Slide 1: PT Resource Alam Indonesia Tbk Presentation
PT RESOURCE ALAM INDONESIA Tbk Stock Code : KKGI Indonesia Stock Exchange 29 November 2018 P R E S E N TAT I O N
Slide 2: Company's Overview
2 Company’s Overview PT. Resource Alam Indonesia Tbk (IDX: KKGI) is a holding company with subsidiary in the field of mining coal and mini-hydro power plant located in some sites in Indonesia as follows: 1. PT. Insani Baraperkasa: PKP2B of Generation III, East Kalimantan, Concession Area of 24,477.6
Slide 3: Updated Reserves Data
3 UPDATED RESERVES DATA • PT Resource Alam Indonesia Tbk through its subsidiary PT Insani Baraperkasa “Insani” has commissioned in October 2018 a Pre-Feasibility Study and Coal Reserves Statement which is in compliance with the Australasian Code for Reporting Mineral Resources and Ore Reserves (JORC
Slide 4: Latest Reserves Data
4 LATEST RESERVES DATA UPDATED RESERVES DATA as per Dec 31, 2017 ( INCLUDING JORC REPORT FROM BRITMINDO) Internal JORC 2018 Eksploration Total Reserves (mill MT) Non JORC (A+B) (A) (mill MT) (B) Proven 69.0 14.2 83.2 Probable 22.8 64.1 86.9 Total Reserves 91.8 78.3 170.1
Slide 5: Structure Ownership 31 Oct 2018
5 Structure Ownership 31 Oct 2018 31.37 % 25.52 % 7.99 % 28.99 % UBS AG PT. SEJAHTERA Public * SINGAPORE S/A UBS AG SPORE JAYA CITA (<5%) ENERGY COLLIER PT. RESOURCE ALAM INDONESIA TBK (KKGI) PT. Insani PT. Khatulistiwa PT. Kaltim Mineral PT. Loa Haur Baraperkasa Hidro Energi 99.9 % 75.0 % 60.0 % 43
Slide 6: PT Insani Baraperkasa (IBP) Coal Mining Concession
6 PT Insani Baraperkasa (IBP) Coal Mining Concession • The Company as the owner of coal mining concession that has been in production phase and as the holder of PKP2B of Generation III. • The concession area of 24,477.6 acres where its mining area up today is ± 2,037 acres. • Based on JORC Report fr
Slide 7: Mine Location Map
ae Mine Location Map RAIN GROUP PT RESOURCE ALAM INDONESIA Tbk
Slide 8: Mine Location Map Insani Baraperkasa
8 Mine Location Map Insani Baraperkasa
Slide 9: Infrastructure Capacity 2018
9 Infrastructure Capacity 2018 DISTANCE CRUSHER CAPACITY LOADING CAPACITY LOCATION (KM) PORT Purwajaya 13 Purwajaya Selatan 10 1.000 MT/Hour 800 MT/Hour Loa Duri Manunggal Jaya 19 Tani Bakti 14 Handil Bakti 22 Handil Bakti 11 PSM 300 MT/Hour 150 MT/Hour Separi 22 SHS 350 MT/Jam 500 MT/Jam TOTAL/ Hou
Slide 10: Production Volume year 2007 to 2018
10 Production Volume year 2007 s/d 2018 PRODUCTION COAL (MT) 4222 4186 4158 3418 3167 3182 2249 estimation 1830 1892 1008 773 178 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018
Slide 11: Export Destination
11 Export Destination JAN – OCT 2018 SALES 3Q 2018 KOREA 2.16% 0.04% 7.08% INDIA CHINA BANGLADESH 31.21% KALBAR 59.54%
Slide 12: Production and Sales Volume Per Quarter
12 Production Volume Per Quarter (MT) 1,061,604 898,852 936,865 681,929 716,024 540,142 562,011 558,981 397,662 324,304 213,694 182,741 1Q16 2Q16 3Q16 4Q16 1Q17 2Q17 3Q17 4Q17 1Q18 2Q18 3Q18 4Q18 Sales Volume Per Quarter (MT) 945,333 921,534 877,491 809,367 722,111 491,039 524,849 441,968 361,556 39
Slide 13: Average Selling Price and Cash Cost
13 Average Selling Price (US$/MT), FOB Vesell AVERAGE SELLING PRICE 46.63 44.59 37.23 33.40 FY15 FY16 FY17 9M18 CASH COST/MT 25.32 20.86 22.42 17.66 FY15 FY16 FY17 9M18
Slide 14: Indonesia Coal Index Selling Price Jan 2017 – Nov 2018
14 Indonesia Coal Index Selling Price Jan 2017 – Nov 2018 120.00 100.00 6500 80.00 5800 5000 60.00 4200 40.00 3400 20.00 - JAN FEB MRT APRL MEI JUNI JULI AGTS SEPT Okt Nop Des JAN FEB MRT APRIL MEI JUN JUL AUG SEP OCT NOV 2017 2018
Slide 15: Statement of Profit and Loss
15 Statement of Profit and Loss 9M2018 9M2017 (%) (US$/Million) (US$/Million) Revenue 36.24 53.86 (32.71%) Gross Profit 11.07 16.66 (33.55%) Operational 5.31 11.77 (54.85%) Profit Net Profit After 2.11 8.17 (74.17%) Tax
Slide 16: Financial Position
16 Financial Position 9M2018 9M2017 (%) (US$/Million) (US$/Million) 109. Total Asset 95.95 13.84% 23 Total Liabilities 22.18 12.11 83.15% Total Equity 87.05 83.84 3.83% Debt1 6.89 1.07 543.93% 1 Leasing + Bank Loan
Slide 17: Financial Ratio
17 Financial Ratio RATIO 9M2018 9M2017 Gross Margin 30.53% 30.93% Operational Margin 14.66% 21.85% Net Margin 5.81% 15.18% ROA (peryear) 2.57% 11.36% ROE (peryear) 3.22% 13.00% Debt1 to Equity 7.91% 1.28% 1 Leasing + Bank Loan
Slide 18: The Efforts to Improve the Performance in the Future
18 The Efforts to Improve the Performance in the Future 1. The availability of heavy equipment and adequate supporting facility to support mining operation. 2. The Company manages to re-adjust the Striping Ratio (SR). 3. The Company remains keeping of mega pit design in the mining at Loajanan and Ta
Slide 19: Projection 2018
19 Projection 2018 5.00 • The Company makes a projection of production up to the end of 2018 of approximately 1.9 million tons 4.50 • Having the expectation that coal price will be better in 4.00 2019, the Company has production target of 4.0 million MT. 3.50 • Having the expectation that coal price
Slide 20: Focus Ahead
20 Focus Ahead 1. Make sure that target of production and sales in 2018 can be achieved well in accordance with market condition. 2. Increase the productivity and operational efficiency of the Company in order to keep resulting a significant Return on Equity. 3. Continuously improve the level of Goo
Slide 21: Most Update Information of the Company
21 Most Update Information of the Company 1. Obtaining the certification of Quality Management System of ISO 9001:2015 and Environment Management System of ISO 14001:2015 under the scope of “Provision of Coal Mining”, the subsidiary of Insani Baraperkasa (IBP) in October and November 2018. 2. PT. In
Slide 22: Zero Accidance Certificate
22 ZERO ACCIDANCE CERTIFICATE
Slide 23: Environment Green Certificate
23 ENVIRONMENT GREEN CERTIFICATE
Slide 24: Certificate of Obedience Top Tax Payer
24 SERTIFICATE OF OBEDIENCE TOP TAX PAYER
Slide 25: Certificate ISO 9001:2015 dan ISO 14001:2015
25 Certificate ISO 9001:2015 dan ISO 14001:2015
Slide 26: Loading Facility Loajanan
26 Loading Facility Loajanan
Slide 27: Progress Open Pit TBS
27 — RAIN GROUP PT RESOURCE ALAN INDONESIA Tbk
Slide 28: Team Work Insani
= —— | Team Work Insani RAIN GROUP PT RESOURCE ALAM INDONESIA Thk
Slide 29: Vessel Activity
29 — | Vessel Activity RAIN GROUP PT RESOURCE ALAM INDONESIA Tbk
Slide 30: Community Development Program (PPM) INSANI
30 Community Development Program (PPM ) INSANI Helping for earthquake Tsunami at Sulteng through Kasat Reskrim Polresta Samarinda
Slide 31: Community Development Program (PPM) INSANI
31 Community Development Program (PPM ) INSANI Helping Capex assistance at Kelurahan PAUD Insani Cendekia Handil Bakti Samarinda
Slide 32: Community Development Program (PPM) INSANI
32 Community Development Program (PPM ) INSANI Workshop Training Workshop Design Grafis
Slide 33: Submission of ISO 9001:2015 and ISO 14001:2015 Certification
33 Submission of ISO 9001:2015 and ISO 14001:2015 Certification by the President Director of the TUV SUV to the President Director of the PT Insani Baraperkasa 33
Slide 34: Submission of ISO 9001:2015 and ISO 14001:2015 Certification
34 Submission of ISO 9001:2015 and ISO 14001:2015 Certification by the President Director of the TUV SUV to the President Director of the PT Insani Baraperkasa 34
Slide 35: Submission of ISO 9001:2015 and ISO 14001:2015 Certification
35 Submission of ISO 9001:2015 and ISO 14001:2015 Certification by the President Director of the TUV SUV to the President Director of the PT Insani Baraperkasa 35
Slide 36: Disclaimer
36 DISCLAIMER These materials have been prepared by PT Resource Alam Indonesia Tbk (the “Company”) and have not been independently verified. No representation or warranty, expressed or implied, is made and no reliance should be placed on the accuracy, fairness or completeness of the information pres