Chaparral Energy Inc

Chaparral Energy — Investor Presentation (June 2012)

34 slides from Chaparral Energy's investor presentation, Jun 4, 2012

  1. Slide 1: RBC Investor Presentation June 2012

    RBC– Investor Presentation June, 2012

  2. Slide 2: Forward-looking statements

    This presentation contains "forward-looking statements" within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended. These forward-looking statements are subject to certain risks, trends and uncertainties that could

  3. Slide 3: Company Representatives

    3 Company Representatives Joe Evans Chief Financial Officer & Executive Vice President Mark Fischer Chief Executive Officer & President Earl Reynolds Chief Operating Officer & Executive Vice President John Zimmerman Director of Corporate Finance

  4. Slide 4: Chaparral Overview

    Chaparral Overview  Founded in 1988, Based in Oklahoma City  Core areas — Mid-Continent (Oklahoma) and Permian Basin (W. Texas)  Oil-weighted producer (64% oil; 36% gas); R/P ratio 18 years  Third largest oil producer in Oklahoma  Stable 1P base with large potential Upside of 749MMBoe  Near-te

  5. Slide 5: Operating Areas

    5 Operating Areas* As of December 31, 2011 (SEC) Core Area Growth Area Acreage Field Offices Headquarters North Texas Reserves: 3.9 MMBoe, 3% of total Production: 0.5 Mboe/d, 2% of total Permian Basin Reserves: 19.3 MMBoe, 12% of total Production: 3.6 MBoe/d, 15% of total Company Total December 2011

  6. Slide 6: Strong Record of Reserve and Production Growth

    Strong Record of Reserve and Production Growth Year-End SEC Reserves (MMBoe) (1) 2003 – 2011 CAGR = 15% Annual Production (MMBoe) 2003 – 2011 CAGR = 16% Chaparral’s reserve replacement ratio averaged 422% per year since 2003 6 Year Oil Gas 2007 $96.01 $6.80 2008 $44.60 $5.62 2009 $61.18 $3.87 2010 $

  7. Slide 7: Financial Position to Execute Strategy

    Net Debt / EBITDA Liquidity ($mm) Financial Position to Execute Strategy 1) 7.625% Senior Notes issued on 4/18/12 2) Assumes Bonds Issued on Pro-Forma basis as of 3/31/12  Strong Financial Position  No senior note maturities before 2020  Hedge positions in place to secure cash flow in near term 

  8. Slide 8: Capital Budget

    Capital Budget ($mm) Component 2008 2009 2010 2011 2012 Budget 2012 % Drilling $168 $76 $196 $172 $131 40% EOR 24 14 36 86 127 38% Enhancements 53 32 39 32 26 8% Acquisitions 46 18 41 17 15 5% Other (P&E, Capitalized G&A, etc) 48 14 32 28 31 9% Total $339 $154 $344 $336 $330 100% Key Drilling Areas

  9. Slide 9: Resource Potential

    Resource Potential Chaparra

  10. Slide 10: Substantial Resource Potential for Near-Term and Long-Term Growth

    Substantial Resource Potential for both Near-Term and Long-Term Growth 10 Near-Term  Conventional Drilling (ROR 50% - 75%)  Anadarko Granite Wash  Anadarko Cleveland Sand  Unconventional Resource Play Drilling (ROR 35% - 75%)  Northern Oklahoma Mississippi Play (NOMP) 280,000 acres  Panhandle

  11. Slide 11: Well Positioned for Near-Term and Long-Term Growth

    11 Well Positioned for Near-Term and Long-Term Growth NOMP 150 Million Barrels EOR 200 Million Barrels  Key near-term growth driver  Shallow oil target  Attractive F&D costs  Extensive history of vertical drilling  Long-term growth driver  Low-risk, stable production  Expertise to execute str

  12. Slide 12: NOMP: A Key Near-Term Focus Area

    12 NOMP: A Key Near-Term Focus Area  ~280,000 Net Acres  Wildhorse Concession gives Chaparral exclusive rights to 138,000 acres  Drilled 18 wells to date  17 wells planned in 2012  Play Economics:  IP rates: 200 – 500 Boe/d  EURs: 200 – 400 MBoe  Well costs: $2.5 - $4.0mm Percent Oil: 60 – 8

  13. Slide 13: Northern Oklahoma Mississippi Play

    Northern Oklahoma Mississippi Play KS OK 13 Chaparral Emerging Area Chaparral Core Area Chaparral Acreage as of 4/9/12

  14. Slide 14: NOMP: Recent Results

    14 NOMP: Recent Results  2012 Capital - $42mm  NOMP Core (113,000 Net Acres)  Significant industry activity in the play  Drilled 14 wells to date; 4 currently drilling  5-10 additional wells in 2012 and 1 SWD  Average IP 590 Boepd  46% Oil  Emerging NOMP (167,000 acres)  167,000 Net Acres 

  15. Slide 15: Panhandle Marmaton

    • Unit’s average 30 day IP + 238 Boe/d • Unit’s average reserves 130 MBoe (76% oil, 14% NGL, 10% gas) • Unit’s average CWC: $2.0mm • Average depth to Marmaton 6600’ Chaparral continues to lease in the play and currently has ~40,000 confirmed net acres in the Emerging Marmaton Play Marmaton Vertical

  16. Slide 16: Chaparral: A Growing Mid-Continent CO2 EOR Company

    16 Chaparral: A Growing Mid-Continent CO2 EOR Company

  17. Slide 17: Long Life EOR Assets in Four Key Growth Areas

    17 Long Life EOR Assets in Four Key Growth Areas Panhandle Area Permian Basin Central Oklahoma Area Burbank Area  200+ MMBoe Potential Reserves  Low Geologic Risk  Attractive Economics  ROR – 25% to 40%  ROI – 2.5:1 to 3.5:1  Capital Requirements - $75-$125mm/yr  Long-term growth potential -

  18. Slide 18: Currently Owned CO2 Development Potential and Infrastructure

    18 Currently Owned CO2 Development Potential and Infrastructure Total OOIP 3,735 MMBo Primary Production 628 MMBo Secondary Recovery 597 MMBo Tertiary Potential 410 MMBo Net Tertiary Potential 197 MMBo Existing CELLC CO2 Pipelines Existing Third Party CO2 Pipelines Planned CELLC CO2 Pipelines Propos

  19. Slide 19: EOR 2012 Capital Budget

    EOR 2012 Capital Budget(1) 19 Budget by Category ($mm) 2011 Actual 2012 Budget Infrastructure / Pipelines $14 $90 Drilling 17 13 Enhancements / CO2 Purchases 52 24 Total $83 $127  Panhandle Area  Camrick Area $16.4  Farnsworth Unit 25.2  NE Hardesty (Non-op) 2.0  Booker Area 3.8  Other 1.8 Tot

  20. Slide 20: Processing Rate: The Key to Improved Rate of Return

    Processing Rate: The Key to Improved Rate of Return 20 Hovey Morrow Unit (HMU) Time BOP D 25% hcpv Inj./Yr 10% hcpv Inj./Yr HMU Model: Processing Rate v. Reserve Recovery • CO2 Injection initiated Sep’07 • Processing Rates Average 25% hcpv Inj./Yr

  21. Slide 21: North Burbank CO2 Development

    21 North Burbank CO2 Development

  22. Slide 22: Burbank Area Potential CO2 Projects

    22 Burbank Area Potential CO2 Projects Total OOIP 1,163 MMBo Primary Production 239 MMBo Secondary Recovery 211 MMBo Tertiary Potential 119 MMBo Net Tertiary Potential 100 MMBo Burbank Area: Net Potential: 100 MMBoe, 51% of total

  23. Slide 23: Burbank in Perspective

    Burbank in Perspective 23 Secondary Development Primary Development B O P D Tertiary Development “Business Plan” 110 Years

  24. Slide 24: Other Recently Installed CO2 Injection Projects

    24 Other Recently Installed CO2 Injection Projects

  25. Slide 25: EOR: Recent Uplift from Operations

    25 EOR: Recent Uplift from Operations +250 BOPD +200 BOPD +150 BOPD +200 BOPD

  26. Slide 26: EOR: Strong Growth – Currently Active Projects

    EOR: Strong Growth – Currently Active Projects 26 4-year CAGR ~ 24%

  27. Slide 27: Other Developing Drilling Plays

    Other Developing Drilling Plays

  28. Slide 28: Total Potential: Near-term and Long-term Strategy

    28 Approximately 750 MMBoe Potential  Near-term + Long-term strategy yields significant value increase  ~ 70% Oil  Near-term focus on NOMP  De-risk play, unlock value  Production growth  Long-term focus on EOR  Low-risk production upside  Long-life, stable production * Woodford, Bone Spring,

  29. Slide 29: Financial Performance, Projections and Credit Statistics

    Financial Performance, Projections and Credit Statistics 29

  30. Slide 30: Financial Summary

    30 Financial Summary 2009 2010 2011 1Q 2012 Price Oil & NGL – Wellhead ($/Bbl) $55.04 $74.53 $87.52 $88.38 Gas – Wellhead ($/Mcf) $3.51 $4.36 $4.08 $2.39 Production (MMBoe) 7.6 8.1 8.7 2.1 Oil & NGL (MMBbls) 3.9 4.0 5.0 1.3 Gas (Bcf) 22.6 23.7 21.6 4.8 Financial Data ($mm) Operating Expenses: Lease

  31. Slide 31: Financial Metrics per Boe

    Financial Metrics per Boe Production (Boe) / Day LOE / Boe EBITDA / Boe G&A / Boe 31 19,323 20,926 22,055 23,713 23,278 0 10,000 20,000 30,000 2008 2009 2010 2011 Q1, 2012 $17.04 $12.32 $13.18 $14.03 $14.61 $0 $5 $10 $15 $20 2008 2009 2010 2011 Q1, 2012 $3.16 $3.11 $3.72 $4.86 $6.35 $0 $2 $4 $6 $8 2

  32. Slide 32: Operating Statistics: 2011 Results and 2012 Guidance

    Operating Statistics 2011 Results 2012 Guidance Capital Expenditures $336mm $330mm Production 8.7 MMBoe 8.8 - 9.0 MMBoe General and Administrative $4.86/Boe $5.00 - $5.50/Boe Lease Operating Expense $14.03/Boe $14.25 - $14.75/Boe 2011 Results and 2012 Guidance 32

  33. Slide 33: Hedge Portfolio

    Hedge Portfolio Note: 1) Dollars represent average strike price Gas Basis Hedges Price % Gas Proved Jun - Dec 2012 $0.23 85% 2013 $0.20 84% 2014 $0.23 70% $7.02 $7.24 $7.34 $69.10 $69.94 $68.40 $10.00 % of Total Proved Reserves Hedged (As of May 9, 2012) $90.46 33 $4.57 $4.52 $3.84 $94.56 $102.45 $

  34. Slide 34: Question & Answer

    Question & Answer Chaparral