Nordic Mining Asa · OSL:NOM

Nordic Mining Asa — Technical Presentation (May 2021)

35 slides from Nordic Mining Asa's technical presentation, May 11, 2021

  1. Slide 1: Engebø Rutile and Garnet

    Engebø Rutile and Garnet EN Expand Oslo: NOM Updated Definitive Feasibility Study 11 May 2021

  2. Slide 2: Disclaimer

    Disclaimer This document has been used by Nordic Mining during an oral presentation. Therefore, this document is incomplete without the oral explanations, comments and supporting instruments that were submitted during the referred presentation. To the extent permitted by law, no representation or wa

  3. Slide 3: Agenda

    Agenda 1 Highlights 2 Project 3 Financials 4 Execution 5 Appendix 3

  4. Slide 4: Reduced CAPEX and increased market resilience

    Reduced CAPEX Increased Reduced and market execution financing resilience risk risk Improved Retained environmental financial performance returns

  5. Slide 5: Sustainable project with robust project economics

    Sustainable project with robust project economics Plant CO2 Significant footprint emissions CAPEX reduced by reduced by reduction over 40% ~80% (93 MUSD) Post-tax Post-tax NPV @ 8% IRR of of 260 19.8% MUSD

  6. Slide 6: A strategic position in the growing USD billion TiO2 market

    A strategic position in the growing USD 15 billion TiO2 market Titanium, one of the most Rutile is the cleanest and purest form Rutile versatile elements with broad of TiO2 and the only feedstock that can applications in multiple value be used directly in production of chains environmentally friendl

  7. Slide 7: Significant rutile supply deficit ahead

    Significant rutile supply deficit ahead • Supply outlook indicates significant decrease in production • Supply decline follows from resource depletion in Australia, Africa and CIS • According to TZMI, a lasting supply deficit is expected from 2023 • High grade feedstock, including rutile, is vital t

  8. Slide 8: Garnet: industrial mineral with growing applications and environmental benefits

    Industrial mineral with growing applications and environmental benefits The only viable mineral for Garnet is a completely inert industrial waterjet cutting mineral without health implications The waterjet technology has revolutionized the production Garnet is easily recyclable for processes for e.g

  9. Slide 9: Strategic market position as first garnet producer in Europe

    Strategic market position as first garnet producer in Europe • Solid demand growth forecasted in the next decade • Waterjet cutting is the driving application area • The largest markets, US and Europe remain dependant on significant imports • Engebø has logistical advantages to both Europe and US •

  10. Slide 10: Pre-construction

    Q3/2021 Pre-construction work & financing

  11. Slide 11: Agenda

    Agenda 1 Highlights 2 Project 3 Financials 4 Execution 5 Appendix 11

  12. Slide 12: Large, high-grade deposit with unique characteristics

    Large, high-grade deposit with unique characteristics Deposit Deposit Location Location Infrastructure Infrastructure • 2.5 km eclogite ore body • Location by the North Sea • 40 minutes drive from outcropping at surface with ice-free, deepsea quay regional centre and two nearby airports • Long mine

  13. Slide 13: Improved Life of Mine schedule increases project value

    Improved Life of Mine schedule increases project value Engebø UDFS Life of Mine Schedule • High-grading increases rutile (TiO2) head grade Mt TiO2 % 6 4,5 % • Improved schedule for waste rock and 4,0 % stockpiling, with low open pit stripping ratio 5 (waste to ore ratio) of 0.6 3,5 % 4 3,0 % • Remov

  14. Slide 14: Simplified underground infrastructure reduces capex

    Simplified underground infrastructure reduces capex • Optimized mine access and pushback design • New pit design enables reduced fleet size and reduces bench height and width • Improved ore logistics from mine to process plant • Overall mass flow supported by gravity from mine to ship • Significant

  15. Slide 15: Fit-for-purpose plant layout reduces capex

    Fit-for-purpose plant layout reduces capex • Stick-build methodology enables larger process buildings and compact plant layout • Physical footprint of process plant reduced by over 40% • Fit-to-purpose design to optimize use of land and infrastructure • Reduction of civil and earthworks • Reduction

  16. Slide 16: Integrated process based on proven technology and extensive test work

    Integrated process based on proven technology and extensive test work • Integrated processing and production of high quality rutile and garnet • Industrial scale test work of all critical process steps • Limited rutile flotation with approved chemicals • High grade rutile (95% TiO2) with negligible

  17. Slide 17: Towards a fossil free operation; electrification reduces CO2 emission

    Towards a fossil free operation; electrification reduces CO2 emission • Use of electrical dryers will make the CO2 equivalents from the operation process plant free of CO2 emissions and reduce operating cost Kg CO2e per tonne of TiO2 • Overall CO2 emissions at low levels 1000 compared to the interna

  18. Slide 18: ESG embedded in plans for construction and operation

    ESG embedded in plans for construction and operation Use of electrical dryers instead of natural gas Climate responsibility fueled dryers results in ~80% reduction of total CO2 emissions New process chemicals have been approved by Environmental footprint the Environment Agency, confirming reduction

  19. Slide 19: Agenda

    Agenda 1 Highlights 2 Project 3 Financials 4 Execution 5 Appendix 19

  20. Slide 20: High-margin EBITDA of USD 2.1 billion over Life of Mine

    High-margin EBITDA of USD 2.1 billion over Life of Mine UDFS Financial Dashboard1 Project Free Cash Flow (USD million)1 2025 2030 2035 2040 2045 2050 2055 2060 Post-tax IRR of 19.8% and 100 1400 NPV@8% USD 260 million 1000 Life of Mine Operating Cash Flow 50 600 USD 1.7 billion 200 39 years 0 Free C

  21. Slide 21: Dual mineral revenues position Engebø in 1st quartile of the R/C curve

    Dual mineral revenues position Engebø in 1st quartile of the R/C curve TZMI 2024 Industry Revenue-to-Cash Cost ratio curve (R/C Ratio) 5 1st quartile 2nd quartile 3rd quartile 4th quartile 4 Engebø (TiO2 units x 2) Engebø is positioned in the 1st quartile of the titanium 3 feedstock industry R/C cur

  22. Slide 22: Project optimizations improve financial resilience

    Project optimizations improve financial resilience Project IRR sensitivities (%) Project NPV sensitivities (USD million) 25% 350 24% 330 23% 310 22% 290 21% 270 20% 250 19% 230 18% 210 17% 190 16% 170 15% 150 -20% -10% 0% 10% 20% -20% -10% 0% 10% 20% Capex Opex Rutile Price Garnet Price Capex Opex R

  23. Slide 23: Agenda

    Agenda 1 Highlights 2 Project 3 Financials 4 Execution 5 Appendix 23

  24. Slide 24: Lump-sum EPC contracts reduce execution and cost overrun risks

    Lump-sum EPC contracts reduce execution and cost overrun risks • Early engagement with potential EPC partners to bring new ideas and reduce risk • Project structured in 4 major EPC contracts comprising over 70% of total capex • EPC partnerships drive ownership and common project focus • Owner’s team

  25. Slide 25: Lean project team strengthens control and reduces schedule risk

    Lean project team strengthens control and reduces schedule risk Project Director Environment & Process & Production • Owner’s team will be strengthened by Communications experts from a reputable Project Management Consultant (PMC) Contract Administration Technical & Maintenance • PMC supports with a

  26. Slide 26: Integrating FEED in construction shortens time to production

    Integrating FEED in construction shortens time to production 2021 2022 2023 2024 FID1 Detail Engineering EPC 1 - Earthworks EPC 2 – Civil & Buildings EPC 3 – Structural & Mechanical EPC 4 – Electro & Installation Mechanical completion Cold commissioning Hot commissioning Production ramp-up Q3 Q4 Q1

  27. Slide 27: Acknowledgements

    Acknowledgements COWL AXE VALLEY MINING. JKizy splan viak Technology Transfer £))) Mineral Technologies IMS aa MINTS ENGINEERING DNV SINTEF == srk consulting ai % aS DEEP Wii Unearthing Mineral Excellence (ALS) Minerals

  28. Slide 28: Near-term activities

    Near-term activities • Formalize partnerships with EPC Contractors • Preparation for Owner’s team build-up: o Recruitment of key project resources o Assigning PMC • Project setup and planning with PMC and EPCs • Defining pre-construction activities (Eg. design and engineering) • Finalize offtake agr

  29. Slide 29: Questions?

    Questions? Plant CO2 Significant footprint emissions CAPEX reduced by reduced by reduction over 40% ~80% (93 MUSD) Post-tax Post-tax NPV @ 8% IRR of of 260 19.8% MUSD

  30. Slide 30: Agenda

    Agenda 1 Highlights 2 Project 3 Financials 4 Execution 5 Appendix 30

  31. Slide 31: Appendix #1 Mineral resources and ore reserves

    Appendix #1 Mineral resources and ore reserves Mineral resources (2% TiO2 cut-off) Ore reserves Tonnes (Mt) TiO2 grade (%) Garnet grade (%) Tonnes (Mt) TiO2 grade (%) Garnet grade (%) Measured (M) 29.2 3.60 44.5 Open Pit Indicated (I) 104.0 3.48 43.9 Proven (P) 19.33 3.56 44.25 Probable (Pr) 10.33 3

  32. Slide 32: Appendix #2 Key project figures and assumptions

    Appendix #2 Key project figures and assumptions Mining and Processing Operating Costs Description Units Value Description Units USD/Unit Open Pit Phase Years 15 Open Pit Mining - Waste2 Waste Tonne 2.53 Total Open Pit Ore Production Mt 29.7 Open Pit Mining – Ore2 Ore Tonne 2.48 Underground Phase Yea

  33. Slide 33: Appendix #3 Key project financials

    Appendix #3 Key project financials Project Economics1 Pre-Production Capital Expenditure Description Units Value Description Units Value Pre-tax NPV @ 8.0% USD million 354.6 Initial Capital Expenditure for Open Pit USD Million 203.4 and Processing Plant Pre-tax IRR % 22.5 Capital Intensity for Open

  34. Slide 34: Appendix #4 Board and Management

    Appendix #4 Board and Management Board of Directors Management Kjell Roland, Chairman Ivar S. Fossum, CEO • Former CEO of Norfund • 15 years with Nordic Mining (since founding) • Previous experience as partner and CEO in ECON Management AS and ECON Analysis • 20 years experience from management posi

  35. Slide 35: Appendix #5 Responding to the need of critical minerals

    Appendix #5 Responding to the need of critical minerals • EU Commission has taken actions to make Europe’s raw material supply more secure and sustainable • EU’s list of Critical Raw Materials reflects economic importance and supply challenges • Titanium and Lithium are both on the list of critical

Nordic Mining — Technical Presentation (May 2021) on 6ix