    Investor Presentation August 2025 | TSX: ERO | NYSE: ERO

  2. Slide 2: Disclaimer: Forward Looking Information and Statements

    Disclaimer Caution Regarding Forward Looking Information and Statements This presentation contains “forward-looking statements” within the meaning of the United States Private Securities Litigation Reform Act of 1995 and “forward-looking information” within the meaning of applicable Canadian securit

  3. Slide 3: Disclaimer: General

    Disclaimer General Scientific and technical information contained in this presentation has been reviewed, verified and approved by Mr. Cid Gonçalves Monteiro Filho, SME RM (04317974), MAIG (No. 8444), FAusIMM (No. 329148), and Resource Manager of the Company, who is a “qualified person” within the m

  4. Slide 4: Company Overview & Strategy

    COPPER Company Overview & Strategy

  5. Slide 5: High-Margin, High-Growth, Diversified Copper Producer

    Tucumã High-Margin, High-Growth, New Production Pará State Diversified Copper Producer Furnas(1) Advanced Stage Pará State Brazil-Focused Copper Portfolio With Meaningful Gold Production Xavantina Production Mato Grosso State Significant Near-Term Growth As the Tucumã Operation ramps up to nameplate

  6. Slide 6: Proven Growth Since IPO, Well Positioned for the Future

    Proven Growth Since IPO, Well Positioned for the Future Copper Production Growth 22% (tonnes) 62% 16.2 90.0 126% 28.3 73.8 25.4 45.5 20.1 2017A 2021A 2025E 2026E-2027E Note: Production for 2025 based on the midpoint of the Company’s updated guidance range included in its earnings release dated July

  7. Slide 7: Executing on Growth Strategy

    Executing on Growth Strategy The Company is expanding its growth portfolio with plans to earn a 60% interest in the Furnas Copper-Gold Project(1) Near-Term Longer-Term Recent Achievements (Within 3 Years) (3+ Years) Caraíba In-Mine Exploration (Targeting extension of mine life) Caraíba Mill Expansio

  8. Slide 8: Poised for Significant Near-Term EBITDA Expansion

    Poised for Significant Near-Term EBITDA Expansion Copper Production Growth & EBITDA Margin 65% 60% Antofagasta Ero Copper 55% 2026E EBITDA Margin 50% Lundin Mining Hudbay Minerals Capstone Mining 45% Sandfire Resources Ero is well-positioned Freeport-McMoRan Teck Taseko due to significant 40% First

  9. Slide 9: Our Operations

    WERO COPPER Our Operations

  10. Slide 10: Caraíba: High-Margin Flagship Copper Operation

    Caraíba: High-Margin Flagship Copper Operation • Asset Overview ▪ High-grade, high-margin copper operation o Located in Bahia State, 90 km SE of Petrolina o Fully integrated mining and processing complex with 45-year operating history o Two underground mines: Pilar and Vermelhos o One open pit mine:

  11. Slide 11: New External Shaft Project

    New External Shaft Project Shaft Headframe Permanent Rock & Personnel Winder Building Stage Winder Building Engineering & Admin. 11

  12. Slide 12: Tucumã: High-Margin Operation Delivering Portfolio Growth

    Tucumã: High-Margin Operation Delivering Portfolio Growth • Asset Overview ▪ Open pit copper operation o Located in Pará State, ~40 km SW of Tucumã o Commercial production effective July 1, 2025 ▪ Attractive operating margins o 2025 C1 cash costs expected to be $1.10 to $1.30 per pound of copper pro

  13. Slide 13: Tucumã Plant

    Tucuma Plant eS January 2025 ] 13

  14. Slide 14: Xavantina: High-Grade, Low-Cost Gold Operation

    Xavantina: High-Grade, Low-Cost Gold Operation Asset Overview ▪ High-grade, high-margin underground gold mine and processing facility o Located in Mato Grosso State, ~18km NW of Nova Xavantina o Among the highest-grade gold mines in South America Catalysts Production Profile(1) ▪ Exploration / Plant

  15. Slide 15: Long-Term Growth

    COPPER Long-Term Growth

  16. Slide 16: Furnas: Large, Highly Prospective IOCG Project

    Furnas: Large, Highly Prospective IOCG Project High-grade underground copper-gold project with initial Indicated and Inferred Mineral Resource estimates of 35 and 61 million tonnes, respectively ▪ To earn a 60% interest in Furnas(1), Ero will fund three phases of work over a 5-year earn-in period ▪

  17. Slide 17: Furnas: High-Grade Mineral Resource Estimate

    Furnas: High-Grade Mineral Resource Estimate The initial mineral resource estimate for Furnas supports the potential for a large-scale, high-grade underground mine Initial Mineral Resource Estimate and Cut-Off Grade Sensitivity(1) Cut-Off Grade Grade Contained Metal Phase 1 Drill Program Tonnes Cate

  18. Slide 18: Financial & Environmental Stewardship

    Financial & Environmental Stewardship

  19. Slide 19: Strong Balance Sheet and Liquidity Position

    Strong Balance Sheet and Liquidity Position $113 million 2.1x Total Liquidity* at Jun. 30, 2025 Net Debt Leverage Ratio Total Debt $621 Net Debt $552 $45M $113M LTM Adj. EBITDA $267 $68M Total Debt Leverage Ratio 2.3x Net Debt Leverage Ratio 2.1x Cash & Cash Equivalents Sr. Secured Revolving Credit

  20. Slide 20: Brazil: Global Leader in Use of Renewable Energy

    Brazil: Global Leader in Use of Renewable Energy “Brazil’s electricity matrix is one of the cleanest in the world and Brazil is committed to continuing its support for renewable energy projects.” - International Trade Administration, U.S. Dept. of Commerce Share of Electricity Production from Renewa

  21. Slide 21: Strong Sustainability Focus

    Strong Sustainability Focus Brazil’s global leadership in the use of renewable energy affords Ero a unique competitive advantage as end users increasingly demand low carbon-intensity minerals ESG Ratings GHG Copper Intensity Curve(1) - 2023 “A” ranking with performance in top 33% tCO2e / t Copper eq

  22. Slide 22: Guidance and Production Outlook

    Guidance and Production Outlook

  23. Slide 23: 2025 Guidance

    2025 Guidance Caraíba Tucumã Xavantina Production 37.5 – 42.5 kt Cu 30.0 – 37.5 kt Cu 40 – 50 koz Au (Original: 37.5 – 42.5 kt Cu) (Original: 50 – 60 koz Au) $850 - $1,000 / oz (Original: $650 – $800 / oz) $1.10 - $1.30 $2.15 – $2.35 / lb Au C1 Cash Cost Operating Costs (Original: $1.05 – $1.25 / lb

  24. Slide 24: Business Summary

    COPPER Business Summary

  25. Slide 25: Building A Brazilian Copper-Gold Champion

    Building A Brazilian Copper-Gold Champion High-Margin, Brazil-Focused Copper Producer Significant Near-Term Production Growth Attractive Long-Term Development Pipeline Robust Balance Sheet Well-Positioned to Fund Portfolio Opportunities Strong Sustainability Focus 25

  26. Slide 26: Appendix

    WERO COPPER

  27. Slide 27: Ownership Structure

    Ownership Structure Shareholder Distribution Blue-Chip Institutional Shareholders Top 5 Institutional Shareholders 6.2% T. Rowe Price (all affiliates) 17.5% 16.4% Fidelity (all affiliates) 14.8% GMT Capital 6.7% 11.7% Jennison Associates 5.1% 47.9% Global X Investments 3.9% Total 47.9% 17.9% Ero’s b

  28. Slide 28: Caraíba Operations

    Caraíba Operations Tonnes Processed (kt) Grade Processed (%) Cu Production (kt) 958 900 9.9 1.30 1.27 9.2 792 1.20 1.18 8.9 8.6 720 693 1.03 7.4 Q2/24 Q3/24 Q4/24 Q1/25 Q2/25 Q2/24 Q3/24 Q4/24 Q1/25 Q2/25 Q2/24 Q3/24 Q4/24 Q1/25 Q2/25 ▪ Copper production increased approximately 25% QoQ, with a7% C1

  29. Slide 29: Tucumã Operation

    Tucumã Operation Tonnes Processed (kt) Grade Processed (%) Cu Production (kt) 2.17 2.18 6.4 419 1.74 5.1 294 4.3 223 1.00 111 0.8 Q3/24 Q4/24 Q1/25 Q2/25 Q3/24 Q4/24 Q1/25 Q2/25 Q3/24 Q4/24 Q1/25 Q2/25 ▪ Copper production increased approximately 25% QoQ. ▪ Ramp-up progressed during the quarter, supp

  30. Slide 30: Xavantina Operations

    Xavantina Operations Tonnes Processed (kt) Grade Processed (gpt) Au Production (koz) 40 42 16.6 38 33 13.5 14.00 26 11.41 11.18 8.9 7.7 6.6 6.87 7.11 Q2/24 Q3/24 Q4/24 Q1/25 Q2/25 Q2/24 Q3/24 Q4/24 Q1/25 Q2/25 Q2/24 Q3/24 Q4/24 Q1/25 Q2/25 C1 Cash Costs* ($/oz produced) AISC* ($/oz produced) 1,100 1

  31. Slide 31: Key Financial Metrics

    Key Financial Metrics Cash Flow from Operations Adjusted EBITDA* (US$M) (US$M) $90 $83 $65 $62 $63 $61 $59 $53 $52 $15 Q2/24 Q3/24 Q4/24 Q1/25 Q2/25 Q2/24 Q3/24 Q4/24 Q1/25 Q2/25 Adjusted Net Income* Adjusted Net Income* (US$M) (US$ per diluted share) $0.46 $48 $0.35 $36 $0.27 $28 $0.18 $0.17 $19 $1

  32. Slide 32: Furnas: Geology and Plan Map

    Furnas: Geology and Plan Map Exploration efforts are focused on two discrete high-grade zones identified within the overall mineralized body, known as the SE and NW Zones, that extend over a combined strike length of ~5 km Note: For more information, please refer to the Company’s press release dated

  33. Slide 33: Furnas: Cross sections within the high-grade SE Zone

    Furnas: Cross sections within the high-grade SE Zone Phase 1 Drilling Highlights ▪ FURN-DD-00284: 105 meters at 1.17% copper and 0.77 grams per tonne ("gpt") gold (1.54% CuEq1), including 63 meters at 1.30% copper and 1.13 gpt gold (1.84% CuEq1), drilled in the Southeast zone at the limit of the pre

  34. Slide 34: Caraíba Operations Reserves & Resources

    Caraíba Operations Reserves & Resources Tonnes (kt) Grade (Cu%) Contained Cu (kt) Mineral Reserves (Underground) Proven 14,164 1.15% 163 Probable 16,710 1.57% 263 Proven & Probable 30,874 1.38% 426 Mineral Resources (Underground) Measured 53,976 1.08% 581 Indicated 47,558 1.17% 558 Measured & Indica

  35. Slide 35: Xavantina Operations Reserves & Resources

    Xavantina Operations Reserves & Resources Tonnes (kt) Grade (gpt Au) Contained Au (oz) Mineral Reserves Proven, Santo Antônio Vein 223 9.68 69.4 Proven, Matinha Vein - - - Total Proven 223 9.68 69.4 Probable, Santo Antonio Vein 1,155 9.76 362.3 Probable, Matinha Vein 93 9.20 27.5 Total Probable 1,24

  36. Slide 36: Tucumã Operation Reserves & Resources

    Tucumã Operation Reserves & Resources Tonnes (kt) Grade (Cu%) Contained Cu (kt) Mineral Reserves Proven 30,674 0.89 273.2 Probable 12,378 0.67 83.4 Proven & Probable 43,052 0.83 356.6 Mineral Resources (Pit Constrained) Measured (High-Grade) 7,117 2.16 153.6 Indicated (High-Grade) 1,661 2.27 37.6 Me

  37. Slide 37: Additional Information

    Additional Information Caraíba Operations Mineral Reserves Notes: 1. Effective Date of December 31, 2024, accounting for drilling activities and mining depletion at the Caraíba Operations since the September 30, 2022 effective date of the Mineral Resource and Mineral Reserve estimates contained in t

  38. Slide 38: Additional Information

    Additional Information Tucumã Operation Mineral Reserves Notes: 1. Effective Date of August 31, 2021. 2. Mineral reserves included within stated mineral resources. All figures have been rounded to the relative accuracy of the estimates. Summed amounts may not add due to rounding. High-grade and low-

  39. Slide 39: Additional Information

    Additional Information Furnas Copper-Gold Project Mineral Resources Notes: 1. Effective Date of June 30, 2024, and presented on a 100% ownership basis. 2. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. Summed amounts may not add due to rounding. 3. Miner

  40. Slide 40: Farooq Hamed, VP, Investor Relations