Tantalex Lithium Resources Corp · CSE:TTX

Tantalex Lithium Resources — Investor Presentation (November 2022)

17 slides from Tantalex Lithium Resources's investor presentation, November 2022

  1. Slide 1: Minerals That Are Shaping Our World

    Minerals That Are Shaping Our World Corporate Presentation Q3 2022

  2. Slide 2: Safe Harbour Statement

    Safe Harbour Statement Certain statements in this presentation constitute “forward-looking statements” within the meaning of the Private Securities Litigation Reform Act of 1995 and Canadian securities legislation. Such forward-looking statements involve known and unknown risks, uncertainties and ot

  3. Slide 3: The Opportunity

    The Opportunity  Early Stage Exploration and Development with near term production assets.  Relative newcomer into Lithium Market with low market cap  Initiated Feasibilty Study on Manono Tailings Project for a 100ktpa production of 6% Li2O Spodumene Concentrate (LOM of 6-8 years)  High discover

  4. Slide 4: Focused on 3 Metals, All Facing Critical Shortages

    Lithium  Lithium-ion will be the leading technology in the electric vehicle (EV) industry. Focused on 3 Metals, All  Market will be supply-constrained until into 2030.  CAGR of 19% year on year 2022 to 2027, from 119,000 MT to 292,000 MT Facing Critical Shortages of lithium LCE. The EV industries

  5. Slide 5: Developing Lithium, Tin and Tantalum Projects in Africa

    Developing Lithium, Tin and Tantalum Projects in Africa. Manono Tailings project Tailings Reclamation containing Lithium, Tin and Tantalum. Mineral Resource Estimate expected for November 2022. Pegmatite Corridor Exploration project Extensive hard rock Lithium potential immediately adjacent and down

  6. Slide 6: Board of Directors

    Board of Directors Hadley Natus Eric Allard Dr. Luisa Moreno Yves Kabongo Simon Collins Klaus Eckhof Matthew Botell Chairman CEO Director Director Director Director Director Founder of Afrimet Geologist, with 20 A PhD, experienced A Congolese native A commodities A geologist with over 25 years exper

  7. Slide 7: Management

    Management Kyle Appelby Jeffrey Lindhorst Jose Alberto Abad Hannes Miller CFO Head of DRC Country COO Exploration Manager Kyle has held An Australian Jose has over 20 Over 40 years of executive roles in geologist with over 30 years experience in experience focused public and private years experience

  8. Slide 8: Manono Tailings Project

    Manono Tailings Project PATH FORWARD  Maiden Resource Estimate to be released – November 2022  Appointment of Engineering Firm to conduct PEA and PFS. PFS scheduled for completion in June 2023.  Environmental & Social impact Assessment (ESIA) commenced October 2022 –  Phase 2 Metallurgical tests

  9. Slide 9: Manono Tailings Project

    Manono Tailings Project Phase 1 of the Manono Tailings project will focus on exploitation of the southwest dumps, namely dumps K, G, and I. Dump C will be considered in a Phase 2 program. Phase 1 mine life evaluated at 6.5 years producing 100, 000 tons of SC per year.  Heavy Liquid Separation (“HLS

  10. Slide 10: Pegmatite Corridor Exploration Project

    Pegmatite Corridor Exploration Project  Located southwest of a proven 400 million mt resource which extends throughout our licences 12447 and 12448  25 km long, 5 km wide corridor, which has been defined by an aeromagnetic survey.400Mt Li resource Li-Sn-Ta deposit located 9km to the northeast, alo

  11. Slide 11: TiTan Project

    TiTan Project  A tin and tantalum alluvial rich area sitting above the pegmatite corridor in license 12447  Transformation of licence to a mining concession received in October 2022.  Plant and heavy machinery already mobilized to Manono. 120 days planned for plant construction and 30 days for co

  12. Slide 12: Project timeline

    Aug22 Sep22 Oct22 Nov22 Dec22 Jan22 Feb22 Mch22 Apr22 May22 TiTan plant construction TiTan plant commissioning TiTan production of Sn and Ta concentrates Manono Tailings MRE issuance Manono Tailings Phase 2 Metallurgy Test work and report Manono Tailings PEA issuance Pegmatite Corridor Geology Mappi

  13. Slide 13: Our Vision

    tantalex lithium resources Our Vision PROSPERITY “> SUSTAINABLE FARMING “EDUCATION “IMPROVED INFRASTRUCTURE TANTALE i EDUCATIONAL FARM

  14. Slide 14: Share information

    Share information Capital Share Structure Common Shares ISSUED as of Oct 15th, 522 785 256 2022 Options & RSU 49 150 000 Warrants 2 500 000 Reserved for Issuance 121 613 912 Fully Diluted 651 814 168

  15. Slide 15: Market Capitalization of Peer Hard Rock Lithium Developers

    Market Capitalization of Peer Hard Rock Lithium Developers (as of Sept 20, 2022) Global Grade Mineral Contained Market Cap Company Project Location Stage (%Li2O) Resource LCE (mt) (USD) Estimate (mt) Exploration- MRE to be Tantalex Lithium Manono Tailings DRC $39M confirmed Exploration-MRE Atlantic

  16. Slide 16: Highlights

    Highlights Lithium, Tin and Greenfield Near term Tantalum tailings exploration potential production of Tin deposit above in a prominent and Tantalum ground lithium district concentrates Experienced Results driven Sustainable management board of development of team directors our resources

  17. Slide 17: Thank you!

    Thank you! For more information, please contact us. www.tantalex.ca info@tantalex.ca follow us

Tantalex Lithium Resources — Investor Presentation (November 2022) on 6ix