Sheffield Resources Limited · ASX:SFX

Sheffield Resources — Informa Mineral Sands Conference 2019

41 slides from Sheffield Resources's conference presentation, Mar 20, 2019

  1. Slide 1: The Emerging Force in Mineral Sands

    For personal use only The Emerging Force in Mineral Sands 20 - 21 March 2019 Informa Mineral Sands Conference

  2. Slide 2: Compliance and disclaimer

    Compliance and disclaimer IMPORTANT: You must read the following before continuing. Summary information in relation to Sheffield For personal use only This presentation contains summary information about Sheffield [Resources Limited (ACN 125 811 083) (Company or Sheffield), its subsidiaries and thei

  3. Slide 3: Compliance and disclaimer

    Compliance and disclaimer For personal use only Not financial product advice This presentation, and the information provided in it, does not constitute, and is not intended to constitute, investment or financial product advice (nor tax, accounting or legal advice). This presentation should not be re

  4. Slide 4: Investment highlights

    Investment highlights Low risk & • Located in a low risk, mining focused jurisdiction with certain key infrastructure already in place (roads, port, For personal use only simple operation etc.) • Conventional heavy mineral sands processing circuit and dozer trap mining underpinning a simple operatio

  5. Slide 5: Fully permitted and construction ready

    Fully permitted and construction ready Management has achieved all key milestones prior to equity funding For personal use only  Fully permitted and construction ready  Debt financing 100% secured1 • Mining Lease granted, water permits and Federal and State • US$175m debt facility provided by Taur

  6. Slide 6: A globally significant zircon discovery

    A globally significant zircon discovery Only opportunity to secure a large scale greenfield zircon project, with no other significant For personal use only discoveries remaining Globally significant zircon discoveries over the past 30 years Thunderbird (SFX) based on published pre-production resourc

  7. Slide 7: Largest, high grade, zircon rich mineral sands projects globally

    Largest, high grade, zircon rich mineral sands projects globally For personal use only Comparison of Ore Reserves and grade between the key global mineral sands deposits1,2,3 5.0 Bubble size In Situ Titanium Minerals (Ilm+Lux+Rut) % represents TiO2 Grade % Fairbreeze (TROX) THUNDERBIRD (SFX) contain

  8. Slide 8: Years of Thunderbird history

    8 years of Thunderbird history A greenfield project rapidly progressed by Sheffield from the grassroots exploration stage which has achieved all key milestones For personal use only Milestones pre BFS release Milestones post BFS release Dec 2010: EL 2012: Maiden 2014: Resource Oct 2015: Mar 2017: BF

  9. Slide 9: Consensus supports substantial zircon structural supply issues

    Consensus supports substantial zircon structural supply issues Thunderbird ideally positioned to help bridge the expected supply gap For personal use only Significant zircon supply gap expected1 Key observations • Supply decline of 4.3% p.a. expected up to 2025 ̶ Supply is dominated by Australia and

  10. Slide 10: High grade continuity x deposit thickness = value

    High grade continuity x deposit thickness = value Project plan view Overview For personal use only • Thunderbird contains a continuous high grade zone up to 46m thickness • Strong continuity and very high Valuable Heavy Mineral (“VHM”) grades OPEN • Near-surface high grades to be targeted early in t

  11. Slide 11: Conventional and well tested mining techniques

    Conventional and well tested mining techniques Thunderbird will use conventional and well tested dry mining techniques and equipment currently employed in existing and similar mineral sands operations globally For personal use only LOM mining blocks1 Major mining equipment to be utilised1 Max utilis

  12. Slide 12: Simple and conventional processing circuit

    Simple and conventional processing circuit Flowsheet producing five high grade, high quality products Flowsheet summary For personal use only • Conventional and simple heavy mineral sands processing circuit designed by Hatch and Robbins Engineering1 • Flowsheet produces premium zircon and zircon con

  13. Slide 13: Low temperature roast (LTR) of primary ilmenite

    Low temperature roast ("LTR") of primary ilmenite LTR enables the upgrade of Thunderbird's primary ilmenite to >56% TiO2 which makes it For personal use only suitable for chloride slag and sulfate pigment processes Effect of reduction roast on contained ilmenite and hematite Overview of LTR • Thunde

  14. Slide 14: LTR Ilmenite market opportunity

    LTR Ilmenite market opportunity Thunderbird’s LTR Ilmenite is an ideal feedstock for both sulfate pigment and chloride slag For personal use only production Growth expected in Global Chloride Pigment Production • Chloride slag based pigment capacity is increasing globally whilst sulfate based capaci

  15. Slide 15: Premium quality products

    Premium quality products Production of high quality zircon and ilmenite products % BFS revenue over LOM1 For personal use only • Thunderbird produces high quality finished products comprising: ̶ Premium zircon, zircon concentrate, LTR ilmenite, Hi-Ti 88 and titano–magnetite • The premium zircon prod

  16. Slide 16: 77% of Stage 1 revenue secured under binding offtake agreements

    77% of Stage 1 revenue secured under binding offtake agreements Robust demand for Thunderbird offtake with Stage 2 offtake 100% available For personal use only • Robust demand for Thunderbird offtake underpinned by: Stage 1 offtake summary ̶ High quality zircon and LTR ilmenite products Binding ̶ Lo

  17. Slide 17: Indicative mine schedule

    Indicative mine schedule LOM plan to deliver 145ktpa zircon and 388ktpa LTR ilmenite on average over a 42 year mine life For personal use only Stage 1 Stage 2 1,200 1,127 1,086 1,000 965 955 336 324 809 828 800 287 282 776 93 Product (kt) 94 249 240 106 227 584 96 80 81 600 560 503 91 91 65 79 68 17

  18. Slide 18: Projected operating costs

    Projected operating costs Leading Revenue to Cost Ratio For personal use only Stage 1 Operating Costs (FY21 – FY24 Steady-State)1 Stage 2 Operating Costs (FY25+ Steady-State)3 Revenue Revenue (net of royalties) (net of royalties) A$233m2 Operating margin = A$117m A$417m4 Operating margin = A$236m Re

  19. Slide 19: Stage 1 execution strategy

    Stage 1 execution strategy GRES will deliver the process plant and associated infrastructure on a fixed price, turnkey basis For personal use only 1 2 3 Owners Works (A$97m) EPC Design and Engineering Construction (A$366m) • Sheffield to manage various contracts via a combination of • To be undertak

  20. Slide 20: Summary of GRES EPC contract (A$366m)

    Summary of GRES EPC contract (A$366m) GRES will deliver the process plant and associated infrastructure on a fixed price, turnkey basis. All completion risk sits with GRES, For personal use only including detailed quality assurances EPC Contract Overview Wet Concentrator Design and Layout • On 12 No

  21. Slide 21: Summary of Owners Works Strategy (A$97m)

    Summary of Owners Works Strategy (A$97m) Outside of the EPC contract with GRES, the remaining A$97m of Stage 1 capex will be delivered by Sheffield in the form of further For personal use only EPC contracts or managed directly by Sheffield Further EPC Tenders Specification Cost Estimate (A$m) Basis

  22. Slide 22: Revised Stage 1 capital expenditure

    Revised stage 1 capital expenditure c. 80% of the revised Stage 1 upfront capex is subject to a fixed price EPC contract with GRES For personal use only • Original BFS Stage 1 upfront capex of A$348m, with Bridge From BFS Stage 1 Upfront Capex to Revised Funding Requirement (A$m) Sheffield opting to

  23. Slide 23: Senior debt financing summary

    Senior debt financing summary For personal use only US$175m Taurus facility A$95m NAIF loan facilities • Lender: Taurus Mining Finance Fund and Taurus Mining Finance Annex Fund • Lender: State of Western Australia, under back-to-back loan from Northern • Syndicated facility agreement executed Austra

  24. Slide 24: Debt principal repayment profile

    Debt principal repayment profile For personal use only Scheduled Debt Principal Repayment Profile (A$m)1,2 175 3 150 Taurus Tranche A (US$75m) Taurus Tranche B (US$100m) 125 NAIF Tranche C (A$30m) NAIF InfraCo Facility (A$65m) 100 133 75 50 3 3 25 41 4 27 23 10 3 3 3 3 4 3 4 4 0 2 4 4 4 4 4 4 2 4 5

  25. Slide 25: Stage 1 development & commissioning timeline

    Stage 1 development & commissioning timeline The proposed timetable takes into account all foreseeable seasonal events, such as the wet season. Early works have already commenced For personal use only Month 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34

  26. Slide 26: Social licence to operate (SLTO)

    Social licence to operate (SLTO) Sheffield has actively worked with stakeholders to create and maintain a robust SLTO For personal use only • Central to Sheffield’s strategy in the Kimberley region is its social licence to operate ("SLTO") ̶ Built over eight years and based on formal and informal co

  27. Slide 27: Significant regional exploration upside

    Significant regional exploration upside Strategic value of the Dampier Project demonstrated through multiple discoveries made along a 160km long trend For personal use only Dampier Project – Regional Plan1 • Exploration has delineated 14 zones of significant mineralisation along a 160km long highly

  28. Slide 28: Night Train deposit

    Night Train deposit Night Train confirmed as a major new mineral sands deposit For personal use only • Maiden high grade Mineral Resource outlined at Night Train with high in-situ zircon grades and high mineral assemblage value • Located just 20km south of the Thunderbird deposit and 2km from the re

  29. Slide 29: Summary

    Summary For personal use only • Thunderbird is the largest undeveloped zircon deposit in the world • The project is fully permitted and shovel ready • Thunderbird is a large high grade deposit with a 42 year mine life • Multiple exploration discoveries confirms a new zircon rich province • Consensus

  30. Slide 30: Appendix A: Other information

    For personal use only Appendix A Other information 30

  31. Slide 31: Experienced board and management

    EXPERIENCED BOARD AND MANAGEMENT For personal use only Will Burbury Bruce McFadzean David Archer Non-Executive Chairman Managing Director Technical Director Previously Chairman of Warwick Mining engineer with over 40 years Geologist with over 30 years Resources Limited in 2009 and was experience lea

  32. Slide 32: Sheffield snapshot

    SHEFFIELD SNAPSHOT For personal use only Sheffield is focused on development of the large scale, high quality Thunderbird mineral sands project Last 2 years share price performance $1.40 Price (AUD) $1.20 $1.0 $0.80 $0.60 $0.40 Mar-17 Apr-17 May-17 Jul-17 Aug-17 Sep-17 Nov-17 Dec-17 Jan-18 Mar-18 Ap

  33. Slide 33: A second quartile producer

    A SECOND QUARTILE PRODUCER For personal use only TZMI assess Thunderbird to have a competitive revenue to cost ratio 1st Quartile 2nd Quartile 3rd Quartile 4th Quartile Thunderbird Source: TZMI Notes: 1. Cautionary Statement: Thunderbird’s cost position is as estimated by TZMI and based on the March

  34. Slide 34: Royalty regime and fiscal arrangements

    ROYALTY REGIME AND FISCAL ARRANGEMENTS For personal use only Royalties1 • Royalty (Years 1 to 4, starting on first sale) = 0.5% of Total Sales Revenue on FOB basis or equivalent • WA State govt. royalty = 5% of State government Taurus3 • Royalty (Years 5 onwards for a period of to 22.5 Total Sales R

  35. Slide 35: Enhanced flexibility from proposed NAIF debt facilities

    ENHANCED FLEXIBILITY FROM PROPOSED NAIF DEBT FACILTIES NAIF facility highlights For personal use only • NAIF is a corporate Commonwealth entity that was established under the NAIF Act 2016 to provide assistance to the states of Queensland, Western Australia and the Northern Territory for the constru

  36. Slide 36: Appendix B: Product details

    For personal use only Appendix B Product details 36

  37. Slide 37: Premium Zircon

    PREMIUM ZIRCON1 For personal use only Product overview Thunderbird’s Premium Zircon product • Ceramic Grade Zircon: > 66% ZrO2 • Low levels of impurities • Good Opacity • No iron staining • Low levels of impurities • Good whiteness - • Low Fe2O3 important for making a good opacifier • Low TiO2 • Ver

  38. Slide 38: LTR Ilmenite

    LTR ILMENITE1 Product overview Global ilmenite comparison: FeO: Fe2O3 ratio For personal use only • Exceptional Grade: 56–58% TiO2 • Suitable for chloride slag production Premium feedstock for sulfate pigment • production Highly reactive ilmenite • High acid solubility Suited to Chinese Good reactiv

  39. Slide 39: Appendix C: Reserves and resources

    For personal use only Appendix C Reserves and resources 39

  40. Slide 40: Ore Reserves

    ORE RESERVES For personal use only Thunderbird deposit ore reserves1,4 Valuable Heavy Mineral (VHM) in-situ grade In-situ HM Valuable HM Grade (In-situ)2 Ore Reserve Ore Tonnes HM Grade Slimes Osize Tonnes Zircon HiTi Leuc Leuc Ilmenite Category (millions) (%) (%) (%) (millions) % % % % Proved 235.8

  41. Slide 41: Mineral Resources

    MINERAL RESOURCES THUNDERBIRD DEPOSIT MINERAL RESOURCE1,2,7 For personal use only Valuable HM Grade (In-situ)4 Mineral Resource Material Tonnes In-situ HM Tonnes HM Grade3 Slimes Osize Cut-off (HM%) Zircon HiTi Leuc Leuc Ilmenite Category (millions) (millions) (%) (%) (%) (%) (%) (%) (%) Measured 51

Sheffield Resources — Informa Mineral Sands Conference 2019 on 6ix