Magnetite Mines Ltd. · ASX:MGT

Magnetite Mines — Investor Presentation (October 2023)

22 slides from Magnetite Mines's investor presentation, Oct 26, 2023

  1. Slide 1: Premium Iron Ore ... for steel sector decarbonisation

    For personal use only Premium Iron Ore ... for steel sector decarbonisation The time is now October 2023

  2. Slide 2: Disclaimer

    Disclaimer For personal use only IMPORTANT NOTICE ADDITIONAL INFORMATION The purpose of this presentation is to provide general information about This presentation should be read in conjunction with MGT’s Annual Report at 30 Magnetite Mines Limited ("MGT"). It is not recommended that any person make

  3. Slide 3: Magnetite Mines: Developing Razorback, premium-grade iron ore project in a tier 1 location

    Magnetite Mines (ASX:MGT) Developing Razorback: Expansive, premium-grade iron ore project in a tier 1 location For personal use only The Company The Opportunity Focused on 100% Rare, premium-grade Steelmakers are Supportive SA Substantial owned Razorback Magnetite iron ore looking now government re-

  4. Slide 4: Corporate overview

    Corporate overview Strengthened Board and Management with development in sights For personal use only Board Management Market Cap Jim McKerlie Chair of the Board Tim Dobson Chief Executive Officer BA Economics (Hons), Dip Fin Mgt, FCA, FAICD BAppSc (Ext.Metallurgy), GAICD, MAusIMM $32M ▪ ▪ Internati

  5. Slide 5: Increasing global steel demand is a certainty

    Increasing global steel demand is a certainty Steel is critical to tackling climate change – Razorback is a supply chain critical link For personal use only Production has doubled every 20 years since 1950 … … and more steel is necessary for energy transition Producing 8% of Steel (Mt) required for

  6. Slide 6: Challenging decarbonisation targets have been set

    Challenging decarbonisation targets have been set Industry is now committed and seeking new high grade ore supply For personal use only Direct emissions intensity of steel production Major steel producer carbon reduction targets ‘Steel Breakthrough Agenda’ COP27 (2022) ▪ Consistent international sta

  7. Slide 7: The transition away from coal has commenced

    The transition away from coal has commenced Razorback to supply high-grade, low-impurity iron ore for replacement technologies For personal use only Coal-using blast furnaces to be replaced over next 5 – 25 years Iron ore grade required Feed Iron Reduction Melting Carbon emissions (t CO2/t) Inputs C

  8. Slide 8: New premium-grade iron ore supply critical to transition

    New premium-grade iron ore supply critical to transition Razorback Project positioned to meet urgent new demand For personal use only Razorback >68% Fe concentrates positioned in DR-grade range* High-grade iron ore demand-supply gap to increase Exported Iron Ore – Fe Grade Comparison Australian Hema

  9. Slide 9: The South Australia advantage

    The South Australia advantage SA is leading the way to a future green iron economy For personal use only Attracting international investment Value adding Australia’s opportunity can be realised through collaboration and investment in green iron hubs Magnetite + Renewable Energy + Green Hydrogen ✓Tie

  10. Slide 10: Razorback: Expansive, soft, outcropping iron ore

    Razorback: Expansive, soft, outcropping iron ore South Australia’s Braemar Iron Formation – a globally significant magnetite province For personal use only The Braemar advantage ▪ Outcropping ore: very low strip ratio Iron Peak ▪ Siltstone-hosted iron ore, not BIF * ▪ Soft relative to WA magnetite o

  11. Slide 11: Outstanding project location in the undeveloped Braemar

    Outstanding project location in the undeveloped Braemar Close to potential future green iron hubs at Whyalla & Port Pirie For personal use only Adelaide 240km Open-access rail ~50km Whyalla Port 315km Port Pirie 180km Grid Power 100% renewable by 2030 1111 ~125km

  12. Slide 12: Low risk conventional project configuration

    Low risk conventional project configuration Well-proven mining practices and processing technologies For personal use only Open cut mining Magnetic separation Truck haulage to rail siding 12

  13. Slide 13: High-grade Iron Peak deposit: prioritised for production

    High-grade Iron Peak deposit: prioritised for production New maiden Ore Reserve For personal use only Iron Peak included in Razorback Project: ✓4km from Razorback deposit ✓Best mass recovery ✓Best concentrate quality ✓First 10 years plant feed Iron Peak ✓Orebody open along strike/depth Mineral Resou

  14. Slide 14: Positive Razorback Project Optimisation Study economics

    Positive Razorback Project Optimisation Study economics Results leading to larger scale production and staged expansion strategy For personal use only Staged development pathway manages risk Key project metrics5 Expansion Physical Metrics Unit Base Case Option dry Concentrate production rate 5 10 Mt

  15. Slide 15: Razorback Project economics globally-competitive

    Razorback Project economics globally-competitive Highly-competitive cost base on a standardised basis For personal use only Wood Mackenzie 2027 VIU-adjusted (62% Fe eq.) cost curve (US$/t)a,b 1st quartile 2nd quartile 300 250 US$/t (real 2023$) 200 150 10Mtpa 5Mtpa 100 50 - 0% 5% 85% 100% 10% 15% 20

  16. Slide 16: Razorback Project financing concept

    Razorback Project financing concept Joint venture with motivated offtakers For personal use only UNINCORPORATED JOINT VENTURE (JV) JV PARTNER 1 Joint Ventures (JV) Our choice of partners $ ▪ Well-proven model for big ▪ World-class asset has attracted Australian iron ore projects over many global ste

  17. Slide 17: MGT's bespoke sustainability platform

    MGT’s bespoke sustainability platform Elevating future ESG outcomes through early action and commitment For personal use only Environmental sustainability Social & community inclusion Cultural heritage survey with Ngadjuri team ▪ Enabling future low carbon ▪ Partnering agreement in development steel

  18. Slide 18: Magnetite Mines is well positioned for success

    Magnetite Mines is well positioned for success Aligned with timing and acceleration of downstream demand For personal use only KEY MILESTONES NEXT STEPS Confirmed Economics infrastructure updated access for rail including Iron Ngadjuri and power Peak and 2 Bt partnering Key land Bulk agreement Lodge

  19. Slide 19: The opportunity is now

    Magnetite Mines For personal use only The opportunity is now Decarbonisation Outstanding Project Progressing to Substantial re-rating Tailwind Credentials Development potential ▪ Premium-grade iron ore ▪ Tier 1 location ▪ Partner interest increasing ▪ Project set for long life needed now to enable ▪

  20. Slide 20: References

    For personal use only References 1. ASX Announcement – 09/02/23 – Iron Peak Resource Significantly Improved 2. ASX Announcement – 22/11/22 - Muster Dam Mineral Resource Estimate 3. ASX Announcement – 22/03/23 - Razorback Iron Project Ore Reserves Increase 340% - Update 4. ASX Announcement – 09/06/23

  21. Slide 21: Contact

    For personal use only Contact gemma.brosnan@magnetitemines.com +61 8 8427 0516 www.magnetitemines.com 21

  22. Slide 22: Appendix: Mineral Resources and Reserves

    Appendix 1 Mineral Resources and Reserves For personal use only Razorback Iron Ore Project (Razorback & Iron Peak deposits combined)a Classification Tonnes (Mt) Mass Rec % Fe % SiO2 % Al2O3 % P% LOI % Magnetite % Indicated 1,675 15.95 18.36 48.02 8.06 0.18 5.46 15 Inferred 1,570 16.09 17.74 48.6 8.2

Magnetite Mines — Investor Presentation (October 2023) on 6ix