Rokeby Resources Limited · ASX:RKB

Rokeby Resources — Corporate Update (July 2019)

21 slides from Rokeby Resources's corporate update, Jul 15, 2019

  1. Slide 1: ASX: ICG

    ASX: ICG

  2. Slide 2: Disclaimer

    Disclaimer Disclaimer This presentation has been prepared by Inca Minerals Limited (ICG). The information contained in this presentation is a professional opinion only and is given in good faith. Certain information in this document has been derived from third parties and though ICG has no reason to

  3. Slide 3: This Presentation

    This Presentation Inca’s New MaCauley Creek Porphyry Project MCP • Highly prospective for Tier-1 Cu-Au-Mo porphyry mineralisation • Known porphyry indicators and walk-up targets already • Part of Inca’s expansion into exploration for Tier-1’s in Australia Recent MaCauley Creek ASX announcements: • 1

  4. Slide 4: MCP - location

    MCP - location MaCauley Creek Project is located approximately 100km west of Townsville in North Queensland Consists of two Exploration Permit for Minerals covering 359km? * EPM 27124 — granted * EPM 27163 — application (grant anticipated Sep) Project lies within the Townsville-Mornington Island por

  5. Slide 5: Tenements/near mines

    MCP – tenements/near mines Two EPM’s: 27124 (granted), 27163 (soon to be granted) Relative size of Riqueza (superimposed) 5 Page 5

  6. Slide 6: Exploration History

    MCP – Exploration History 6 Page 6

  7. Slide 7: Geology/Past Mines

    MCP – Geology/Past Mines Tier-1 porphyry potential remains untested 7 Page 7

  8. Slide 8: Geophysics

    MCP – Geophysics 13km Coincident magnetics, mineralised granites, past mines and topographic feature = very strong - very large porphyry target 8 Page 8

  9. Slide 9: Geophysics II

    MCP - Geophysics II INCA MINERALS LTD Detailed Magnetics Detailed Magnetics %* Prospects (_) Magnetic Feature EPM 27124 [JEPM 27163 |G Mining Leases ZZ Existing Tenure Page 9

  10. Slide 10: Porphyry Potential

    MCP – Porphyry Potential Hypothetical projected current land surface based on alteration and metal signature in outcrop 10 Page 10

  11. Slide 11: Past Mining

    MCP – Past Mining Eleven past mine workings within project area 11 Page 11

  12. Slide 12: Silver-Prospecting Area

    Silver-Prospecting Area Drill cross sections slides 14 & 15 Extensive mineralisation over a 300m x 100m area – OPEN ENDED 12 Page 12

  13. Slide 13: Silver-Prospecting Area II

    Silver-Prospecting Area II Drill intersections … 17m @ 0.43% Cu, 1.67% Pb, 2.93% Zn, 84g/t Ag from 108m within 77m @ 0.14% Cu, 0.74% Pb, 1.03% Zn, 30g/t Ag from 52m 13 Page 13

  14. Slide 14: Silver-Prospecting Area III

    Silver-Prospecting Area III Drill cross sections … 17m @ 0.43% Cu, 1.67% Pb, 2.93% Zn, 84g/t Ag from 108m… …within 77m @ 0.14% Cu, 0.74% Pb, 1.03% Zn, 30g/t Ag from 52m OPEN ENDED 14 Page 14

  15. Slide 15: Silver-Prospecting Area IV

    Silver-Prospecting Area IV Drill cross sections … Mineralised granite with higher grade mineralised margin 15 Page 15

  16. Slide 16: Past Mining II

    MCP – Past Mining II Eleven past mine workings within project area 16 Page 16

  17. Slide 17: Mt Long Mine

    Mt Long Mine Drill cross sections … 13m @ 1.10% Cu, 5.19% Pb, 212g/t Ag from 16m within unsampled sulphides OPEN ENDED 17 Page 17

  18. Slide 18: Past Mining III

    MCP – Past Mining III Eleven past mine workings within project area 18 Page 18

  19. Slide 19: Windcan Mine

    Windcan Mine Drill intersections … 22m @ 0.51% Cu, 2.79% Pb, 66g/t Ag from 10m OPEN ENDED 19 Page 19

  20. Slide 20: In the Portfolio

    MCP – In the Portfolio Inca’s portfolio now includes multiple projects with Tier-1 credentials Partnerships with Majors a key strategy • Peru: • Riqueza Cu-Zn-Ag-Au epithermal, porphyry, skarn project: Funded by South32 • Cerro Rayas Ag-Pb-Zn carbonate replacement project • Australia • MaCauley Cree

  21. Slide 21: What's Next at MCP?

    What’s Next at MCP? Fast-tracking MaCauley Creek to unlock Tier-1 porphyry potential • Continuing a review of past exploration • Field visit planned for July-August • Granting of second EPM anticipated in September 21 Page 21

Rokeby Resources — Corporate Update (July 2019) on 6ix