Antipa Minerals Limited · ASX:AZY

Antipa Minerals — Corporate Update (June 2011)

19 slides from Antipa Minerals's corporate update, June 2011

  1. Slide 1: Antipa Minerals Review

    OW ANTIPAMINERALS ANTIPA MINERALS REVIEW JUNE 2011

  2. Slide 2: Disclaimer and Important Information

    Disclaimer and Important Information Forward-Looking Statements  This document may include forward-looking statements. Forward-looking statements include, but are not limited to, statements concerning Antipa Mineral Ltd’s planned exploration program and other statements that are not historical fact

  3. Slide 3: Antipa Minerals Snapshot

    Antipa Minerals Snapshot Objective to build an international minerals group  Through exploitation of large mineral projects to provide maximum leverage to shareholders Quality team provides a competitive advantage  Former LionOre executives with proven track record Large scale project in a Provinc

  4. Slide 4: Antipa Minerals Snapshot

    Antipa Minerals Snapshot Company already delivering  Citadel Project VTEM Survey commenced in first week of June 2011  Drilling programme contracted and expected to commence in August 2011  Further technical studies support interpretation of previous Magnum drilling being sub-parallel to west dip

  5. Slide 5: What's New/News Flow

    What’s New/News Flow Corporate  Listed on ASX on 19 April 2011 (ASX: AZY/AZYO)  Total funds available comprise Cash in Bank at 31 May 2011 of A$9 million  Issued Share capital as at 31 May 2011 Shares Options Listed 50,000,000 25,000,000 Restricted to 20 April 2013 21,000,400 16,500,000 Restricte

  6. Slide 6: Antipa Projects Overview

    Antipa Projects Overview Antipa a major Paterson Province player  Owner of 1,714 km2 of granted exploration tenure, the largest holding in the Paterson Province - Citadel Project  Tenement applications over an additional 1,253 km2 of prospective ground – North Telfer Project  Total tenement and a

  7. Slide 7: Citadel Project – 2011 Exploration Objectives

    Citadel Project – 2011 Exploration Objectives Aggressive exploration programme for 2011 – Four main objectives  Explore the strike and depth extensions of the high-grade gold-copper Magnum Deposit  Complete first-pass delineation drilling at Magnum with the objective of delivering a maiden Mineral

  8. Slide 8: Citadel Project - Exploration Activities since Listing

    Citadel Project - Exploration Activities since Listing Detailed drillcore inspection  Further detailed inspection of existing Magnum drillcore confirming the potential for the discovery of additional mineralised structures at Magnum Extensional Magnum opportunities identified  Identification of ex

  9. Slide 9: Citadel Project – VTEM Survey

    Citadel Project – VTEM Survey VTEM Heliborne Survey to explore to new depths  Cutting-edge exploration technology; VTEM is the world’s highest resolution and most superior signal-to-noise ratio airborne electromagnetic system  VTEM Survey is expected to  Supersede BHP’s 1994 fixed-wing EM (1970’s

  10. Slide 10: Magnum gold-copper Deposit - Previous Interpretation

    Citadel Project - Magnum gold-copper Deposit - Previous Interpretation Previous Magnum Exploration  Previous interpretation built upon steep east dipping lode structures  Ignores frequent occurrence of moderate to steep west dipping lodes sub-parallel to drilling  Largely ignores contact parallel

  11. Slide 11: Magnum gold-copper Deposit - Opportunity

    Citadel Project - Magnum gold-copper Deposit - Opportunity 2011 Magnum Exploration  Acknowledges drilling sub-parallel (moderate to steep west dipping) lode orientations  Acknowledges contact parallel zones of breccia mineralisation and potential for the sediments to host mineralisation  Tests ex

  12. Slide 12: Magnum Deposit – 2011 Exploration Programme

    Citadel Project - Magnum Deposit – 2011 Exploration Programme Magnum Drilling Programme  “Central Zone” delineation and proximal extensional (internal + along strike) diamond and RC drilling = 9,000 m from 8 x 50 to 100 m spaced traverses for 25 drillholes depth range between 150 to 600 m  Include

  13. Slide 13: Magnum – Geology Plan

    Citadel Project - Magnum – Geology Plan Showing 2011 Drilling Target Areas Northern Strike Extensional Target Area 2,400 metres of RC Drilling 2 kilometres Mineralised Central Zone Target Area Trends 9,000 metres of DD and RC Drilling Southern Strike Extensional Target Area 1,600 metres of RC Drilli

  14. Slide 14: Magnum - Long Projection Showing 2011 Drilling Target Areas

    Citadel Project - Magnum - Long Projection Showing 2011 Drilling Target Areas 700 metres 900 metres 600 metres Southern Strike Extensions Central Zone Northern Strike Extensions Depth Extensions Mineralised Trend Notes: Drillhole intersections “Au eq” is Gold equivalent value = Au (g/t) + %Cu x (91.

  15. Slide 15: Citadel Project – Magnum Dome and Regional Exploration

    Citadel Project – Magnum Dome and Regional Exploration ANK-E target located 7 km southeast of Magnum  Located on a major fault or shear zone with cross-cutting structures  Coincident magnetic anomalism  Nearby EM anomaly generated by Geoscience Australia’s 2008 Fugro TEMPEST™ airborne electromagn

  16. Slide 16: Citadel Project – Magnum Dome and Regional Exploration

    Citadel Project – Magnum Dome and Regional Exploration ANK-H T4 ANK-E Antipa Minerals Review June 2011 16

  17. Slide 17: North Telfer Project

    North Telfer Project North Telfer Project Acquisition  Antipa has applied for additional exploration licences covering some 1,253 km2 of land adjoining its current Citadel Project landholding and extending south to within 20 kms of the Telfer Mine  Antipa has entered into an agreement with Paladin

  18. Slide 18: North Telfer Project

    North Telfer Project North Telfer Project highlights  Abuts the southern boundary of the Citadel Project  Extends contiguous tenement holding from 55 to 120 km north to south and to within 25 km of the world-class Telfer gold-copper and O’Callaghans Tungsten-base metal deposits  Greater than 95%

  19. Slide 19: Antipa Minerals – Board Members

    Antipa Minerals – Board Members Stephen Power, LLB - Non-Executive Chairman • Commercial lawyer with 25 years experience advising participants in the resources industry in Australia and overseas including Africa and South America. Currently Principal of Napier Legal Lawyers and a director of Karoon

Antipa Minerals — Corporate Update (June 2011) on 6ix