Waratah Minerals Limited · ASX:WTM

Waratah Minerals — Shareholder Meeting (May 2019)

19 slides from Waratah Minerals's shareholder meeting presentation, May 21, 2019

  1. Slide 1: Battery Minerals Limited Annual General Meeting

    Battery Minerals Limited Annual General Meeting 21 May, 2019 1 1

  2. Slide 2: Battery Minerals - Strongly Positioned for Development & Growth

    Battery Minerals - Strongly Positioned for Development & Growth ● Market ● Company & Projects ● Achievements & look forward

  3. Slide 3: Graphite - a vital raw material

    Graphite - a vital raw material  Climate change and the shift to Clean Energy is real  Battery Minerals is focused on the ‘battery’ minerals  2 x world class, advanced Graphite projects, located in Mozambique Source: World Bank-Climate Smart Mining- worldbank.org

  4. Slide 4: Graphite - the anode in Li-ion batteries

    Graphite - the anode in Li-ion batteries Typical EV Battery Li+ Ion Multiple Small Cells Discharging Electrolyte Charging Li+ Ion Micro- Aluminium Copper porosity Conductor Conductor Separator Graphite Li Metal Anode Complex Cathode

  5. Slide 5: Graphite - largest contributor by weight in a Li-ion battery

    Graphite - largest contributor by weight in a Li-ion battery Porsche Cayenne E-Hybrid 16.8kg Volvo XC 90 T8 PHEV 12.5kg Hyundai Kona 47kg Rivian 216kg Tesla Model X 120kg

  6. Slide 6: It's more than Electric Vehicles

    Refractory It’s more than +41% Electric Vehicles Friction & Lubricants +26% Even in the short-term to 2023, significant demand is forecast in traditional graphite sectors: refractories, expandables, friction and lubricants1. Expandables +49% 1. Benchmark Mineral Intelligence 6

  7. Slide 7: Clean Energy Will Drive Battery Minerals

    Clean Energy Will Drive Battery Minerals Battery Minerals’ product range, in terms of flake size distribution and carbon content, is an everyman product Graphite Demand by sector 2018-2035 Source: Benchmark Mineral Intelligence

  8. Slide 8: Board and Executive Management

    Board and Executive Management Share Price for last 12 months David Flanagan Ben Vanroon Executive Chairman Chief Operating Officer Jeremy Sinclair Nick Day Managing Director Chief Financial Officer Jeff Dowling Daniel Taylor Lead Independent Head of Marketing Director Paul Glasson Naomi Scott Capit

  9. Slide 9: Leveraged to a Growing Market with World Class Assets

    Leveraged to a Growing Market with World Class Assets 1. Exposure to growing traditional graphite markets, and unprecedented forecast demand growth driven by global transition to clean energy 2. 2 x world class graphite projects; Montepuez & Balama Central • Total JORC Resource of 152.5 at 8.5% TGC1

  10. Slide 10: Montepuez Graphite Project - Phase 1

    Montepuez Graphite Project - Phase 1 Montepuez Graphite Project 1 (First Module) Capex to complete 3 US$39.5 M C1 Opex (concentrate/t first 10yrs) US$361/t Grade processed 11% TGC (12% for first 18yrs) Plant Type and Scale Modular, ~500ktpa Projected Payback <2 years EBITDA per annum1 >US$30 Mpa Met

  11. Slide 11: Plant Site Earthworks - Complete

    Plant Site Earthworks - Complete Primary Crusher Mine Services Area Plant Offices, Workshops and Laboratory Milling Area Drying and Product Stores Process Plant 7

  12. Slide 12: Tailings Storage Facility (TSF) - Wall Complete

    Tailings Storage Facility (TSF) - Wall Complete

  13. Slide 13: Montepuez Project Main Camp - Complete

    Montepuez Project Main Camp - Complete 6

  14. Slide 14: Community Engagement - on track

    Community Engagement - on track 9 9

  15. Slide 15: Balama Central Graphite Project - Feasibility Study

    Balama Central Graphite Project - Feasibility Study Balama Central Graphite Project Feasibility Study Dec 2018 Annual graphite production 58,000pa Capex (pre-production) US$69.4 M Opex (concentrate/t first 8 yrs) US$363/t Grade Processed 12.5% TGC Plant Type and Scale Modular, ~550ktpa Projected Pay

  16. Slide 16: Purification and Spheroidisation Testwork

    Purification and Spheroidisation Testwork • Testwork programme undertaken by Urbix Montepuez flake identified with high crystallinity, ultra low Boron content, unique flake morphology and URBIX Purification technology together opening potential new markets • Progress to date • Nuclear, Concrete, Com

  17. Slide 17: Positioned for Project Development & Sustainable Growth

    Positioned for Project Development & Sustainable Growth Achievements Montepuez Construction - camp, TSF, Plant civil earthworks Balama Central Feasibility Study – completed December 2018 Project Finance progress • Extensive data room documentation established to support funding • Independent Technic

  18. Slide 18: Looking forward - The Plan

    Positioned for Project Development & Sustainable Growth Looking forward - The Plan ● Montepuez project finance ● Detailed engineering and procurement ● Award remaining construction contracts ● Construction of Montepuez within 15 months of project finance being finalised ● Urbix and other, downstream

  19. Slide 19: Forward Looking Statements

    Forward Looking Statements • Statements and material contained in this Presentation, particularly • The information in this report that relates to Battery Minerals’ • Battery Minerals confirms that it is not aware of any new those regarding possible or assumed future performance, resources or Minera

Waratah Minerals — Shareholder Meeting (May 2019) on 6ix