Kinross Gold Corporation · TSX:K

Kinross Gold — Scotiabank Mining Conference 2019

56 slides from Kinross Gold's conference presentation, Dec 3, 2019

  1. Slide 1: Delivering Value.

    December 2019 Delivering Value. Kinross Gold Corporation

  2. Slide 2: Cautionary Statement on Forward-Looking Information

    Cautionary Statement on Forward-Looking Information All statements, other than statements of historical fact, contained or incorporated by reference in or made in giving this presentation and responses to questions, including but not limited to any information as to the future performance of Kinross

  3. Slide 3: Kinross Value Proposition

    Kinross Value Proposition Operational Excellence Financial Strength & Flexibility Diverse portfolio of operating mines consistently Leveraging our financial strength to invest in our meeting or outperforming operational targets development pipeline Repaid over $1.0 billion of debt 7 Consecutive Met

  4. Slide 4: Operational Excellence

    Operational Excellence We remain focused on operational excellence, building a culture of continuous improvement, innovation and disciplined cost management 4

  5. Slide 5: Diversified Portfolio of Assets

    Operational Excellence December 2019 Diversified Portfolio of Assets ~60% of 2019E gold equivalent production expected from mines located in the Americas Dvoinoye, Russia Kupol, Fort Knox, USA Russia Bald Mountain, USA Round Mountain, USA Tasiast, Mauritania 2019E Gold Equivalent Production(1,2) 20%

  6. Slide 6: On Track to Meet Guidance Targets

    Operational Excellence December 2019 On Track to Meet Guidance Targets Continued track record of meeting or outperforming our operational targets • Strong production and excellent cost performance from the portfolio • On track to meet 2019 guidance targets for production, cost of sales, all-in susta

  7. Slide 7: 2019E Outlook

    Operational Excellence December 2019 2019E Outlook(2) Kinross Total(1) Regional Guidance 2019E Unit Costs ($ per gold equivalent ounce)(2,3) Tracking towards the low end of cost of sales guidance 2.5 million Americas (+/- 5%) 1.44 million Cost of sales $730/oz. (+/- 5%) 2019E Gold Equivalent Product

  8. Slide 8: Third Quarter Operational Highlights

    Operational Excellence December 2019 Third Quarter Operational Highlights In the first nine months of 2019, our three largest operations produced over 60% of total production with an average cost of sales of $619/oz.(3) Operation YTD Performance(3) Highlights Kupol-Dvoinoye, Russia Production (Au. e

  9. Slide 9: Achieving Performance Improvements at Paracatu

    Operational Excellence December 2019 Achieving Performance Improvements at Paracatu Realizing the benefits of asset optimization and continuous improvement efforts through strong performance and cost reduction Strong performance year-to-date driven by: • Asset optimization program, resulting in bett

  10. Slide 10: Continued Strong Performance at Tasiast

    Operational Excellence December 2019 Continued Strong Performance at Tasiast Strong performance year-to-date highlights the benefits of the Phase One expansion, resulting in higher production and improved costs • Significant improvement in Tasiast’s performance following completion of the Phase One

  11. Slide 11: Strong Performance at Kupol-Dvoinoye

    Operational Excellence December 2019 Strong Performance at Kupol-Dvoinoye Consistent, low-cost operations Q3 highlights • Achieved the lowest cost of sales per ounce in the portfolio in Q3 2019 • Production increased compared with Q2 2019, a result of higher grades Russia Results YTD 2019 2019 Guida

  12. Slide 12: Financial Strength & Flexibility

    Financial Strength & Flexibility With strong cash flow and no debt maturities until 2021, we have the financial strength and flexibility to fund our pipeline of development projects 12

  13. Slide 13: Third Quarter Financial Highlights

    Financial Strength & Flexibility December 2019 Third Quarter Financial Highlights Capturing the benefits of higher gold prices and improved cost performance Year-over-year improvements Third quarter performance 21% Average realized gold price Increased revenue, cash flow and increase ($ per Au oz.)

  14. Slide 14: Strong Liquidity Position

    Financial Strength & Flexibility December 2019 Strong Liquidity Position Strong position to finance organic development projects with existing liquidity and cash flow generation Financial Flexibility Liquidity Position ($ billion) • Available liquidity of $1.8 billion • Manageable debt schedule with

  15. Slide 15: Manageable Debt Profile

    Financial Strength & Flexibility December 2019 Manageable Debt Profile No debt maturities prior to 2021 Debt Schedule Debt Ratings Revolving credit facility (drawn amounts) Senior notes Agency Rating S&P BBB- (Stable) (i) $120 Moody’s Ba1 (Positive) Fitch BBB- (Stable) $500 $500 $500 Interest Rates

  16. Slide 16: Development Projects & Exploration Highlights

    Development Projects & Exploration Highlights We have a portfolio of development projects that we are progressing, and we are also focused on advancing a pipeline of future opportunities and high potential exploration targets 16

  17. Slide 17: Tasiast 24k Project Feasibility Study Results

    Development Projects December 2019 Tasiast 24k Project Feasibility Study Results Proceeding with value-enhancing Tasiast 24k project, which offers attractive returns, increased production and lower costs Operating Estimates Throughput capacity 24,000 t/d Average annual production (2022 – 2028) 563,0

  18. Slide 18: Low-Capital Continuous Improvement Approach

    Development Projects December 2019 Low-Capital Continuous Improvement Approach Increase to throughput through debottlenecking initiatives, plant upgrades and optimization of the mine plan and processing circuit Building off success of Phase One and Project Overview continued outperformance of the SA

  19. Slide 19: Advancing the Tasiast 24k Project

    Development Projects December 2019 Advancing the Tasiast 24k Project Well-positioned to execute the 24k project Low relative execution risk • Project plan leverages Kinross’ experience successfully building and operating Phase One • Less infrastructure requirements • Permits in place for the 24k pro

  20. Slide 20: Tasiast Project Financing Update

    Development Projects December 2019 Tasiast Project Financing Update Project financing received IFC Board approval, an important milestone towards completion • Targeting approximately $300 million in financing • Participation from IFC, a member of the World Bank Group, Export Development Canada (EDC)

  21. Slide 21: Chulbatkan On Track to Close Early 2020

    Development Projects December 2019 Chulbatkan On Track to Close Early 2020 Near-surface, relatively high-grade, open-pit, heap leachable deposit with large estimated resource • Expected to be a substantial gold mine with a low all-in sustaining cost Excellent fit for Kinross • Preliminary estimates;

  22. Slide 22: Overview of the Chulbatkan Resource

    Development Projects December 2019 Overview of the Chulbatkan Resource Near-surface, high-grade, open-pit, heap leachable deposit with large estimated resource • Near surface, highly continuous • Current resource extends to ~375m, with grades mineralization increasing at depth • Estimated mineral re

  23. Slide 23: Significant Upside Opportunities at Chulbatkan

    Development Projects December 2019 Significant Upside Opportunities at Chulbatkan Kinross plans to undertake a robust exploration program with a focus of defining and further extending the resource • Current resource estimate limited to extent of drilling completed to date  Significant drilling end

  24. Slide 24: Chulbatkan Regional Exploration Upside

    Development Projects December 2019 Chulbatkan Regional Exploration Upside Numerous untested potential targets within the ~120km2 exploration license • Multiple structural environments analogous to Chulbatkan deposit • Multiple downstream placer gold occurrences indicate hard rock sources within lice

  25. Slide 25: Nevada Projects Now Complete

    Development Projects December 2019 Nevada Projects Now Complete Construction and commissioning of the Bald Mountain Vantage Complex and Round Mountain Phase W complete Bald Mountain Round Mountain • Severe weather and poor vendor • During Q3, fleet prioritized to mitigate wall performance earlier th

  26. Slide 26: Fort Knox Gilmore

    Development Projects December 2019 Fort Knox Gilmore Gilmore project expected to extend mine life to 2030 and strengthen long-term U.S. production profile 26

  27. Slide 27: Gilmore Feasibility Study Results

    Development Projects December 2019 Gilmore Feasibility Study Results Project expected to generate a 17% IRR at an assumed gold price of $1,200 per ounce Current mine plan + Gilmore estimates Average annual production (2018-2027) 245,000 gold ounces Production cost of sales (2018-2027)(3) $735 per go

  28. Slide 28: Fort Knox Gilmore

    Development Projects December 2019 Fort Knox Gilmore Initial production from Gilmore is expected in early 2020 • Advancing on budget and on schedule • Heap leach construction and dewatering activities planned for 2019 are now complete  Will recommence in the spring of 2020 • Stripping commenced in

  29. Slide 29: Chile Projects

    Development Projects December 2019 Chile Projects We are evaluating the potential for a return to production in Chile La Coipa Restart Project N • Feasibility study results expected to be released in February 2020 La Coipa Restart project Lobo-Marte Project • Scoping study completed in Q1 2019 with

  30. Slide 30: Kupol-Dvoinoye Exploration Highlights

    Exploration Highlights December 2019 Kupol-Dvoinoye Exploration Highlights 2019 exploration program continues to Kupol West Licence N progress well NE-EXT • Kupol exploration program focused on Kupol Mining Licence high potential targets NE NU  Kupol main and hanging wall zones: Kupol Mine NZ resul

  31. Slide 31: Another 1-Year Mine Life Extension in Russia

    Exploration Highlights December 2019 Another 1-Year Mine Life Extension in Russia Continuing our track record of adding reserves to offset depletion at Kupol and Dvoinoye (4) Cumulative Production (Au eq.) Proven and Probable Reserves (Au eq.) 7.4 2.1 2018 • Estimated mill production extended to 6.9

  32. Slide 32: Chirano Exploration Highlights

    Exploration Highlights December 2019 Chirano Exploration Highlights Production at Chirano is expected to extend to 2021, a 1-year extension • 2018 exploration focus continued to be adding incremental ounces to mine life  Focused on infill drilling the depth potential at Akwaaba and Paboase • Follow

  33. Slide 33: Compelling Relative Value

    Compelling Relative Value Attractive value opportunity relative to peers, considering Kinross’ annual production, cost structure, track record and growth opportunities 33

  34. Slide 34: 2018A Production & All-In Sustaining Cost

    Compelling Relative Value December 2019 2018A Production & All-In Sustaining Cost 2018A Production 2018A All-In Sustaining Cost (million ounces) ($ per ounce) $1,200 5.0 $1,000 4.0 $800 3.0 $600 2.0 $400 1.0 $200 0.0 $0 Newmont Barrick Newmont Barrick Yamana Yamana AngloGold Gold Fields Gold Fields

  35. Slide 35: 2019E Metrics

    Compelling Relative Value December 2019 2019E Metrics Attractive value opportunity relative to peers, considering Kinross’ annual production, cost structure, track record and growth opportunities EV / 2019E EBITDA P / 2019E Operating CF 14.7 15.9 9.1 9.7 8.8 9.3 6.9 6.8 6.7 5.8 5.8 5.4 5.2 5.0 5.0 4

  36. Slide 36: Appendix

    Appendix 36

  37. Slide 37: Responsible & Safe Tailings Management

    Appendix December 2019 Responsible & Safe Tailings Management All of our tailings facilities are designed and constructed to the highest engineering standards and meet or exceed regulatory and international requirements and standards of best practice • Tailings management programs incorporate Paraca

  38. Slide 38: 2019E Capital Expenditures

    Appendix December 2019 2019E Capital Expenditures(2) • 2019 capital expenditures are expected to be $1,050 million (+/- 5%), including estimated capitalized interest of $65 million 2019E 2019E Total 2019E Capital Region Sustaining Capital Non-Sustaining Capital (+/- 5%) Americas $375 $295 $670 West

  39. Slide 39: Currency & Oil Sensitivities

    Appendix December 2019 Currency & Oil Sensitivities 2019 Budget Assumptions(2) 2019 Sensitivities (net of hedges)(2) Change from Estimated impact 2019 Budget Current Spot(i) Assumptions to cost of sales Gold US$1,200 US$1,453 FX 10% US$18/oz. (per ounce) Russian rouble 10% US$19/oz.(ii) Oil US$65 US

  40. Slide 40: Fort Knox, USA (100%)

    Americas December 2019 Fort Knox, USA (100%) The Gilmore project is expected to extend mine life to 2030 • Successfully operating one of the world’s Operating Results(3) few cold weather heap leaches 2018 YTD 2019 • Estimated mine life: mill – 2020; mining – 2027; leaching – 2030 Production 255,569

  41. Slide 41: Summary of Feasibility Study Results

    Fort Knox Gilmore December 2019 Summary of Feasibility Study Results Operating Estimates (current mine plan + Gilmore) Incremental Gilmore Estimates(i) Timeline Operational Metric Estimate Estimate Average annual tonnes mined 60 million Strip ratio 1.2 Strip ratio 1.2 Life of mine ore processed 183

  42. Slide 42: Round Mountain, USA (100%)

    Americas December 2019 Round Mountain, USA (100%) Strong cash flow generator with Phase W project extending mine life to 2027 • Phase W is expected to generate solid Operating Results(3) returns and extend mining 2018 YTD 2019 • Estimated mine life: 2024 (mining); 2027 (stockpile milling / residual

  43. Slide 43: Summary of Feasibility Study Results

    Round Mountain Phase W December 2019 Summary of Feasibility Study Results Operating Estimates (current mine plan + Phase W) Standalone Phase W Estimates Timeline Operational Metric Estimate Estimate Strip ratio 2.9 Life of mine production 1.5 million ounces Average grade processed 0.7 grams per tonn

  44. Slide 44: Bald Mountain, USA (100%)

    Americas December 2019 Bald Mountain, USA (100%) Forecasting strong near-term cash flow with significant upside potential • Large estimated mineral resource base with Operating Results(3) multiple sources of potential mineral reserve 2018 YTD 2019 additions • Estimated mine life: 2023 Production 284

  45. Slide 45: Paracatu, Brazil (100%)

    Americas December 2019 Paracatu, Brazil (100%) Large gold mine with a long mine life that extends to 2032 • Paracatu is among the world’s largest gold Operating Results(3) operations with annual throughput of ~60Mt 2018 YTD 2019 • Cornerstone asset in Kinross’ portfolio Production • Estimated mine l

  46. Slide 46: La Coipa Restart Project PFS Results (2015)

    Americas December 2019 La Coipa Restart Project PFS Results (2015) Project expected to generate a 20% IRR at an assumed gold price of $1,200 per ounce • The pre-feasibility study estimates a 5.5 year mine life, following commencement of stripping  Processing expected to commence 1.5 years after pre

  47. Slide 47: Kupol-Dvoinoye (100%)

    Russia December 2019 Kupol-Dvoinoye (100%) Our Russian mines are a model for successfully operating in a remote location • High-grade, low-cost underground mines Operating Results(3) supported by 1 mill 2018 YTD 2019 • Estimated mine life: 2023, following another Production 1-year extension in 2018

  48. Slide 48: Chulbatkan Project Location

    Russia December 2019 Chulbatkan Project Location Khabarovsk is industrialized and has a well-established mining and exploration sector Mining-friendly jurisdiction Kupol • Several gold producers active in the region Magadan  Ten operating mines Khabarovsk  Fourth largest gold producing region in R

  49. Slide 49: Deep Experience In-Country

    Russia December 2019 Deep Experience In-Country Kinross has a long and successful 24-year track record investing in Russia Significant operating experience 2018 Statistics: Kinross • Operated 4 mines, including the high-grade, low cost investments in Russia Kupol and Dvoinoye mines 98.5% of employee

  50. Slide 50: Foreign Investment in Russia

    Russia December 2019 Foreign Investment in Russia The world’s leading companies are Foreign Investment Advisory Council invested in Russia • Chaired by the Russian Prime Minister, includes CEOs from over 50 international companies 50

  51. Slide 51: Tasiast, Mauritania (100%)

    West Africa December 2019 Tasiast, Mauritania (100%) Operating mine with a large gold resource located in a prospective district • Successfully completed the Phase One Operating Results(3) expansion in 2018 2018 YTD 2019 • Advancing the 24k project to further Production increase throughput (Au Eq. o

  52. Slide 52: Feasibility Study Results: Operating Estimates

    Tasiast 24k Project December 2019 Feasibility Study Results: Operating Estimates Results Highlights Life of Mine Estimates (2020-2033) Timeline Operational Metric Estimate Operational Metric Estimate Total material mined 375,900,000 Total tonnes mined 628,800,000 Strip ratio 5.9 Total ore mined (ton

  53. Slide 53: Feasibility Study Results: Capital & Economics

    Tasiast 24k Project December 2019 Feasibility Study Results: Capital & Economics Estimated Initial Capital Cost Estimated Sustaining Capital • Expected to be approximately $30M per year Estimate ($ millions) Life of Mine estimate ($ millions) Support infrastructure 47 Mobile maintenance 150 Process

  54. Slide 54: Chirano, Ghana (90%)

    West Africa December 2019 Chirano, Ghana (90%) Cost reduction achieved at Chirano by transitioning to self-perform • Chirano is an underground and open pit Operating Results(1,3) operation located in southwestern Ghana 2018 YTD 2019 • Estimated mine life: 2021 Production 204,029 137,087 (Au Eq. oz.)

  55. Slide 55: Endnotes

    Appendix December 2019 Endnotes 1) Unless otherwise noted, gold equivalent production, gold equivalent ounces sold and production cost of sales figures in this presentation are based on Kinross’ 90% share of Chirano production and sales. Also unless otherwise noted, dollar per ounce ($/oz.) figures

  56. Slide 56: Slide 56

Kinross Gold — Scotiabank Mining Conference 2019 on 6ix