Slide 1: Tier-1 Copper Discoveries in Peru
Tier-1 Copper Discoveries in Peru CORPORATE PRESENTATION TSX-V: ECU OTCQX: EMTRF BVL: ECU September 2026
Slide 2: Forward-Looking and Cautionary Statements
Forward-Looking and Cautionary Statements Certain statements in this presentation constitute “forward-looking information” within the meaning of applicable securities laws. Forward-looking information relates to future events, future performance and statements that are not historical facts. Forward-
Slide 3: At a Glance
AT A GLANCE A copper-focused Element 29 (E29) is advancing the Elida copper deposit and Flor de Cobre project – growing copper resources and expanding mineralization across multiple untested explorer building Tier-1 targets. The flagship Elida property has returned well-mineralized intercepts from r
Slide 4: Peru: A Proven Mining Jurisdiction
Peru: A Proven Mining Jurisdiction TOP-TIER COPPER PRODUCTION IN A STABLE, INVESTOR-FRIENDLY ECONOMY 3rd 60% Largest Cu Producer • 2024 of Peru’s Exports are from Mining Yanacocha 2.76 Mtpa output Mining contributes ~10% of GDP Antamina (7th) ▪ Two world Top-10 Cu mines: Cerro Verde (3rd), Antamina
Slide 5: Four Copper Projects Across Peru's Premier Copper Belts
Four Copper Projects Across Peru’s Premier Copper Belts 25,000+ HECTARES ANCHORED BY THE ELIDA PORPHYRY DEPOSIT AND THREE EARLIER-STAGE DISCOVERIES E29 holds 27,000+ hectares of titled concessions across the Tertiary magmatic arc and the Southern Peru Copper Belt - anchored by the flagship Elida por
Slide 6: Elida
01 SECTION ONE Elida. The flagship porphyry Cu-Mo-Ag deposit – well-mineralized, low-strip, low-arsenic, sited at ~1,600 m elevation with direct access to roads, power, water and deep-water ports.
Slide 7: Near Everything That Matters
Near Everything That Matters LOCATION ADVANTAGES Low Elevation ~1,600m low elevation Transportation Routes 75 km to the coast by road Electrical Grid Adjacent to electrical grids Hydroelectric Station 45 MW clean power, 15 km from the project Deep-Water Ports 2 ports, Chancay and Antamina, ~150 km f
Slide 8: Elida Copper Project
Elida Copper Project 20,900 HA TITLED CONCESSIONS TSX-V: ECU OTCQX: EMTRF BVL: ECU 8
Slide 9: Built on Favourable Fundamentals
Built on Favourable Fundamentals STRATEGIC ADVANTAGES (Isometric View – Looking West) 01 Higher-grade starter pit > 0.5% Cu in the starter shell – supports an early, higher- margin production window 02 Low strip ratio 0.74:1 waste-to-ore – minimal pre-strip and lower mining cost per tonne milled 03
Slide 10: Elida Copper Project Inferred Mineral Resource Estimate
(Isometric View – Looking SE) Elida Copper Project Notes: INFERRED MINERAL RESOURCE ESTIMATE 1. Mineral Resource Estimate information is available in “NI 43-101 Technical Report, Mineral Resource Estimation of the Elida Porphyry Copper Project in Peru” dated September 20, 2022, and prepared in accor
Slide 11: Three Objectives, One Campaign
Three Objectives, One Campaign PHASE 3 DRILLING PROGRAM Infill the pit-constrained resource A Tighten drill spacing across gaps in the pit shell – targeting an uplift in overall Cu-Mo-Ag grades Drill outside the pit shell to 1,000 m+ B Continue stepping out at depth, while remaining inside the highe
Slide 12: A 6,000m Hydrothermal Footprint, Open North
A 6,000m Hydrothermal Footprint, Open North MT GEOPHYSICAL SURVEY (Isometric View – Looking North) ▪ MT 3D inversion model depth slice at -400 m below surface. ▪ Outlines a >6,000 m low-resistivity trend associated with hydrothermally altered volcanoclastic and volcano-sedimentary rocks. ▪ Low-resis
Slide 13: ELID035 and ELID037, In Section
ELID035 and ELID037, In Section SECTION VIEW Observation Vertical section through ELID035 and ELID037 correlates the MT inversion response with porphyry Cu-Mo-Ag mineralization at depth Implication Continuity below pit shell TSX-V: ECU OTCQX: EMTRF BVL: ECU 13
Slide 14: Project Pipeline
02 SECTION TWO Project Pipeline. Three earlier-stage Cu-Mo-(Au-Ag) targets along the Tertiary arc and Southern Peru Copper Belt – with permits in hand and discovery-scale alteration footprints.
Slide 15: Copper Project Pipeline
Copper Project Pipeline EXTENSION OF THE TERTIARY ARC-NORTH Lower Elevation (~3,000m) Transportation Routes Electrical Grid Ports Mining Services Skilled Workforce TSX-V: ECU OTCQX: EMTRF BVL: ECU 15
Slide 16: Flor de Cobre Project
Flor de Cobre Project FLOR DE COBRE PROJECT Atravesado – porphyry Cu-Mo prospect. ▪ Geophysical response coincides with anomalous Cu geochemistry, potassic alteration, and A-type quartz veining. ▪ Historical drilling by Anglo American near the edge of the main target area. ▪ Target is just 1.5 km to
Slide 17: Paka Project
Paka Project PORPHYRY CU-ZN-(AU-AG) SKARN A 4.3 × 1.3 km alteration footprint. ▪ 2,500 ha of titled concessions along the northwest extension of Southern Peru Copper Belt. ▪ 4.3 x 1.3 km porphyry-skarn related hydrothermal alteration footprint interpreted as Paleocene or younger age (Tertiary magmat
Slide 18: Pahuay Project
Pahuay Project PORPHYRY CU-MO-(AG) SKARN Porphyry-skarn potential at depth. ▪ 1,000 ha titled concession located in the northwest extension of the Southern Peru Copper Belt. ▪ 2.8 x 1.7 km porphyry-related hydrothermal alteration footprint. A vein stockwork ▪ Upper potassic zone exposed leaving pote
Slide 19: Company
03 SECTION THREE Company. Team, capital, and the standards behind the work.
Slide 20: Board & Management
Board & Management LEADERSHIP TEAM Brad Mercer Richard Osmond Randy Smallwood Patrick Elliot Chet Idziszek P.Geo. P.Geo., ICD.D CHAIRMAN OF THE BOARD PRESIDENT, CEO AND DI RECTOR DI RECTOR, AUDIT COMMITTEE DI RECTOR, COMPENSATIO N DI RECTOR CHAIR COMMITTEE CHAIR Retired COO of Capstone Founder, Non-
Slide 21: Capital Structure – Long Term Backing
Capital Structure – Long Term Backing Shares Issued & Outstanding 196.3 million Fully Diluted 229.6 million Options & RSU/DSU 14.1 million Total Warrants 19.2 million • 13.0 million warrants (August 2027, $0.50) • 6.2 million warrants (August 2028, $0.70) Notable Shareholders: Acasta Partners, Bromm
Slide 22: Responsible Exploration, By Design
Responsible Exploration, By Design SUSTAINABILITY Sustainability at Element 29 means best practice in ethical conduct, health and safety, environmental management, community engagement and human rights 01 • ETHICS Monitoring baseline water quality and minimizing our environmental footprint by recycl
Slide 23: Catalyst-Driven 2026/2027 Work Plans
Catalyst-Driven 2026/2027 Work Plans EXPANDING COPPER RESOURCES Completed Planned 2026 2027 Catalysts Q2 Q3 Q4 Q1 12,000 m Drilling Program Metallurgical Test Work ELIDA Updated Drill Permit - DIA (5-Year) Mineral Resource Update Geophysics Community Access Agreement Geological Field Program FLOR de
Slide 24: Contact
Contact RICHARD OSMOND DYLAN BERG President & CEO VP IR 1-604-805-0314 1-604-319-6180 rosmond@e29copper.com dberg@e29copper.com www.e29copper.com – Follow us X – Connect with us on LinkedIn – Watch us on YouTube