Slide 1: Styldrift I Project Overview
Royal Bafokeng Platinum Styldrift I Project Overview SBGS 2018 Mining Conference 5 June 2018
Slide 2: RBPlat in context
RBPlat in context Our Mission is to leave a lasting legacy of sustainable benefits for our stakeholders Broad based > RBPlat is a community owned, low cost, PGM mining and Community ownership concentrating company positioned for long term growth #1 ranked ESG* > Mining operations are located on the
Slide 3: BRPM JV location well suited to regional consolidation
BRPM JV location well suited to regional consolidation BRPM JV: > BRPM > Styldrift I > Maseve > Styldrift II SBGS 2018 Mining Conference – 5 June 2018 3
Slide 4: Increasing level of geoscientific knowledge and confidence
RBPlat attributable resources (67%) – in excess of 60 years Mineral resources: Mineral reserves: Increasing level of geoscientific 46.11 Moz 11.75 Moz knowledge and confidence. Inferred 7.57 Moz Indicated Probable 15.59 Moz 5.56 Moz Measured Proved 22.95 Moz 6.20 Moz Rh, 4.35% Au, 4.25% Au, 0.56% Re
Slide 5: Styldrift I Project
Styldrift I Project
Slide 6: Operational flexibility enhanced by the acquisition of Maseve
Operational flexibility enhanced by the acquisition of Maseve Key assets include: Key benefits: > Concentrator plant (110ktpm) > Capital efficient > Associated surface infrastructure and > Ramp-up Styldrift to 230ktpm tailings storage facility > Extend BRPM South shaft Merensky LOM > Maseve mineral
Slide 7: Styldrift I – low cost mechanised mine
Styldrift I – low cost mechanised mine 6.98g/t 4E 71.9Mt Flat dipping Mean mining Continuous resource Merensky 40 - 60 depth 680m ore body grade resource High grade quality orebody 4.30g/t 4E 3000 230ktpm 320koz pa delivered employees 2.76Mtpa 4E grade Modern and efficient infrastructure Utilities L
Slide 8: Styldrift I – 9 years into the project life cycle with R9 billion spent
Styldrift I – 9 years into the project life cycle with R9 billion spent to date 2009 -2010 2011 - 2012 2013 2014 2015 2016 2017 Q1 - 2018 • Site establishment • Pre-sink completed • Sinking progressed • Surface & U/G ore • Sinking contract • Completed 250ktpm • 8 U/g Workshops • Services Shaft • Foc
Slide 9: Styldrift I project progress ramp-up overview
Styldrift I project progress ramp-up overview Description Unit 2015 2016 2017 Q1-2018 Project progress Stoping ‘000 m2 0.66 12.56 40.54 18.48 2 Project-to-date stoping ‘000 m 0.66 13.31 53.85 72.33 Development m 1 602 5 018 6 834 1 564 Project-to-date development m 5 948 10 966 17 800 19 364 ROM ton
Slide 10: The road map to steady state
The road map to steady state Key focus areas: Main Shaft Services Shaft Ventilation shafts 1,2 and 3 > Production infrastructure > Ore reserve development > Ore handling infrastructure > 150ktpm Q4 2018 > 230ktpm Q3 2020 Legend: Development completed end 2016 Section N5 Shaft infrastructure developm
Slide 11: How we compare to the market: Cash Operating Cost
Styldrift I : How we compare to the market Cash Operating Cost (R/t) BRPM Styldrift > Styldrift is a world class orebody • 4.3 g/t 4E Merensky • Primary access through vertical shafts > Styldrift will improve our position on the cost curve • Reinforce our Quartile 1 position • Competitive on a R/Pt
Slide 12: In conclusion
In conclusion Styldrift set to cement our position as a low cost, high margin operator > World class ore body • Shallow • High grade • Flat dip and mineralised envelope that supports mechanisation > Low cost, high efficiency mining method • Established and proven low profile “bord & pillar” layout •