  1. Slide 1: UBS Mid & Emerging Resources Day – Delivery of a premium gold asset

    For personal use only UBS Mid & Emerging Resources Day BellevueGold– Delivery of a premium gold asset March 2024

  2. Slide 2: Disclaimers & Compliance Statements

    Disclaimers & Compliance Statements This Presentation has been prepared by Bellevue Gold Limited (Company or Bellevue) (ASX: BGL) and is authorised by the Managing Director and Chief Executive Officer of Bellevue Gold Limited. DISCLAIMER This Presentation has been prepared by the Company based on in

  3. Slide 3: Disclaimers & Compliance Statements – JORC Compliance

    Disclaimers & Compliance Statements JORC COMPLIANCE STATEMENTS It is a requirement of the ASX Listing Rules that the reporting of Ore Reserves and Mineral Resources in Australia comply with the Joint Ore Reserves Committee’s Australasian Code for Reporting of Mineral Resources and Ore Reserves (JORC

  4. Slide 4: Bellevue Gold FY24 Focus

    Bellevue Gold FY24 Focus Unlocking a globally significant high-grade, high margin, growth focused gold project in Australia  Project construction completed on time and on budget  Plant operating at design criteria of 1Mtpa for three consecutive months to end of February For personal use only Commi

  5. Slide 5: Board and management – a proven team of mine builders

    Board and management – a proven team of mine builders Darren Stralow Mining Engineer  >20yrs' experience Managing Director  Previous role of Chief Development Officer and GM of Operations Investment Banking &CEO at Northern Star Resources (NST) For personal use only  >40yrs' experience  Led inte

  6. Slide 6: Ramp up on track - 1Mtpa rate achieved weeks from start

    Ramp up on track- 1Mtpa rate achieved 6 weeks from start All key drivers proceeding well with key metrics ramping up across mining & processing   Three consecutive months achieved nameplate throughput capacity of 1Mtpa  For personal use only  Processed head grade continues to increase with high-

  7. Slide 7: 2H FY2024 Guidance of 75k-85koz

    2H 2024FY Guidance of 75k-85koz Plant achieving nameplate 1Mtpa run rate Underground high-grade mining ramping up  Strengthening Balance Sheet For personal use only  Liquidity $48.5 million (as at 31 Dec 2023), limited construction capital * remaining; all creditors up to date on standard payment

  8. Slide 8: Grade control drilling; high-grade lodes

    Grade control drilling; high-grade lodes Deacon MiningArea 14.0m @ 49.4 g/t gold 10.9m @ 20.5 g/t gold Underground areas ramping up into five independent mining areas, 10.8m @ 66.8 g/t gold 8.9m @ 71.1 g/t gold significantly decreasing risk across the deposit 8.4m @ 50.1 g/t gold 7.5m @ 49.8 g/t gol

  9. Slide 9: Multiple independent mining areas in development

    Multiple independent mining areas in development Deacon Main 1058 200 Bellevue 1095 200  Five independent mining areas now in ore development with multiple development levels  Stoping underway at Upper Armand, Lower For personal use only Armand, Bellevue South, Deacon and 129.0g/t Marceline 110.2g

  10. Slide 10: Deacon high-grade shoot component identified

    Deacon high-grade shoot component identified  New ‘High-grade shoot ’ identified along 1.4Moz Deacon lode through underground grade control drilling (in red) and remains open down plunge  High-grade shoot analogous to zones in historic Bellevue lode where ~800koz were mined at 13g/t gold between 1

  11. Slide 11: Deacon high-grade shoot component identified

    Deacon high-grade shoot component identified  New ‘High-grade shoot’ identified along 1.4Moz Deacon lode through infill drilling  Potential for a further six high-grade shoot areas identified along Deacon lode For personal use only Grade control drilling identifying six other potential high-grade

  12. Slide 12: Stoping ramping up; excellent performance to date

    Stoping ramping up; excellent performance to date  Ramp-up continues with >30 stopes completed, majority from Upper Armand area  Cavity monitoring of voids to date highlight favourable stoping conditions For personal use only  Minimum widths achieved  Target dilution achieving better than design

  13. Slide 13: Growth Story

    For personal use only Growth Story • Exceptional grade in recent grade control infill drilling • Underground development creates platform for further exploration • Deposit remains open along strike, at depth and down plunge • Plant designed for increased throughput

  14. Slide 14: Vrify 3D presentation

    Vrify 3D presentation – play here For personal use only https://vrify.com/decks/15208

  15. Slide 15: Exploiting the competitive exploration advantage

    Exploiting the competitive exploration advantage  Conductive mineralisation drives more efficient discovery and target appraisal  Several areas highlight the potential for future Resource growth with further drilling outside of known Resource areas For personal use only Fracture Fill Sulphide Netw

  16. Slide 16: 15km of development creates platform for exploration growth

    15km of development creates platform for exploration growth  Gentle southerly plunge to the south associated with fold hinge plunge and high-grade, high pyrrhotite ore  Completely OPEN and untested to south except for historic 250m spaced drilling  Every hole on the 250m spacing has significant g

  17. Slide 17: Deep holes confirm 3.1Moz system is OPEN

    Deep holes confirm 3.1Moz system is OPEN Bellevue Repeatedsystemopenatdepth Shear 1.4Moz For personal use only  Parallel structure at depth in deep EIS funded drilling  1.6m @ 9.3 g/t gold in new structure at Deacon depth Shear 1.4Moz  Flat Viago analogue targets at Lucien  Progress in undergrou

  18. Slide 18: Future proof - Designed for growth >1.0Mtpa

    Future proof- Designed for growth >1.0Mtpa ROMPad Lab Screen deck Oversized Crushing Fine Ore Bin (FOB) Circuit (1.7 Mtpa) For personal use only Ball Mill Current mill achieving 1.0Mtpa Workshop Thickeners CIL Tanks Future additional CIL capacity Gold Room  Simple throughput increase to 1.2Mtpa – n

  19. Slide 19: Sustainability is core to BGL's vision and purpose

    Sustainability is core to BGL’s vision and purpose Partnership with Zenith to deliver up to 80% of green energy supply from solar and wind power Renewable Energy Progress on the 29MWh Battery Energy Storage  Construction on track for sector leading 89.7 MW hybrid power station consisting of: 24 MW

  20. Slide 20: Investment highlights

    Investment highlights For personal use only World class Resource Production ESG Leader Re-Rate potential Growth Growth Potential Forecast to be a Current underground 1Mtpa plant Project is forecast Significant potential for top-20 Australian development creates designed for to have the lowest a valu

  21. Slide 21: Appendix

    For personal use only Appendix

  22. Slide 22: Mineral Resource and Ore Reserve Estimates

    Mineral Resource and Ore Reserve Estimates INDEPENDENT JORC 2012 RESERVE ESTIMATES FOR THE BELLEVUE GOLD PROJECT (Current June 2022) Tonnes Grade Contained Ounces Ore Reserve (Mt) (g/t (Moz) Au) Probable High Grade Underground Ore Reserve 4.5 7.9 1.14 For personal use only Probable Low Grade Undergr