Southern Union Co

Southern Union — Calyon Utilities Conference 2005

23 slides from Southern Union's conference presentation, Dec 1, 2005

  1. Slide 1: Calyon Utilities Conference

    Slide 1: Calyon Utilities Conference

    NYSE: SUG Calyon Utilities Conference New York December 1, 2005

  2. Slide 2: Safe Harbor

    Slide 2: Safe Harbor

    Safe Harbor This presentation and other Company reports and statements issued or made from time to time contain certain “forward-looking statements” concerning projected financial performance, expected plans or future operations. Southern Union Company cautions that actual results and developments m

  3. Slide 3: Management Team

    Slide 3: Management Team

    Management Team Julie Edwards Senior Vice President & CFO Rick Marshall Vice President & Treasurer Jack Walsh Director of Investor Relations 3 1105-040

  4. Slide 4: Widespread Asset Base

    Slide 4: Widespread Asset Base

    Widespread Asset Base 4 0905-033 1105-040

  5. Slide 5: Natural Gas Distribution Assets Overview

    Slide 5: Natural Gas Distribution Assets Overview

    Natural Gas Distribution Assets Overview • Limited commodity price risk New England • History of constructive rate- Gas Company making, sharing and recovery mechanisms – Weather normalization in PG Energy Missouri Gas Energy Rhode Island • Highlights: – Nearly one million customers – Retail sales: 1

  6. Slide 6: Geographic Diversification Unified by Strong Operations

    Slide 6: Geographic Diversification Unified by Strong Operations

    Geographic Diversification Unified by Strong Operations Missouri Missouri Gas Gas Energy Energy PG PG Energy Energy New New England England Gas Gas Co. Co. • Headquartered in Kansas • Headquartered in • Headquartered in City, MO Wilkes-Barre, PA Providence, RI • Serves approximately • Serves approxi

  7. Slide 7: Panhandle Assets

    Slide 7: Panhandle Assets

    Panhandle Assets •• Panhandle Panhandle Eastern Eastern Pipe Pipe Line Line (PEPL) (PEPL) –– 6,340 6,340 mile, mile, 4-line 4-line system system –– 2.8 2.8 Bcf/d Bcf/d capacity capacity •• Trunkline Trunkline Gas Gas (TGC) (TGC) Detroit –– 3,578 3,578 mile, mile, 2-line 2-line system system Chicago

  8. Slide 8: CrossCountry Assets

    Slide 8: CrossCountry Assets

    CrossCountry Assets •• Transwestern Transwestern –– 2,400 2,400 mile, mile, bi-directional bi-directional flow flow system system –– 2.0 2.0 Bcf/d Bcf/d capacity capacity (1.2 (1.2 Bcf/d Bcf/d west; west; 800 800 MMcf/d MMcf/d east) east) –– 1.2 1.2 Bcf/d Bcf/d San San Juan Juan to to mainline mainl

  9. Slide 9: Growth Opportunities

    Slide 9: Growth Opportunities

    yl”, Growth Opportunities

  10. Slide 10: LNG Expansion Projects

    Slide 10: LNG Expansion Projects

    LNG Expansion Projects Overview Progress • Project costs of $269 million; • Phase I - $137MM $221 million spent to date, $48 – Construction underway million remaining – Double sendout capacity to 1.2 Bcf/d • All expansion capacity and – Increase storage capacity to 9.0 Bcf sendout fully contracted t

  11. Slide 11: FGT Phase VII Expansion

    Slide 11: FGT Phase VII Expansion

    SNG Cypress Project (Elba LNG) Pipeline Loop 24 Upgrade Existing Compression Pipeline Loop 26 Add Compressor Unit at Existing Station Pipeline Loop PROGRESS – HINES FGT Phase VII Expansion • In-service date – 3Q 2007 • Capacity increase of 100 MMcf/d to 160 MMcf/d • Capital costs – $60 MM to $100 MM

  12. Slide 12: Trunkline Texas Expansion

    Slide 12: Trunkline Texas Expansion

    Trunkline Texas Expansion • Up to 45 miles of 36” Angelina To Market Area pipeline Trinity Rapides NTX & ETX Newton Vernon • Capital cost of $90MM Avoyelles Polk Jasper to $110MM Tyler San Jacinto Beauregard Evangeline • Up to 600 MMcf/d of Longville Allen St. Landry new capacity Montgomery Kountze

  13. Slide 13: Transwestern Pipeline Phoenix Lateral

    Slide 13: Transwestern Pipeline Phoenix Lateral

    Transwestern Pipeline Phoenix Lateral Rockies Existing TW System Phoenix Lateral San Juan San Juan Expansion El Paso Natural Gas Ignacio Blanco Anadarko ARIZONA CALIFORNIA Thoreau Phoenix • 500+ MMcf/d capacity Permian • Capital cost of $500MM to $600MM • 258 miles of 36” pipe into Phoenix market •

  14. Slide 14: Project Summary

    Slide 14: Project Summary

    Project Summary Project Capacity Est. Cost Est. EBITDA In Service SUG Comments Name ($MM) ($MM) % Trunkline LNG 570 MMcf/d $137 $35 Early 2006 100% Under Phase I 3 Bcf storage construction Trunkline LNG 600 MMcf/d $82 $20 Mid 2006 100% Under Phase II construction Trunkline 600 MMcf/d $90 - $110 $20

  15. Slide 15: Regulation G Reconciliation

    Slide 15: Regulation G Reconciliation

    Regulation G Reconciliation Project Name Est. EBITDA ($MM) Est. DD&A ($MM) Est. Operating [Non-GAAP measure] Income ($MM) Trunkline LNG Phase I $35 $7 $28 Trunkline LNG Phase II $20 $4 $16 Trunkline North Texas $20 - $30 $1 - $2 $18 - $29 Florida Gas Phase VII $9 - $16 $2 - $3 $6 - $14 Transwestern

  16. Slide 16: Financial Highlights

    Slide 16: Financial Highlights

    yl”, Financial Highlights

  17. Slide 17: Segment Operating Income

    Slide 17: Segment Operating Income

    Segment Operating Income $275,000 $250,000 $225,000 $200,000 $175,000 ($000) $150,000 $125,000 $100,000 $75,000 $50,000 $25,000 $0 2002 2003 2004 2005 Distribution Transportation Note: Data shown represents fiscal years ended June 30, 2002 through 2004. 2005 represents trailing twelve months ended S

  18. Slide 18: Diluted EPS Growth Profile

    Slide 18: Diluted EPS Growth Profile

    EPS Growth Profile $2.00 $1.55 - $1.65 $1.41 - $1.46 $1.50 $1.24 Diluted EPS $1.00 $0.67 GR = 33.7% CA $0.50 $0.00 FY 2003 FY 2004 CY 2005E CY 2006E Note: All current and prior year EPS amounts have been adjusted to reflect the 5% stock dividend paid to shareholders on September 1, 2005. 18 1105-040

  19. Slide 19: Strong Earnings Potential

    Slide 19: Strong Earnings Potential

    Strong Earnings Potential • Drivers for Calendar 2005 • Drivers for Calendar 2006 – CCE Holdings investment – LNG expansions for full year - $45 to $50 • Approximately $54 to $57 million after tax million of operating – $17.5 million of revenue synergies split between – Remainder of synergies SUG an

  20. Slide 20: Hurricane Impact

    Slide 20: Hurricane Impact

    Hurricane Impact • Expected hurricane impact: – $11 to $13 million revenue loss primarily related to delayed LNG expansions and reduced flow on Sea Robin – Up to $5 million of additional expense related primarily to repair and replacement of equipment and potential abandonment on Sea Robin – Additio

  21. Slide 21: Respect for the Balance Sheet

    Slide 21: Respect for the Balance Sheet

    Respect for the Balance Sheet 100% • Investment grade ratings: 80% 50% – BBB at S&P 61% 71% 60% – BBB at Fitch 40% – Baa3 at Moody’s 20% 39% 50% • Strong internal equity 29% formation 0% 2003 2004 2005 Equity Debt Note: Debt/Cap as of June 30, 2003 and 2004 and September 30, 2005. SUG calculation pr

  22. Slide 22: Dividend Policy

    Slide 22: Dividend Policy

    Dividend Policy Background: • 12 consecutive annual 5% stock dividends • Implemented in 1994 to allow acquisition growth through leverage Policy review: • Recommendation to the Board of Directors to change to a $.32 per share annual cash dividend beginning in 2006 Rationale: • Confidence in future c

  23. Slide 23: Strategy to Drive Value

    Slide 23: Strategy to Drive Value

    Strategy to Drive Value • Efficiently manage existing assets • Optimize the use of leverage • Use free cash flow to help fund growth • Continue to integrate business units • Develop organic growth projects • Evaluate acquisitions and structural opportunities (MLP’s, etc.) 23 1105-040

Source: SEC EDGAR · 8-K filed Dec 1, 2005

More decks from Southern Union Co