Theta Gold Mines Ltd. · ASX:TGM

Theta Gold Mines — Investor Presentation (March 2019)

29 slides from Theta Gold Mines's investor presentation, Mar 20, 2019

  1. Slide 1: 5.8 Moz Resource & potential near-term gold production profile

    For personal use only THETA GOLD MINES LIMITED ASX: TGM 5.8 Moz Resource & potential near-term gold production profile Investor Presentation March 2019 (Hong Kong & Singapore ) ASX: TGM

  2. Slide 2: Disclaimer and Competent Persons Statement

    For personal use only Disclaimer and Competent Persons Statement • This Presentation has been prepared by and issued by Theta Gold Mines Limited (ASX:TGM) (Theta or the Company) is to assist in informing interested parties about the Company and should not be considered as an offer or invitation to s

  3. Slide 3: Investment Overview: low CAPEX, potential near-term production

    For personal use only Investment Overview: low CAPEX, potential near‐term production • Gold 5.75 Moz @ 4.57g/t Au discovered with 2 Moz increase (2018). • A massive ground holding across the East Transvaal Goldfield. • Potential to bring multiple mines online, increase the production profile. • Firs

  4. Slide 4: Corporate Overview

    For personal use only Corporate Overview Capital structure 85% of register owned by Top 20 Ordinary shares ~357 million Fineway Creation Ltd (Since 2018) 18.80% Listed Options (TGMO), 2yr expiration $0.30 exercise (m) 31.4 Tasman Funds Management (related to Director, Since 2015) 9.18% Unlisted Opti

  5. Slide 5: New directors & exec: a clear focus on production

    For personal use only New directors & exec: a clear focus on production Key Personnel Position Expertise Mr Guy is a professional Mining executive and geologist with over 25 years’ experience in exploration and resource Bill Guy Chairman development (in Asia, Australia and Europe), capital raisings

  6. Slide 6: Project Overview: a leading gold stock in the making

    For personal use only Project Overview: a leading gold stock in the making • A massive 620 km2 of ground holding across the East Transvaal Goldfield • Multiple open‐cut mines in the making, creating a very unique South African gold company • Potential to bring multiple mines online and to organicall

  7. Slide 7: Market Overview: emergence of an established mining jurisdiction

    Market Overview: emergence of an established For personal use only mining jurisdiction • South Africa has produced more gold than any other country • Around 2B ounces have been produced from South African goldfields • The mining industry employs over 500,000 people and contributes around 10% of GDP

  8. Slide 8: Numerous examples of recent South African mining success

    For personal use only Numerous examples of recent South African mining success • Bushveld Minerals Vanadium/Iron producer (LSE.BMN, £425m MC ) • Vanadium producer (2.5ktpa growing to >4ktpa) • Share price rose >3300% from £1.45 to £48 within two years by Aug’18 • H1 2018 revenue of US$85m (H1 2018 E

  9. Slide 9: Exploration & development

    For personal use only Exploration & development 8 ASX: TGM

  10. Slide 10: A massive holding covering a major gold field

    For personal use only A massive holding covering a major gold field This prolific gold field has produced • 1886 – Current. Witwatersrand around 7Moz in the past. (surrounds Johannesburg, currently mining up to 4km underground) TGME Gold Projects • 1881 – Current. Barberton Goldfield (450km East of

  11. Slide 11: JORC Resource of 5.8Moz, up 57% in 2018

    For personal use only JORC Resource of 5.8Moz, up 57% in 2018 • The company successfully delivered resource Data-to-Drill Validation Model growth of 57% (+2.0Moz) during programs undertaken in 2018 Resource Growth 6 • Effective cost of US$15/oz to prove up 5.5 Indicated Resources JORC Resource (Moz

  12. Slide 12: Multiple Immediate-Term Open-Cut Drilling Targets

    For personal use only Multiple Immediate‐Term Open‐Cut Drilling Targets Vaalhoek Frankfort Mine Mine CD M Continuing Columbia Pilgrims to Grow Rest Hill Theta Hill Open Cut Chi Beta Mine Resources Mine Desire TGME Mine Plant Browns Hill 2 km 11 ASX: TGM

  13. Slide 13: First Open Cut – Feasibility Study due Q2 2019

    For personal use only First Open Cut – Feasibility Study1 due Q2 2019 • A focus on delineating sufficient initial reserves to underpin the financing and construction of the Theta Open Cut Project in H2 2019 • The Feasibility Study will define a high margin startup development, with short capital pay

  14. Slide 14: Reduced Capital Plant Refurbishment

    For personal use only Reduced Capital Plant Refurbishment • Scoping Study from September 2018 provided preliminary cost estimate of US$11m1 for refurbishment and upgrade to a 480Ktpa plant (last operated in 2015) • New crushing and Milling circuits, additional CIL circuit tanks, refurbishment of elu

  15. Slide 15: 2019 – A Transformative Year

    For personal use only 2019 – A Transformative Year Current Focus Development strategies Growing Value • Deliver Feasibility (Theta Hill) • Build shallow open cut resources • Make new shallow discoveries via • Reserve drilling, detailed • To convert part of the large systematic exploration engineerin

  16. Slide 16: Building Value in 2019-2020

    For personal use only Building Value in 2019‐2020 Feasibility & Reserves Aim to be valued drilling Evaluate & Drill for Theta Hill develop based on future indicated Open‐cut other production earnings /Inferred (67kozpa1 nearby high supported by a solid Resources 5.75Moz+ Resource initial plan) grade

  17. Slide 17: APPENDIX Mineral Resources

    APPENDIX 1 For personal use only Mineral Resources 16 ASX: TGM

  18. Slide 18: Resources JORC 2012: Stonewall Underground Operations

    For personal use only Resources JORC 2012 Mineral Res ources for the Stonewall Underground Operations as at Septem ber 2018 Reef Reef Stope Reef Stope Resource Stope Grade Content Au Content Mine Reef Grade Width width Tonnes Tonnes Classification g/t g/t cm cm cmgt Mt Mt Kg koz Meas ured Frankfort

  19. Slide 19: Resources JORC 2012: Stonewall Open Pit Operations

    For personal use only Resources JORC 2012 Mineral Res ources for the Stonewall Open Pit Operations as at Septem ber 2018 Reef Reef Resource Reef Width Content Au Content Open Pit Mine Reef Grade Tonnes Classification g/t cm cmgt Mt Kg koz Herm ans burg Elluvial 1.79 0 0 0.505 905 29.1 DG1 Elluvial 1

  20. Slide 20: Resources JORC 2012: Stonewall Tailings Dams

    For personal use only Resources JORC 2012 Mineral Res ources for the Stonewall Tailings Dam s as at Septem ber 2018 Resource Surface Operation Reef Tonnage Gold Grade Gold Content Notes: Classification Mt g/t Kg koz 1. Underground cutoff is 160cm.g/t, open pit Glynn’s Lydenburg Tailings 1.211 0.80 9

  21. Slide 21: Growing open-cut resources: Columbia Hill

    For personal use only Growing open‐cut resources: Columbia Hill March 2019 Drill Results November 2018 Drill Results BHID From To Width Au g/t Au Comments Au Content Back calc in situ Iota m m m Cm.g/t Reef g/t over 25cm RCBI12B 43.00 59.00 16.00 3.27 Bevetts 5,233 13.08 Incl 48.00 58.00 10.00 4.46

  22. Slide 22: More open-cut potential: Vaalhoek

    For personal use only More open‐cut potential: Vaalhoek • Potential second high grade open‐cut mine • Resource of 0.62Mt @ 16.9g/t (335koz), 82% inferred1 • Drilling planned for 2019 to upgrade to primarily Indicated Resources and plan for Reserves (JORC, 2012). • Located within 20km of TGME process

  23. Slide 23: Underground potential: Rietfontein Mine

    For personal use only Underground potential: Rietfontein Mine Open Shallow Underground Development pipeline along strike • JORC Resource of 2.88Mt @ 8.42g/t Au for >3km strike 780Koz (31% Indicated, 69% Inferred) • Mine not accessed since WWII due to water ingress over 70 years • Focus of drilling w

  24. Slide 24: Other Underground Opportunities to Grow Resource

    For personal use only Other Underground Opportunities to Grow Resource • Numerous additional underground opportunities identified Shallow Underground • Criteria of high grade (>5g/t) and low capital requirements Development pipeline • Second‐priority behind Theta Hill, Vaalhoek open cuts and Rietfon

  25. Slide 25: APPENDIX Mining techniques

    APPENDIX 2 For personal use only Mining techniques 24 ASX: TGM

  26. Slide 26: Concept Mine Planning at Theta Hill Opencut

    For personal use only Concept Mine Planning at Theta Hill Opencut • Low cost stripping of overburden • Minimal drill and blast predicted due to very broken ground  cost effective & lesser environmental impact • In‐pit emplacement of waste during ‘bench‐style’ contour mining • Relatively flat‐lying

  27. Slide 27: Surface Miners at Theta Hill Opencut

    Surface Miners at Theta Hill Opencut For personal use only • Simple Mining high productivity up to 4,300 t/hr (Low Operating Cost) • Selective Mining ‐ Reduced dilution, maximised ore recovery, reduced gold losses • Less energy costs ‐ eliminate primary crushing and drill and blast operations • Less

  28. Slide 28: Soft Rock Mining at Theta Hill Opencut

    For personal use only Soft Rock Mining at Theta Hill Opencut • Flexibility: Greater selectivity, improved productivity and reduced dilution. Can work in steep terrain with variable contours Comparison of costs from different rock-types (courtesy Wirtgen/Minxcon). 27 ASX: TGM

  29. Slide 29: Theta Gold Mines Ltd

    For personal use only Theta Gold Mines Ltd Rob Thomson Managing Director Bill Guy Chairman ASX: TGM www.thetagoldmines.com robt@thetagoldmines.com billg@thetagoldmines.com 28 ASX: TGM

Theta Gold Mines — Investor Presentation (March 2019) on 6ix