Alterra Power Corp

Alterra Power — FY2012 Earnings Presentation

21 slides from Alterra Power's earnings presentation, Mar 28, 2013

  1. Slide 1: 2012 Results Conference Call

    28 MARCH Page |1 2013 2 0 1 2 R E S Uwww.alterrapower.ca LTS CONFERENCE CALL TSX : AXY

  2. Slide 2: Forward-Looking Information

    Forward-Looking Information This presentation contains certain “forward-looking information” within the meaning of Canadian securities laws, which may include, but is not limited to, statements with respect to future events or future performance, management’s expectations regarding Alterra’s product

  3. Slide 3: Participants

    Participants Introduction • John Carson  CEO Financials • Lynda Freeman  Interim CFO Operations • Bruce Ripley  COO • Jay Sutton  VP, Hydro Power • Paul Rapp  VP, Wind and Geothermal Power • Murray Kroeker  VP, Solar Power and Engineering Growth Opportunities • John Carson  CEO Summary • Ross

  4. Slide 4: Results and Generation

    Alterra Power 2012 Results Call Financials | Lynda Freeman, Interim CFO Results and Generation Consolidated Results ($MM) Generation (MWh) (a) Q4 2012 Q4 2011 Q4 2012 Q4 2011 Revenue 17.2 17.7 HS Orka 320,155 319,157 Gross profit 4.5 3.8 Soda Lake 17,943 19,249 Equity loss (3.8) (5.0) Toba Montrose

  5. Slide 5: Results and Generation (cont'd)

    Alterra Power 2012 Results Call Financials | Lynda Freeman, Interim CFO Results and Generation (cont’d) Consolidated Results ($MM) Generation (MWh) (a) Twelve months Six months Twelve months Six months ended ended Dec 31, ended Dec 31, ended Dec 31, Dec 31, 2011 2012 2011 2012 Revenue 61.1 34.7 HS O

  6. Slide 6: Annual Pro Forma Comparative Information

    Alterra Power 2012 Results Call Financials | Lynda Freeman, Interim CFO Annual Pro Forma Comparative Information 2012 Actual Operating Results ($000) HS Orka (b) Toba Montrose Dokie 1 Soda Lake Total Net Interest (66.6%) (40%) (51%) (100%) Production (MWh) 817,459 264,564 151,667 64,421 1,298,111 Re

  7. Slide 7: Annual Pro Forma Comparative Information (cont'd)

    Alterra Power 2012 Results Call Financials | Lynda Freeman, Interim CFO Annual Pro Forma Comparative Information (cont’d) 2011 2012 Production (GWh) All values in $MM 900 750 600 450 300 150 HS Orka Toba Montrose Dokie 1 Soda Lake Revenue EBITDA 45.0 25.0 30.0 15.0 15.0 5.0 -5.0 HS Orka Toba Montros

  8. Slide 8: Balance Sheet Highlights

    Alterra Power 2012 Results Call Financials | Lynda Freeman, Interim CFO Balance Sheet Highlights • Total assets increased 2% in 2012 • Predominantly due to cash resulting from share issuance of HS Orka ($37.5 MM) • Total liabilities fluctuate due to fair value adjustments for bonds and embedded deri

  9. Slide 9: Long Term Debt

    Alterra Power 2012 Results Call Financials | Lynda Freeman, Interim CFO Long Term Debt • Alterra’s total project debt (net interest) at December 31, 2012 was $369.6 MM, including: • Toba Montrose fixed rate debt (6.17% - 6.69%) with annual repayments until 2045 • Dokie Wind fixed rate debt (7.243%)

  10. Slide 10: Long Term Debt (cont'd)

    Alterra Power 2012 Results Call Financials | Lynda Freeman, Interim CFO Long Term Debt (cont’d) Interest Principal All values in $MM Toba Montrose (40%) HS Orka (66.6%) 15.0 15.0 12.5 12.5 10.0 10.0 7.5 7.5 5.0 5.0 2.5 2.5 0.0 0.0 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2013 2014 2015 2016

  11. Slide 11: Operations management team as of April 1

    Alterra Power 2012 Results Call Operations | Bruce Ripley, COO • Alterra’s operations management team as of April 1: Paul Rapp | Vice President, Wind and Geothermal Power Paul has significant experience in the development, construction and operations of renewable energy projects, and he led the succ

  12. Slide 12: Dokie 1 Wind Farm – Highlights

    Alterra Power 2012 Results Call Operations | Paul Rapp, VP Wind and Geothermal Power Location: British Columbia Dokie 1 Wind Farm – Highlights Capacity: 144 MW Ownership: 51% Alterra • 2012 production of 297 GWh of electricity (90% of budget) • 112% of budgeted generation in 2013 year to date • New

  13. Slide 13: Soda Lake Geothermal – Highlights

    Alterra Power 2012 Results Call Operations | Paul Rapp, VP Wind and Geothermal Power Location: Nevada Soda Lake Geothermal – Highlights Capacity: 15 MW Ownership: 100% Alterra • 83% of budgeted generation in 2012 (64 GWh)  Shortfall due to well startup delays • At end of February, plant is at 107%

  14. Slide 14: Svartsengi / Reykjanes – Highlights

    Alterra Power 2012 Results Call Operations | Paul Rapp, VP Wind and Geothermal Power Location: Iceland Svartsengi / Reykjanes – Highlights Capacity: 172 MW Ownership: 66.6% Alterra • 2012 production of 1,227 GWh (103% of budgeted generation) • First major planned maintenance on 50MW Reykjanes 2 unit

  15. Slide 15: Toba Montrose Hydro – Highlights

    Alterra Power 2012 Results Call Operations | Jay Sutton, VP Hydro Power Location: British Columbia Toba Montrose Hydro – Highlights Capacity: 235 MW Ownership: 40% Alterra • 95% of planned generation in 2012 (99% of forecast during peak period) • New partner: Fiera Axium Infrastructure • East Toba a

  16. Slide 16: ABW Solar – Highlights

    Alterra Power 2012 Results Call Operations | Murray Kroeker, VP, Solar Power and Engineering Location: Ontario ABW Solar – Highlights Capacity: 50 MW Ownership: 10% Alterra • Alterra prepared to purchase 10% of the 50 MW ABW solar project in southern Ontario • 80% of the 50MW plant is mechanically c

  17. Slide 17: Upper Toba Hydro Update

    Alterra Power 2012 Results Call Growth Opportunities | John Carson, CEO Location: British Columbia Upper Toba Hydro Update Capacity: 62 MW (1st phase) Ownership: 51% Alterra • Jimmie Creek (62 MW) is the first of two portions of the Upper Toba project • 40-year PPA with BC Hydro • Jimmie Creek const

  18. Slide 18: Reykjanes 3 + 4

    Alterra Power 2012 Results Call Growth Opportunities | John Carson, CEO Location: Iceland Reykjanes 3 + 4 Capacity: 80 MW (2 phases) Ownership: 66.6% Alterra • 50 MW Unit 3 + 30 MW Unit 4 • 50 MW Fuji turbine purchased / on site • Permit and EIA finalized • Start of construction currently depending

  19. Slide 19: Dokie 2 wind farm

    Alterra Power 2012 Results Call Growth Opportunities | John Carson, CEO Location: British Columbia Dokie 2 wind farm Capacity: 156 MW Ownership: 51% Alterra • 156 MW permitted wind farm • Permit and EIA finalized • Most First Nations agreements in place • Current partner: GE EFS (49%) • Currently se

  20. Slide 20: Mariposa Geothermal

    Alterra Power 2012 Results Call Growth Opportunities | John Carson, CEO Location: Chile (VII Region) Mariposa Geothermal Capacity: 320 MW inferred Ownership: 100% Alterra (a) • 320 MW inferred asset (a) Will adjust to 30% pending completion of EDC transaction • Prospective $58.3MM earn-in by EDC for

  21. Slide 21: MARCH www.alterrapower.ca www.alterrapower.ca

    MARCH Page | 21 2013 www.alterrapower.ca www.alterrapower.ca TSX : AXY

Alterra Power — FY2012 Earnings Presentation on 6ix