  1. Slide 1: Corporate Presentation: Growth & Returns

    CORPORATE PRESENTATION CENTAMIN AZ GROWTH &RETURNS AE MILLION OUNCES SEPTEMBER 2022

  2. Slide 2: Disclaimers

    DISCLAIMERS THIS PRESENTATION AND ITS CONTENTS ARE NOT FOR RELEASE, PUBLICATION OR DISTRIBUTION, IN WHOLE OR IN PART, DIRECTLY OR INDIRECTLY, IN OR INTO OR FROM ANY JURISDICTION WHERE SUCH DISTRIBUTION IS UNLAWFUL This presentation has been prepared by Centamin Plc ympany”) solely for information an

  3. Slide 3: Generating Significant Returns for Our Stakeholders

    GENERATING SIGNIFICANT RETURNS FOR OUR STAKEHOLDERS 5Moz produced since first production in 2009 Total workforce of 3,795 people in Egypt F IVE 94% of Sukari workforce are Egyptian Nationals M | LL| 0 Ky 70% of leadership roles held by Egyptians 0 T N fF ES 61% of procurement through local supply ch

  4. Slide 4: Our Portfolio

    OUR PORTFOLIO AN INTEGRATED PIPELINE DELIVERING GROWTH FROM A STRONG RESOURCE BASE 12.1Mo0oz 8.1Moz Measured & Indicated! Inferred SUKARI , DOROPO ) | ABC PROJECT GOLD MINE . PROJECT Sf Cote d'Ivoire Egypt (160km2) Cote d'Ivoire (2,329km?) (1,144km?) Sukari Orebody PFS underway Fieldwork underway Su

  5. Slide 5: Production (Koz) and H2-2022 Deliverables

    Production (Koz) ©) H2-2022 DELIVERABLES SOLAR PLANT COMMISSIONING 70 SUKARI UNDERGROUND EXPANSION STUDY CAPITAL STRUCTURE REVIEW 00 GRID POWER CONNECTION STUDY SUKARI RESOURCE RESERVE UPDATE 250 DOROPO (COTE D'IVOIRE) PFS FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31 FY32 FY33 @Sukari Interim C

  6. Slide 6: Sukari Value Maximisation

    CORPORATE PRESENTATION SUKARI VALUE MAXIMISATION SEPTEMBER 2022 CENTAMIN AZ FIVE MILLION OUNCES

  7. Slide 7: 2022 Drill Highlights

    2022 DRILL HIGHLIGHTS Bi ZMN HORUS DEEPS _ CLEOPATRA | J ! ark - 54m at 15.1g/t Au — FINAL OPEN PIT SHELL| PTAH * 23m at 7.2g/t Au AMUN ° 17m at 9.6g/t Au = HORUS a, * 8.5m at 7.6g/t Au HORUS DEEPS LEGEND ; BAST Measured SE * 10m at 64g/t Au Indicated = Inferred * 4.5m at 267g/t Au ™ Conceptual ™ Un

  8. Slide 8: Conceptual Plan Under Development

    CONCEPTUAL PLAN UNDER DEVELOPMENT RESULTS DUE IN Q3 2022 HAULAGE OPTIMIZATION Investigating twin declines, passing bays and portals from the open pit Fleet utilisation and capacity CONCEPTUAL MINE PLANNING SENSITIVITY AND SCENARIO TESTING OF PIT PORTALS . Portal RL: 910 Refining sequencing and sched

  9. Slide 9: Capex (US$M)

    250 200 a oS CAPEX (US$M) 3 8 50 US$25m Deferred capex Fy21 FY22e m Sustaining capex (US$m) FY23e Growth capex (US$m) FY24e - oabl| FY22 GROWTH CAPEX US$125.5M FY21 deferred spend Paste plant: US$10m Solar farm: US$15m TOTAL US$25m Contractor waste-stripping: US$73m UG Equipment US$10.5m Paste plant

  10. Slide 10: The Challenge of Cost Inflation

    THE CHALLENGE OF COST INFLATION RECOGNISING INFLATION EARLY WE MAINTAIN COST GUIDANCE ALBEIT AT THE UPPER END OF THE GUIDANCE RANGE GROUP COST BREAKDOWN 336 CONSUMABLES $M +1% Versus H2-21 224 CONSUMABLES USAGE AND CONTRACT SAVINGS * Ongoing optimisation of consumables and reagents in the process pl

  11. Slide 11: TMM (kt) and Underground Capital Projects

    oO TMM (kt) UNDERGROUND CAPITAL PROJECTS H1 2022: $13M a — canes CONTRACTOR FLEET AND INVENTORY of PURCHASED 22% COST DEPOSITS MADE FOR OWNER FLEET IMPROVEMENT Versus H2-21 H2 2022: $12M 21 Q2-21 Q3-21 Q4-21 Q1-22 Q2.22 OWNER FLEET PURCHASES VENTILATION UPGRADES % 6% PRODUCTIVITY IMPROVEMENT Versus

  12. Slide 12: Delivering Operational Productivity

    DELIVERING OPERATIONAL PRODUCTIVITY OPERATING MORE EFFICIENTLY OPTIMISING FLEET UTILISATION Y) High performance truck trays installed Y) Haul road maintenance improvements ~Y) Cycle time optimization CENTAMIN 32 OWNER TRUCK PRODUCTIVITY (tonnes per hour) & Aug 2020 400 ° June 2022 +12% Truck Perform

  13. Slide 13: Solar Power Plant Q3 2022

    SOLAR POWER PLANT Q3 2022 DECARBONISATION OF POWER GENERATION 36MWpe Solar Farm 7.5MW battery-energy storage system 85-hectare site * 25% of annual power generation ¢ Up to 22 million litres of diesel saved annually » Reduced exposure to fuel price volatility * Reduced transport to and from Sukari *

  14. Slide 14: Grid Power Study Q4 2022

    GRID POWER STUDY Q4 2022 POTENTIAL TO FURTHER THE DECARBONISATION OF SUKARI’S POWER GENERATION EGYPT'S SIGNIFICANT INCREASE IN GENERATION CAPACITY Gas and renewable generation capacity generating surplus power Increasing renewable energy in its generation capacity I GRIDLINE & +3,500km* of high volt

  15. Slide 15: Growth & Diversification

    CORPORATE PRESENTATION CENTAMIN AZ GROWTH & te DIVERSIFICATION FIVE ES SEPTEMBER 2022

  16. Slide 16: Sukari Mining Concession

    SUKARI MINING CONCESSION eae ea sey SUKARI NORTH EXTENSION FULLY EXPLORE THE 160KM? SUKARI MINING CONCESSION i =| eR f 69 | SUKARI NORTH EAST MELANGE lubed -) Exploration programme commenced in 2021 Identify potential satellite feed material Grow the Mineral Resource and Reserve base f waoiaam (SUE

  17. Slide 17: Egypt's Eastern Desert Exploration Blocks

    EGYPT'S EASTERN DESERT EXPLORATION BLOCKS SECURED 3,000KM? HIGHLY PROSPECTIVE GROUND UNDER NEW MINING CODE! Two strategies; three blocks: Nugrus Block (1,086km?) Najd Block (1,374km?) Um Rus Block (524km?) Two-year exploration budget: US$10 million identifying and ranking drill test targets Field wo

  18. Slide 18: Doropo Project Development Potential

    DOROPO PROJECT DEVELOPMENT POTENTIAL POST-TAX NET PRESENT VALUE (NPY; -,) INTERNAL RATE OF RETURN (“IRR”) DEVELOPMENT CAPITAL US$487M 33% US$275M at consensus! gold price at consensus! gold price US$234m at US$1450/oz gold price 21% at US$1450/oz gold price Including 15% contingency MINERAL RESOURCE

  19. Slide 19: Doropo workstreams: drilling and PFS

    Completion of in excess of +100,000 metres of drilling Targeting conversion of Inferred Resources to the Indicated Resource growth potential has also been identified Detailed soil geochemistry sampling programme PFS completion followed by board decision on definitive feasibility study (“DFS”) MAJOR

  20. Slide 20: Outlook

    CORPORATE PRESENTATION OUTLOOK SEPTEMBER 2022 CENTAMIN AZ FIVE MILLION OUNCES

  21. Slide 21: Culture of Continuous Improvements

    eee »\3 L832 £ e A CULTURE OF CONTINUOUS IMPROVEMENTS 2020 - 2023 US$150M -25% COST SAVINGS TARGET REDUCTION IN LTIFR 2021 - 2024 +25% 10 YEARS 3Moz PRODUCTION GROWTH UNDERGROUND RESERVE LIFE GROUP RESERVES GROWTH TO 500,000 OUNCES PER ANNUM CENTAMIN AZ Lolcats tema mn 9

  22. Slide 22: World Class Asset Offering Growth + Yield

    WORLD CLASS ASSET OFFERING GROWTH + YIELD VALUE MAXIMISATION AT SUKARI * Underground transitioned to owner operations * Underground expansion study * Commission solar plant * Drill bonanza high-grade targets CENTAMIN AZ GROWTH & DIVERSIFICATION * Commenced EDX field exploration * Doropo PFS completi

  23. Slide 23: Appendix

    CORPORATE PRESENTATION APPENDIX ENQUIRIES | MICHAEL STONER | INVESTOR@CENTAMINPLC.COM CENTAMIN 32 FIVE MILLION OUNCES

  24. Slide 24: Delivering Operational Consistency

    DELIVERING OPERATIONAL ae Cc O NS | ST E N CY a0 mmm Ore (Mtpa) mmm Waste (Mtpa) ——Grade Mined (g/t) INTERIM CASE (RESOURCE CONVERSION) OPERATING SCHEDULES 120 LOM Strip Ratio - 8:1 (waste:ore) 100 ~) Improved open pit mining flexibility and consistency 80 60 ~Y) Balanced underground stope & develop

  25. Slide 25: Operating Cost Performance

    OPERATING COST PERFORMANCE BENEFITING FROM INCREASED VOLUMES MINED AND OPERATIONAL CHANGES, COUNTERED BY RISING INPUT COSTS OPEN PIT H1 2022: Improved operating productivity. Record material mined, waste-stripping programme progressing well. UNDERGROUND H1 2022: Successful transition to owner mining

  26. Slide 26: Cost Structure

    COST STRUCTURE LIMITED COST SENSITIVITIES MINE PRODUCTION COSTS 1% CENTAMIN AZ GROUP COST BREAKDOWN H1 2021 H2 2021 mLabour ™Fuel m™Consumables m Royalties H1 2022 Contractors Other FX EXPOSURE REDUCED 14% 10% ——> Baa H1 2021 H2 2021 H1 2022 Other BAUD @EGP ®USD 26

  27. Slide 27: Commitment to Shareholder Returns

    COMMITMENT TO SHAREHOLDER RETURNS DECLARED 2022 INTERIM DIVIDEND 2022 INTERIM DIVIDEND IMPLIED 2022 FINAL DIVIDEND? 2.5 US$29 2.5 US cents per share million US cents per share Ex-div Date: 1 September Pay Date: 7 October Equiv. US$29 million INTERIM DIVIDEND PER OUNCE SOLD DIVIDEND YIELD! DIVIDENDS

  28. Slide 28: Thank You

    CORPORATE PRESENTATION THANK YOU ENQUIRIES | MICHAEL STONER | INVESTOR@CENTAMINPLC.COM CENTAMIN AZ FIVE MILLION OUNCES