  1. Slide 1: Experts Working Group Meeting n°4

    Experts Working Group Meeting n°4 A.S. provided by distributed resources – 2014 & 2015 24/06/2013 Elia ENMAN 24/06/2013 Experts WG - meeting n° 4

  2. Slide 2: Agenda

    Agenda 1. Validation MoM 3rd Expert WG of 14/05 2. Feedback from previous meetings / overall status & objective 3. Timing 4. Procedures: • Prequalification DSO: pre-prequalification/final template/exclusion rules (DSO) • Prequalification TSO (Elia) • Activation (Elia) 5. Contractual framework • Cont

  3. Slide 3: Agenda

    Agenda 1. Validation MoM 3rd Expert WG of 14/05 2. Feedback from previous meetings / overall status & objective 3. Timing 4. Procedures: • Prequalification DSO: pre-prequalification/final template/exclusion rules (DSO) • Prequalification TSO (Elia) • Activation (Elia) 5. Contractual framework • Cont

  4. Slide 4: Agenda

    Agenda 1. Validation MoM 3rd Expert WG of 14/05 2. Feedback from previous meetings / overall status & objective 3. Timing 4. Procedures: • Prequalification DSO: pre-prequalification/final template/exclusion rules (DSO) • Prequalification TSO (Elia) • Activation (Elia) 5. Contractual framework • Cont

  5. Slide 5: Main events since last Expert WG

    Main events since last Expert WG 4th Expert Working Group meeting 24/06/2013 Elia ENMAN

  6. Slide 6: The pathway to contractualization…

    The pathway to contractualization… May 23rd - ATRIAS meeting  consensus between DSOs and ELIA on principles and pragmatic approach for implementing R3 DP in 2014  Standard contract DSO-BSP needed , regional regulatory approval required  Principle of net load reduction maintained  Prequalificatio

  7. Slide 7: The pathway to contractualization…(ctn’d)

    The pathway to contractualization…(ctn’d) Meanwhile …  Synergrid prepared draft version BSP-DSO contract for review  Meeting DSO & ELIA on contract DSO-BSP  June 21st – Proposal contract BSP-DSO sent to regulators  ELIA prepared ELIA-BSP contract Next steps:  June 27th : TF Balancing  June 28t

  8. Slide 8: Agenda

    Agenda 1. Validation MoM 3rd Expert WG of 14/05 2. Feedback from previous meetings / overall status & objective 3. Timing 4. Procedures: • Prequalification DSO: pre-prequalification/final template/exclusion rules (DSO) • Prequalification TSO (Elia) • Activation (Elia) 5. Contractual framework • Cont

  9. Slide 9: Proposal Timing Tendering R3 DP

    Proposal Timing Communication DSO prequalification Tendering R3 DP decision 20/9/2013 Design Freeze Communication 17/4/2013 selection BSP 11/10/2013 Contract notice R3 DP Tendering R3 DP first R3 DP ready to start 7/6/2013 Results 1/12/2013 23/9/2013 R3 DP tendering starts Official start R3 DP 1/7/2

  10. Slide 10: Agenda

    Agenda 1. Validation MoM 3rd Expert WG of 14/05 2. Feedback from previous meetings / overall status & objective 3. Timing 4. Procedures: • Prequalification DSO: pre-prequalification/final template/exclusion rules (DSO) • Prequalification TSO (Elia) • Activation (Elia) 5. Contractual framework • Cont

  11. Slide 11: Prequalification procedure Contact Details

    Prequalification procedure Contact Details System Grid Operator E-mail Address Contact Person (DSO/TSO) Lieven Degroote Eandis (DSO) Eandis-PrekwalificatieR3@eandis.be Gunther Schoovaerts Elia (TSO) Prequalification_AS@elia.be Pauline Ottoy Infrax (DSO) KCE_studies@infrax.be Wouter Motmans Ores (DSO

  12. Slide 12: Prequalification procedure TSO connected

    Prequalification procedure TSO connected How  Fill in the template provided at the start of the tendering procedure per Access Point participating with: o Required information o Signature Dynamic Grid User o Signature Candidate DPP(=BSP)  Send it to Prequalification_AS@elia.be; When  All requests

  13. Slide 13: Prequalification TSO connect: Status and link selection (proposal)

    Prequalification TSO connect: Status and link selection (proposal)  The BSP will receive from Elia/DSO a status for each EAN requested.  Possible statuses are green, orange or red: o Green = EAN can participate in the tendering and the selection will only be dependent on economical criteria; o Ora

  14. Slide 14: Template prequalification TSO

    Template prequalification TSO Template Prequalification TSO Personal Data Grid User Name Grid User Adress Grid User Telephone Number Grid User E-mail Grid User EAN Code of meter Contractual Data Name BSP Number of offered flexible MW R3 DP at EAN Main focus of EAN (production/load) Period (Peak/off-

  15. Slide 15: Template prequalification TSO

    Template prequalification TSO Contact details BSP Name BSP Adress BSP Telephone Number BSP To be signed by Dynamic Grid User: E-mail BSP • “I hereby authorize the DPP to enter into a Contract with Elia for the provision of the R3-DP Service using the Access Point Concerned” • “I hereby swear that al

  16. Slide 16: Activation procedure: principles TSO grid

    Activation procedure: principles TSO grid  Elia demands the activation from BSP by XML protocol;  When Elia does activation of BSP : o Elia notifies each implicated BRP: “Maximum possible MW activated in perimeter” within 15 min by mail;  Elia informs other parties on request; 24/06/2013

  17. Slide 17: Activation procedure: principles DSO grid

    Activation procedure: principles DSO grid  Elia receives from DSO link EAN –BRP monthly (aggregated per BRP per BSP or not);  Elia demands the activation from BSP by XML protocol;  When Elia does activation of BSP : o Elia notifies each implicated BRP: “Maximum possible MW activated in perimeter”

  18. Slide 18: Agenda

    Agenda 1. Validation MoM 3rd Expert WG of 14/05 2. Feedback from previous meetings / overall status & objective 3. Timing 4. Procedures: • Prequalification DSO: pre-prequalification/final template/exclusion rules (DSO) • Prequalification TSO (Elia) • Activation (Elia) 5. Contractual framework • Cont

  19. Slide 19: Contract Elia-BSP

    Contract Elia-BSP  Contract Notice launched 07/06  Contract was drafted during the months May-June;  Draft version is now in Legal revision;  Final version will be sent out with tendering documents (July 1st, 2013)  Procedure for Acceptance:  Conditions that must be fulfilled to participate in

  20. Slide 20: Contract DSO-BSP

    Contract DSO-BSP  Explained by DSO representatives 24/06/2013

  21. Slide 21: Final status ARP contract Art. 11.2

    Final status ARP contract Art. 11.2  Presented by Isabelle Gerkens 24/06/2013