ports Airports 50
Slide 51: Infrastructure capital pipeline
Infrastructure capital pipeline Coastal Water £20bn & FD opportunity Strong Energy opportunities in Highways and Rail Nuclear £20bn Highways Rail 51
Slide 52: Kier Infrastructure pipeline
Kier Infrastructure pipeline Highways Nuclear Silvertown Hinkley Congleton by-pass Sellafield East Leeds Orbital Wylfa Rail Moorside HS2 Energy MerseyRail Spalding power station Network Rail Trafford CCGT power station London Underground Gateway Knottingly Dam
Slide 53: Highways
Highways FAKIER 53
Slide 54: Mersey Gateway
Mersey Gateway Joint venture with Samsung C&T Corporation and FCC Construction SA £450m four-year road scheme with six lane toll bridge 9.5 miles in length Largest moving scaffold system currently in use in the world Completion early 2018 54
Slide 55: Smart Motorways – M6
Smart Motorways – M6 Highways England project to upgrade highways Award for packages – one live, three coming on stream Package 3 awarded in July 2015 to Kier j/v M6 J16 – 19 (tender £129.4m) M6 J13 – 15 (budget £160m) M23 J8 – 10 M20 J3 – 5 (budget £100m) (tbudget £61m) 55
Slide 56: A30, Cornwall
A30, Cornwall Cornwall – Temple and Higher Carblake Capital investment project between Cornwall County Council and Highways England Value £33m Due to be open early 2017 56
Slide 57: Silvertown, London
Silvertown, London Integrated offer Transport for London PFI project PQQ expected Autumn 2018 Expected start date Q4 2018 Value £700m 57
Slide 58: Rail
Rail FAKIER 58
Slide 59: Rail
Rail National presence covering broad range of works Port Talbot Windsor Road Parson Street Chelsea Kingston New Cross Gate Wales and Western frameworks Signalling NLCRPR framework Selby swing Black Cart 59
Slide 60: Crossrail
Crossrail Joint venture with BAM Nuttall C300 / 410 and Ferrovial (BFK) Western Running Biggest engineering project in Tunnels Europe Value £1.4bn C435 Farringdon 60
Slide 61: HS2 Enabling Works & Main Works Contract
HS2 Enabling Works & Main Works Contract 61
Slide 62: Infrastructure Opportunities
Infrastructure Opportunities Source: Kier 62
Slide 63: Jim O’Sullivan, Highways England
Jim O’Sullivan Chief Executive Highways England 63
Slide 64: Dave Wright, Kier Highways
Dave Wright Executive Director Kier Highways 64
Slide 65: What we do
What we do Manage Maintain Improve Build Communications with the public Incident response Value management Deliver improvement schemes to and stakeholders Winter maintenance Improvement scheme construction carriageway / structures renewal Management of Roadspace and and delivery and ma
Slide 66: Highways clients
Highways clients Suffolk County Council & Northamptonshire : —"] Roads & 28 County Council 5s highways S Maritime england driving forward Queensland Government 9 Department of Transport and Main Roads . . ‘eo Lincolnshire = Transport = COUNTY COUNCIL for London County Council on = ES <Z 5 Kingston L
Slide 67: Total UK highways footprint
Total UK highways footprint Highways England Local Authority Kier's Highways footprint is roughly LoHAC one fifth of the UK Streetlighting services landmass Scotland Transerv 67
Slide 68: Kier Highways England contracts
Kier Highways England contracts Area 13 Cumbria and North Lancashire Area 7 East Midlands Area 9 Birmingham including the M6 Spaghetti Junction Area 3 Hampshire / Surrey / Wiltshire Area 1 Devon and Cornwall 68
Slide 69: Kier Strategic Highways current contracts
Kier Strategic Highways current contracts Area Order book Expiration Area 1 £25m 2017 Area 3 £300m 2018 5 areas now available Area 9 £400m 2019 No % limit Area 13 £30m 2017 New Procurement Area 7 £50m 2021 Current tenders Recent Area 7 provide £50m design opportunity for contract award future gr
Slide 70: Strategic Highways market opportunity
Strategic Highways market opportunity 4.50 Performance 4.00 Long term To renew and expectations on commitment to Lower Thames Crossing improve the pace, efficient 3.50 Capital Investment (£bn) significant network customer Capital renewals investment 3.00 experience 2.50 Longer term 2.00 investment P
Slide 71: Kier Strategic Highways - order book and pipeline (UK)
Kier Strategic Highways - order book and pipeline (UK) 2017 £1.1bn 2017/18 opportunities Areas 1 and 2 - £550m £1bn c£3bn Areas13 and 14 - £500m Order Book Pipeline NRTS2 - £450m - 2018 2019 2018 £0.9bn+ £1.0bn 71
Slide 72: Kier Local Authority Highways contracts
Kier Local Authority Highways contracts Five contracts plus London Lincolnshire presence Harrow Suffolk Westminster Bexley Merton Bromley Sutton Surrey Torbay 72
Slide 73: Local Authority market - London
Local Authority market - London £2.2bn addressable market up to 2021 to transform London’s roads, including: £1.4bn £350m £450m To maintain Major Highway For cycling, asset enhancements road safety performance to support and keeping including £1bn growth London moving of capital improvements Source:
Slide 74: Kier London Highways Alliance Contract (LoHAC)
Kier London Highways Alliance Contract (LoHAC) Four area based frameworks for TfL and London Boroughs 8 year term, expires 2022, potential reductions Open to TfL and all 33 London Boroughs One provider per area capable of delivering the full range of services Streamline providers – Pre LoH
Slide 75: Kier Local Authority - order book and pipeline
Kier Local Authority - order book and pipeline 2017 £0.8bn 2017 opportunities Cambridgeshire - £600m £0.5bn c.£2bn Order Book Pipeline Devon and Plymouth - £300m 2019 2018 £0.5bn £0.7bn 75
Slide 76: Australian Highways footprint
Australian Highways footprint Roads and Maritime Services, Kimberley New South Wales Transport and Main Roads, New South Wales NORTHERN TERRITORY Main Roads, WESTERN South East Queensland Western Australia AUSTRALIA QUEENSLAND Sydney North Zone Mid West and Gascoyne SOUTH AUSTRALIA Perth Office NEW
Slide 77: Australian order book and pipeline
Australian order book and pipeline 2017 opportunities Western Australia - £150m £0.5bn c.£1bn New South Wales - £250m Order Book Pipeline 2019 2017/18 £0.6bn £0.5bn 77
Slide 78: Highways England performance (March-May)
Highways England performance (March-May) HE operates two types of contracts – Asset Support 1200 ASCs 1010 1024 998 Contracts (ASCs) and Managing Agent Contracts 1000 790 776 848 800 (MACs) 600 Based on Highways England's performance scoring 400 200 Kier ranked first (Area 3) in ASCs 0 Area 2
Slide 79: Systems
Systems Fully integrated market leading solution Intelligent costing Efficient and seamless Electronic workflow On track to go live 1 July 2016 For future use by combined Strategic and Local Authority highways BSI – pioneers UK’s first 11000 alliance arrangement for SMEs 79
Slide 80: Awards and certification
Awards and certification ONE PLANET LIVING CARBON TRUST REDUCING CO2 Investors in Diversity [EIKIER CUSTOMER SERVICE EXCELLENCE The Government Standard 80
Slide 81: A591 - Reconnecting Cumbria
A591 - Reconnecting Cumbria Jan 2016 9 May 2016 81
Slide 82: Kier Group plc Analyst / investor seminar July 2016
Kier Group plc Analyst / investor seminar 6 July 2016 82
Slide 83: Geoff Dobson, Suffolk County Council
Geoff Dobson Chief of Resource Management Suffolk County Council 83
Slide 84: A Suffolk County Council Perspective
A Suffolk County Council Perspective Kier Analyst and Investment Seminar 6th July 2016 Geoff Dobson Director of Resource Management
Slide 85: About Suffolk, Facts & Figures, Council Priorities
• About Suffolk • Some Facts & Figures • Council Priorities • Financial Environment • Devolution • Commercial Council • Our Relationship with Kier
Slide 86: Where is Suffolk?
x) Norwich Great -) Yarmouth (/ LJ TED Eye To London @ 4 Where is Suffolk? Dsuffolk
Slide 87: About Suffolk
About Suffolk Source: www.investinsuffolk.com
Slide 88: About Suffolk
About Suffolk Source: www.investinsuffolk.com
Slide 89: About Suffolk
About Suffolk Source: www.investinsuffolk.com
Slide 90: Sone
£489.50 @ wa ie Sone billion 6@@ 457,100 oe £430 billion at tah energy Suffolk County Council
Slide 91: Facts & Figures
Length of roads we are responsible for No Cold Calling Zones’ established Savings delivered Mlk Municipal waste Facts & Figures sent to landfill 2015/14 47% zoisne 1% u Inaun ntn nee Savings target 2016-18 Suffolk County Council
Slide 92: Facts & Figures
Schools judged to be Good | [ or Outstanding | Conservatne Labour UHI Ueral_—indepancent Green ©) Q 29 x6 80% Facts & Figures March 2014 March 2016 6.7% 6.1% 16-18 year-olds not in year-olds not in e e education, employment we & io i] or training (NEET) County Council
Slide 93: A few more Facts & Figures
A few more Facts & Figures!! Average house price 734,466 233 wo Population ! S22 tun wenn 15146 al 73,248 291 (2013) J Suffolk County Council ‘ver pepktonexpecte tegen by 200
Slide 94: Suffolk’s Priorities
Support those most vulnerable in our communities © Vand skill levels { Support the Local Enterprise Partnerships (LEPs) to increase economic growth &,) Raise educational attainment Develop Suffolk's infrastructure and maintain roads Empower local communities Suffolk’s Priorities | Suffolk County Cou
Slide 95: Suffolk’s Finances 2016-17
Suffolk’s Finances 2016-17 Where does our £492m revenue funding (excluding schools) come from? Education R levenue Services Grant Other Central Support Grant £5.9m Grants £9.7m £68.2m Public Health [ £31.6m jusiness Rates Retention £94.0m Council Tax! £283.0m Suffolk County Council
Slide 96: Suffolk’s Finances 2016-17
Suffolk’s Finances 2016-17 ...And where is it spent? Home toSchool 5. onger Transport Transport s = Corporate & Support £18.3m £12.5m Services £32.3m Other Services £6.5m Fire & Rescue Services £22.4m. Highways & = Adult Care Services ! _ » / £208.8m Transport £21.4m_—— Waste £20.5m a \ Public Healt
Slide 97: Capital Investment 2016-17
Capital Investment 2016-17 Fire Renewals Programme and Suffolk Transformation Lowestoft flood project £1m and Collaboration £3.4m Structual building maintenance £1m Suffolk Heritage Centre in Adult Social Care £0.9m Schools Organisation Review and Major Programmes £17.6m Highways and Transport Progr
Slide 98: Financing of Capital Programme 2016-17
Financing of Capital Programme 2016-17
Slide 99: Suffolk’s Budget Gap 2017-18 – 2019-20
Suffolk’s Budget Gap 2017-18 – 2019-20 • Over £200m savings made to date • Further grant reductions of 25% by 2019-20
Slide 100: Financial Challenges
Financial Challenges • Demography and Demand • Lack of Money (continual • Higher Customer expectations grant reductions) • Fragile Care Market • Capacity – Devolution • National Living Wage – Health and Social Care Integration • Academisation • Brexit • National Funding Formula for Schools – Inflati
Slide 101: Norfolk and Suffolk Devolution
Norfolk and Suffolk Devolution
Slide 102: The Devolution Deal for Norfolk and Suffolk
The Devolution Deal for Norfolk and Suffolk 30 year • £25m over 30 years - £750m for economic growth, fund as % of Combined fund infrastructure and jobs Authority (£m) GVA (2014) • £130m over five years for housing investment to deliver new Norfolk & Suffolk 750 4.23% homes The East (overall) 1350 3
Slide 103: Outsourcing, Insourcing and Divestment
Outsourcing, Insourcing and Divestment • To be a smaller and more effective Council • To put a much greater emphasis on commissioning and have much lower levels of direct service provision. • To improve services whilst spending less money • Over a three year period the Council divested eight differe
Slide 104: Commercial Council
Commercial Council Vv vertas A>=Concertus RTY CONSULTANT Making the difference Schools’ aS Suffolk chools’ uffo Sc! choice norse wo Suffolk ‘2 County Council
Slide 105: Commissioning Council, Simpler Council
Commissioning Council • 70% of our budget is now spent with suppliers • 2000+ contracts Simpler Council
Slide 106: Local Authority Procurement Process
Local Authority Procurement Process • All local authority procurement processes are governed by the Public Contracts Regulations (2015). • The Regulations contain two basic procurement processes: – Open tendering - without use of a pre-qualification questionnaire process – Restricted tendering – usi
Slide 107: Procurement Process: Assessing Service Providers
Procurement Process: Assessing Service Providers • We use the government standard pre-qualification questionnaire which contains questions on: – Legal standards compliance; – Company information; – Financial Information; – References; and, – Technical. • We set evaluation criteria against the essent
Slide 108: Suffolk Highway Services Contract
Suffolk Highway Services Contract Suffolk County Council Mission Statement: ‘We will make a positive difference for Suffolk. We are committed to working together, striving to improve and securing the best possible services’ The ‘early years’ (October 2013 to August 2015): • Great contract mobilisati
Slide 109: Ten months of change…
Ten months of change… • Punitive operational performance measures ditched • Performance management now based on achieving ‘outcomes’ • Most outcomes revolve round ‘customer satisfaction • Kier no longer acting as Suffolk County Council’s financier! • Integrated teams being formed for function-based
Slide 110: The not-too-distant future…
The not-too-distant future… • A holistic, leaner, integrated highways service • True and formally endorsed collaboration – ISO11000 • Long-term perspective (2023) taken, allowing investment • Partners in a circa £50m p.a. business • ‘Suffolk Highways’ delivering services to private clients in Suffol
Slide 111: Finally, a bit of Suffolk fun…
Finally, a bit of Suffolk fun… “Ed Sheerham!” The must-see event of the summer! The streets of Ipswich have been taken over by stunning pig sculptures as part of the highly anticipated Pigs Gone Wild interactive art trail. The 39 large pig sculptures will be auctioned to raise funds for St Elizabeth
Slide 112: Thank you…
Thank you... =" County Council
Slide 113: Scott Cooper, Service Director Highways
Scott Cooper Service Director Highways 113
Slide 114: Area 3 Team
Area 3 Team Scott Cooper Rees Evans Kevin Cotterall Service Director Contracts Director Operations Manager Highways Area 3 Area 3 114
Slide 115: Area 3 overview
Area 3 overview First contract started in 2008 Current contract: 1 November 2013 Contract period: 5 years (with possible extension to 8 years) Asset 410 employees Miles Route length 321 Road Restraint (Barrier) 569 Carriageway length 778 Bridges / Large Culverts 747 Lane length 1780 Hindhead
Slide 116: Area 3 network map
Area 3 network map OXFORDSHIRE snertora woodtane WILTSHIRE Ef SURREY (24 nr Emetigency Resource for A3) DORSET — cs engleng EIKIER aa So omc Fae mera Beging’
Slide 117: Scope of Area 3 contract
Scope of Area 3 contract Integrated network management identification of need, design, maintenance, improvement activities, incident management, event management and contingency planning on the all-purpose trunk roads and motorways All routine road and bridge maintenance works, including winter
Slide 118: Area 3 senior management
Area 3 senior management AN INTEGRATED BOARD Performance Highways England Priorities Health and Safety Safety Cost Customer Quality Asset Highways Area 3 Contract Asset Delivery Development England Service Director Manager Road building Sustainabillity Manager Director Rees Evans Simon
Slide 119: Performance (%)
Performance (%) Area 3 Position Area 2 Area 3 Area 6 Area 8 Area 9 Area 10 ASC PMF Nov-13 Dec-13 1st 1st 52 44 56 54 N/A N/A N/A N/A N/A N/A 39 46 Collaborative scores Jan-14 Feb-14 1st 1st 36 42 54 49 N/A N/A N/A N/A N/A N/A 31 30 performance framework (Nov 13 - Mar 15) Mar-14 1st 50 54 N/A N/A N
Slide 120: Asset delivery - Network control centre
Asset delivery - Network control centre Primary tasks include: Single point of contact for HA Regional Control Centre (RCC) Command and control of incidents Monitoring and deployment of incident resources Tunnel operations Network occupancy (Road Space) Stakeholder liaison, incl. HA Info
Slide 121: Selected supply chain community members
Selected supply chain community members 121
Slide 122: Area 3 team successes
Area 3 team successes Highways England Supply Chain Awards 2016 Inclusion for First Military Supply Chain Management for BS11000 Alliance Chartered Institute of Highways and Transportation (CIHT) 2016 Supply Chain Management Health and Safety BS11000 Accreditation Area 3 Alliance Mod
Slide 123: Kier Group plc Infrastructure Services Seminar 6 July 2016
Kier Group plc Infrastructure Services Seminar 6 July 2016 123