Drdgold Ltd. · JSE:DRD

Drdgold — Mining Forum Europe 2026

25 slides from Drdgold's conference presentation, Apr 15, 2026

  1. Slide 1: Mining Forum Europe

    Mining Forum Europe 13 – 15 April 2026 Niël Pretorius Jaco Schoeman Chief Executive Officer Chief Operating Officer

  2. Slide 2: Disclaimer

    Disclaimer Many factors could cause the actual results, performance or achievements to be materially different from any future results, performance or achievements that may be expressed or implied by such forward-looking statements, including, among others, adverse changes or uncertainties in genera

  3. Slide 3: About DRDGOLD

    JSE and NYSE About listed gold producer DRDGOLD USD 2.68 billion market capitalisation (as at 8 April 2026) 19 years New York of uninterrupted dividend declaration Two operations located on world- renowned Wits Basin – Ergo and Far West Gold Recoveries (FWGR) South-Africa-based gold producer through

  4. Slide 4: Operational and financial resilience

    Operational and financial resilience H1 2026 l H1 2025 -9% Debt-free: +33% +72% Production clean balance sheet with Revenue Operating profit strong cash position 75 136 oz USD 291.1 m USD 156.3 m 2025: 82 434 oz 2025: USD 211.9 m 2025: USD 88 m Disciplined capital R5 053.2 m R2 712.8 m +17 % allocat

  5. Slide 5: Maximising shareholder return

    Maximising shareholder return 19 consecutive years of dividends. Zero debt. Capital deployed with purpose. 19 years Zero debt +200% 50 SA cents of uninterrupted clean balance sheet Share price growth in the past year Declared for the 6 months ended dividend declaration with R1.7bn cash 31 December 2

  6. Slide 6: Our operating profile

    Our operating profile 6.62Moz mineral resources , 5.73Moz mineral reserve across two long-life operating footprints At Far West Gold Recoveries (16 years) At Ergo (22 years) 2.61 Moz mineral resource 4.01 Moz mineral resource 2.13 Moz mineral reserve 3.60 Moz mineral reserve 7

  7. Slide 7: Our operational model: efficiency at scale

    Our operational model: efficiency at scale Low grade resource means economies of scale necessary High-pressure hydro-mechanical reclamation High plant extraction efficiencies 24/7 operations Unique to us: rehabilitation is concurrrent 8

  8. Slide 8: Guided by a clear strategy

    Guided by a clear strategy OUR GOALS: Our strategy is driven by • Operational efficiency and long-term • Leave no value behind asset optimisation and profitability • Embed resilience sustainable development • Effective capital allocation • Add quality to life Short-term Medium-term Long-term CORE CO

  9. Slide 9: Underpinned by our sustainability model

    Underpinned by our sustainability model Sustainability is our business model, maximising resource value responsibly and returning value to nature and the communities OBJECTIVE OUTCOME Lower cost, lower High-volume, low-cost hydro reclamation of decades-old mine waste to produce gold; safer than unde

  10. Slide 10: Vision 2028 underway

    Vision 2028 underway Our Big 5: Capital projects on target for delivery 1 2 3 4 5 Pipeline linking Ergo Plant Re-commissioning Expansion of Construction of Regional Construction of to Daggafontein TSF to of Withok TSF DP2 plant Tailings Storage pipeline linking DP2 resume deposition on Facility (RTS

  11. Slide 11: Ergo projects update

    Ergo projects update Daggafontein pipeline nearing completion Daggafontein TSF Work in progress includes: • Nearing completion on 21km dual pipeline (slurry and return water) construction • Project is on schedule and budget Completion expected Q1 FY2027 • 120Mt deposition capacity • 500 000tpm depos

  12. Slide 12: FWGR's project update

    FWGR’s project update DP2 Plant Expansion • Smelt house completion expected during Q1 FY2027 • 81% Overall completion • Completion expected Q1 FY2027 Smelt house construction is 135km pipeline on track • 104km (77%) completed to date RTSF • Lining: 1.2 million m 2 installed to date (Target: 3.4 mill

  13. Slide 13: FWGR RTSF

    FWGR RTSF RTSF construction is progressing well despite summer rain delays June 2025 January 2026 14

  14. Slide 14: DP2 Plant Expansion

    DP2 Plant Expansion Throughout capacity doubles to 1.2Mtpm 15

  15. Slide 15: Economics of tailings retreatment

    Economics of tailings retreatment Transforming environmental liabilities into cash generating assets Historic gold mining across the Witwatersrand created large tailings storage facilities containing recoverable gold. DRDGOLD's model unlocks this latent value. High geological and resource risk ECO N

  16. Slide 16: Robust investment case for long-term return & sustainability

    Robust investment case for long-term return & sustainability Outlook FY2026 Guidance to achieve gold production of between 140 000oz and Low risk 150 000oz at cash operating Strong record of – highly mechanised on- Proven technology cost of R995 000/kg dividend payments surface operations and expert

  17. Slide 17: Contact us

    Contact us Niël Pretorius Investor and Registered office Shareholder data Chief Executive Officer media relations Constantia Office Park (Incorporated in the Email: Cnr 14th Avenue and Republic of South Africa) Henriette Hooijer DRDGOLD_Communications Hendrik Potgieter Road Registration No. Chief Fi

  18. Slide 18: Appendix

    Appendix Mle | ior Growte DRDGOLD SUSTAINABLY GOLD LIMITED | =

  19. Slide 19: How we are structured

    How we are structured • SouthAfrica’s oldest continuously listed 22.5% 50.1% mining company still in operation, 0.1% established in 1895 • Listed on the Johannesburg Stock Sibanye Gold Prop Limited Exchange (JSE) and the New York Stock JP Morgan Chase Bank (ADRs) Exchange (NYSE) GEPF • Market cap: 1

  20. Slide 20: Group operating trends

    TN Positioning for Growth DRD SUSTAINABLY GOLD SUSTAINABLY GOLD LIMITED restore | Volume (000t) Yield (g/t) Production (kg) 0.199 13.000 129i6 12697 0.200 on78 0.188 2700 2564 12 456 0.150 2.400 2 2337 12.000 2266 0.100 2.100 11000 0.050 1.800 10 000 0.000 1500 HY1 FY2025 Hy2 FY2025, HY1 FY2026 HYT

  21. Slide 21: Group financial trends

    60.0 50.0 40.0 30.0 900.0 600.0 300.0 0.0 Positioning for Growth SUSTAINABLY GOLD 7 DRD LIMITED Operating margin (%) All-in sustaining costs margin (%) 50 48.3 53.7 42.3 477 40 35.0 AS 30 20 10 HY1 FY2025, HY2 FY2025 HY1 FY2026 HY1 FY2025 HY2 FY2025 HY1 FY2026, Free cash flow (Rm) HEPS (cents per sh

  22. Slide 22: Financial review: Statement of profit and loss

    Financial review: Statement of profit and loss For the six months ended 31 December 2025 Six months ended 31 December 2025 Six months ended 31 December 2024 Rm USDm Rm USDm Revenue 5 053.2 291.08 3 802.3 211.95 Cost of sales (2 591.4) (149.27) (2 490.4) (138.82) Gross profit from operating activitie

  23. Slide 23: Financial review: Statement of financial position

    Financial review: Statement of financial position As at 31 December 2025 As at 31 December 2025 As at 30 June 2025 As at 31 December 2024 Rm USDm Rm USDm Rm USDm Property, plant and equipment 10 027.2 605.42 8 542.2 481.39 7 468.5 396.19 Non-current investments and other assets 1 600.8 96.65 1 382.0

  24. Slide 24: Financial review: Statement of cash flows

    Financial review: Statement of cash flows For the six months ended 31 December 2025 Six months ended 31 December 2025 Six months ended 31 December 2024 Rm USDm Rm USDm Net cash inflow from operating activities 2 309.1 133.01 1 283.0 71.52 Cash generated from operations 2 498.0 143.89 1 205.6 67.20 F

  25. Slide 25: Mineral Resources and Mineral Reserves

    Mineral Resources and Mineral Reserves Tonnes Grade Au Au ounces Mineral Resources reconciliation Mt g/t Moz Mineral Resources at 30 June 2025 685.30 0.28 6.27 Addition of Kloof 2 Dump 67.28 0.22 0.48 Depletion of Mineral Resources (12.16) 0.35 (0.13) Survey adjustments 0.72 0.34 0.01 Mineral Resour

Drdgold — Mining Forum Europe 2026 on 6ix