Gek Terna S.A. · ATHEX:GEKTERNA

Gek Terna — Investor Presentation (May 2014)

56 slides from Gek Terna's investor presentation, May 20, 2014

  1. Slide 1: GEK TERNA Group presentation

    GEK TERNA GROUP Group presentation

  2. Slide 2: GEK TERNA Group: Business Divisions

    GEK TERNA Group: Business Divisions Business us ess Divisions so s Energy Concessions Construction Industrial Real Estate 2

  3. Slide 3: GEK TERNA Group: Overview

    GEK TERNA Group: Overview  GEK TERNA is the parent company of the group, consolidating all activities: Thermal Energy, Toll roads, Construction, Real Estate, Industrial activity  Renewable Energy activity under TERNA ENERGY 3

  4. Slide 4: Group Structure

    Group Structure Group Structure GEK TERNA 100% 45,9% 100% 100% 100% 100% CONSTRUCTION TERNA ENERGY THERMAL REAL Toll Roads- Industrial (RENEWABLES) ENERGY* ESTATE Parkings (Magnesite) CO S CONSTRUCTION C O ENERGY G REAL ESTATE S CO C SS O S CONCESSIONS Industrial d i l * 50% ownership in the first p

  5. Slide 5: Investment points

    Investment points Achievements  One of the leading positions in Construction, Energy, Real Estate, Concessions in Greece  The Group has already been established in key markets outside Greece (S.E Europe, MENA region etc) in Energy, Real Estate and Construction  Strong capital structure, which rea

  6. Slide 6: Strategy

    Strategy New investments are focusing in Renewable Energy - 1.000 MW -in total- installed in the coming years Construction cash flow will generate enough equity to support motorway concessions investments Investment in Magnesite g mine will support pp g growth – veryy promising p g activity – reserv

  7. Slide 7: Historical IFRS Financials – GEK TERNA

    Historical IFRS Financials – GEK TERNA SALES(€m) 856 EBITDA (€m) 764 148 730 669 674 133 606 114 428 91 85 83 337 69 63 62 274 2005 2006 2007 2008 2009 2010 2011 2012 2013 2005 2006 2007 2008 2009 2010 2011 2012 2013 Net Profit (€m) 77 36 In 2012 and 2013, significant 25 28 22 impairments -3 2 -47 -

  8. Slide 8: Segments – Results

    Segments – Results million € SALES EBITDA EBIT NET INCOME bm Segments FY 13 FY 12 Ch% FY 13 FY 12 Ch% FY 13 FY 12 Ch% FY 13 FY 12 Ch% Construction 491.2 444.9 10.4% 24.8 33.5 -26.0% 4.8 8.1 -40.7% -61.9 -8.3 645.8% Renewables 105.8 79.6 32.9% 70.7 50.6 39.7% 36.6 31.9 14.7% 6.6 13.2 -50.0% Thermal 1

  9. Slide 9: Key consolidated CF items

    Key consolidated CF items € million FY 2013 FY 2012 Operating Cash Flow 155.9 111 (before WC changes) Operating cash flow aided by Construction and Energy Operations € million FY 2013 FY 2012 CAPEX 83.4 250.2 CAPEX is currently low but expected to accelerate in 2014 mostly due to Renewables’ and Con

  10. Slide 10: Key consolidated BS items – Net Bank Debt

    Key consolidated BS items – Net Bank Debt NET DEBT FY 2013 9M 2013 Construction 96.8 170.4 R Renewables bl 245 4 245.4 290 6 290.6 Thermal 28.5 51.8 Real Estate 78.6 80.8 Industrial 8.1 4.5 Concessions 135.4 95.9 g Holding -10.5 27.7 Total 582.5 722 Net Debt decreased by c140 million in Q4 2013 due

  11. Slide 11: Construction Activity

    Construction i Activity i i 11

  12. Slide 12: Construction backlog boosted by new orders

    Construction Backlog boosted by new orders (undertaking 100% of the motorways’ construction) - currently at the record high c3.9 billion Construction expected to generate strong cash flows and profitability 12 12

  13. Slide 13: Domestic Construction Division Outlook

    Domestic Construction Division Outlook Sustainable cash flow generation  Greek Infrastructure Plan up to 201 –c€10 billion  Backlog at end 2013: € 4 billion Growth Potential  Increase market share: The critical size of the Group enables TERNA to enjoy strong competitive position 13

  14. Slide 14: Domestic Construction Division Outlook: backlog

    Domestic Construction Division Outlook Ability to renew and enhance backlog  Backlog is at record high backlog ( million euros) 5000 4000 3100 3000 3900 million euros 1900 1900 2000 2050 2150 1900 1000 0 2007 2008 2009 2010 2011 2012 2013 (year end) 14

  15. Slide 15: Construction activities abroad

    Construction activities abroad Outlook for international Balkans  TERNA is already well positioned in the Balkans Target: 1/3 of construction  Project funding provided by EU (CSF) sales from projects outside Greece  EU enlargement: significant potential in the Balkans (accession of Bulgaria, Roma

  16. Slide 16: Concession Activity

    Concession Activity 16

  17. Slide 17: Concessions: Motorway concessions fully restarted

    Concessions Motorway concessions fully restarted c85 m equity already injected and c100 m more to be injected within the coming periods 17 17

  18. Slide 18: Concessions – BOT (GEK TERNA)

    Concessions – BOT (GEK TERNA) Status Development Participation Participation after value now construction period Ionian Road Under construction 1.4 billion 33% ca 56% Central Greece Under construction 1.7 billion 33% ca 50% Motorway Olympia Odos Under construction 2.1 billion 17% 17% Motorway Kastel

  19. Slide 19: Concessions – IONIAN ROAD

    Concessions – IONIAN ROAD  Total separate motorways in Eastern and Western coast of Greece (length: 378.7 km //159 km newlyy built))  Estimated construction cost: 1.15 billion euro  Financing during the construction phase (8 year construction period): – Subsidy: 622 million euro – Cash flow durin

  20. Slide 20: Concessions – CENTRAL GREECE (E65)

    Concessions – CENTRAL GREECE (E65)  New motorway in Central Greece (total length: 231 km )  Estimated construction cost: 1.5 1 5 billion euro  8 year construction period  Financing: – Subsidy: ca 750 million euro – Equity: 86.6 million (100%) – Senior bank debt without recourse to partners : 451

  21. Slide 21: Concessions – Olympia Odos

    Concessions – Olympia Odos  Motorway in North Peloponnesus (total length: 365 km )  Estimated construction cost: 1.7 1 7 billion euro  8 year construction period  Financing: – Subsidy: c850 million euro – Equity: 209 million (100%) – Senior bank debt without recourse to partners : 675 billion eu

  22. Slide 22: Concessions – Parking stations

    Concessions – Parking stations Current participations in parking concessions Net Participation (parking St ti Stations C Capacity it P ti i ti (%) Participation spaces)) F Format t off Ownership O hi Parking Station Rizari (In operation) 657 20% 131 Parking Station Hospital Agia Sofia Square (In ope

  23. Slide 23: Renewable Energy

    Renewable Energy 23

  24. Slide 24: Renewables – strategy

    Renewables – strategy B Become a di diversified ifi d renewablebl energy producer d ttargeting ti 1 GW installed i t ll d or at late stages of construction by 2014 24

  25. Slide 25: Renewables: installed capacity

    Renewables Installed capacity p y increases – 544 MW currently y installed New installations are expected till end H1 14 – c100 MW 25 25

  26. Slide 26: Portfolio

    Portfolio Diversified portfolio of RES projects Expansion outside Greece SHPS & Biomass & Status Wind (MW) P/V (MW) Pump Storage (MW) Co-generation (MW) Greece 302 Poland 74 In operation Bulgaria 30 520 15 8,5 , USA 138 Under construction (or ready to built) 292 2 Greece 282 Poland 12 With productio

  27. Slide 27: Wind projects: business plan roll-out

    Wind projects: business plan roll roll--out Current RES in operation or under construction or ready to build: 837 MW Targeted installed or under construction capacity at year end c. 1000 837 27 27

  28. Slide 28: Thermal Energy Activity

    Thermal Energy gy Activity y 28

  29. Slide 29: Thermal Energy: HERON gas plants

    Thermal Energy HERON GAS PLANTS  HERON operates in the sectors of electric energy production and supply since 2004 through HERON THERMOELECTRIC S.A. (HERON I) and HERON THERMOELECTRIC STATION OF VIOTIA S.A. (HERON II), respectively  GEK Terna owns 50% of HERON I and 25% of HERON II while GDF-Suez

  30. Slide 30: Thermal Energy: Overview of thermal plants

    Thermal Energy Overview of thermal plants Project Status MW Type HERON I In operation 147 OCGT HERON II In operation 432 CCGT HERON I  The first private thermal plant in Greece  OCGT - 147 MW capacity and 40% efficiency  Total investment: €80m  Operational since September 2004 HERON II  The gro

  31. Slide 31: HERON I power plant technical data

    Thermal Energy HERON I POWER PLANT TECHNICAL DATA • Open Cycle Gas Turbine (OCGT) Power Plant • Fuel: Natural Gas, Diesel • Located 4 km south of the city of Thiva, Viotia, Greece • Total installed capacity: 147 MWe • Efficiency @ ISO conditions: 40% • First Fire: 2004 • Extremely short construction

  32. Slide 32: HERON – Key metrics

    Thermal Energy HERON 1 - KEY METRICS  €80m invested in 2004  Prime condition  Net cash position of company  Cost plus profit reimbursement system:  Energy remuneration at 100% of variable cost (gas & other VCs)  Net capacity payments: €78,000/MW per annum  Peak unit, total operating hours: 7,

  33. Slide 33: HERON II power plant technical data

    Thermal Energy HERON II POWER PLANT TECHNICAL DATA  Combined Cycle Gas Turbine (CCGT) Power Plant  Fuel: Natural Gas  Located 4 km south of the city of Thiva, Viotia, Greece  Total installed capacity: 432 MWe  Effi i Efficiency @ ISO conditions: diti 57.65% 57 65%  First Fire: April 2010  Com

  34. Slide 34: HERON II – Key metrics

    Thermal Energy HERON II - KEY METRICS  €301m and €50m VAT invested in 2010  €102m shareholders equity  €49m shareholders subordinated debt  €75m EIB senior loan  €75m loan from other banks  €52m VAT loan  13 y tenor of senior loan  Cash sweep: 60% until repayment of 20%, 30% afterwards  Rep

  35. Slide 35: HERON I and II revenue sources

    Thermal Energy HERON I REVENUE SOURCES  Capacity availability tickets (CATs)  [ Annual remuneration ] = [ Installed Capacity ] * [ Average availability during the last 3 years ] * [ 2*56,000 2*56 000 €/MW-year €/MW year ] * [ Capacity Adequacy Factor ]  Dynamic development of Sales Portfolio  Cu

  36. Slide 36: HERON I and II competitive advantages

    Thermal Energy HERON I AND II COMPETITIVE ADVANTAGES 1. Location • HERON I and II plants are located in Thiva, very close to the nation’s main demand center (Athens). This establishes ab a competitive o p advantage ad a ag versusu the power po plants pa located o a d in Northern o Greece due du to o

  37. Slide 37: Thermal Energy Strategy

    Thermal Energy Strategy  Strategic opportunities for shareholders of HERON companies in view of forthcoming market opening and privatization of PPC • PPC asset sales: goal to create a “small PPC”, of approximately 2.4 GW • Release of PPC low-cost lignite and hydro production (through “NOME-like” au

  38. Slide 38: Industrial Activity (Magnesite mine)

    Industrial Activity (Magnesite mine) 38

  39. Slide 39: Magnesite mine: About TERNAMAG

    Magnesite mine About TERNAMAG  TERNAMAG (ex-Skalistiris Group) has been acquired by GEK Terna in 2010 under a different scope; It is situated in the northeast part of the island of Evia just 120kms from Athens and Piraeus;  The facility also includes a port capable to serve vessels up to 20.000 to

  40. Slide 40: Magnesite mine: About TERNAMAG products

    Magnesite mine About TERNAMAG  CCM is used in fertilizers, animal feed, medicine, glass industry, waste treatment, fuels & lubricants, various chemical products and in many other applications. The use of CCM is growing year by year since it is a very pure and versatile ingredient suitable for numer

  41. Slide 41: Magnesite mine: Total CAPEX

    Magnesite mine Total CAPEX: approx. 100 million TERNAMAG is currently implementing a 2-stage investment plan of 100 million euro’s. Phase A’ is expected to be completed by Sept-Oct ‘14 while Phase B’ by Dec ‘16 (or sooner); Sources and Uses of the total investment are shown herein below: Sources & U

  42. Slide 42: Magnesite mine: Commercial points

    Magnesite mine Commercial points  Phase h A’’ off the h investment plan l that h relates l to the h production d off CCM CC has h commenced d in Aprill 2013 20 3 and d is expected to be completed by end-Sept. 2014;  Phase B’ of the investment plan that relates to the production of DBM is expected

  43. Slide 43: Magnesite mine: Commercial points

    Magnesite mine Commercial points • Deposits of very high quality for the next 50 years at least; • Latest technologies to be applied for the production of final products; • Own port facilities offer competitive advantage & high operating efficiency; • Lower operating costs offer significant competit

  44. Slide 44: Real Estate Activity

    Real Estate Activity 44

  45. Slide 45: Real Estate Activity

    Activity:: Real Estate Activity GEK, being a Real Estate developer, holds a differentiated portfolio in Greece and abroad  Logistic centers-industrial parks  Offices  Entertainment parks p  Second home properties  Residential properties  Commercial properties 45

  46. Slide 46: Real Estate: General Overview

    Activity:: Real Estate Activity General Overview  GEK Terna is engaged in Real Estate development - the company holds a differentiated portfolio in Greece, Bulgaria and Romania:  Logistic centers-industrial parks  Offices  Entertainment parks  Second home properties  Residential properties  C

  47. Slide 47: Real Estate: Greek Market Overview

    Activity:: Real Estate Activity Greek Market Overview  U Upward d ttrend d iin th the market k t expected t d iin 2014 2014. A According di  P Positive i i signs i ffor stabilisation bili i and d growth h off to OECD, output growth is expected to turn positive in economy: the course of 2014, gaini

  48. Slide 48: Real Estate Activity

    Activity:: Real Estate Activity Source: Company

  49. Slide 49: Key projects: City Tower Business Center, Sofia

    Activity:: Real Estate Activity Key projects description City Tower Business Center – Sofia, Bulgaria  Type: yp Office buildingg with retail area & parking p g spaces p  TBA of the project: 54.805 sq.m (including underground levels)  Address: Macedonia Sq., Sofia  Total ota land a d ssize: e 33.

  50. Slide 50: Key projects: Winter Resort, Borovets

    Activity:: Real Estate Activity Key projects description Winter Resort – Borovets, Bulgaria  Alpine p architectural design g usingg natural material  Consists of a luxury hotel and 75 residences for sale  5 residential units and 9 villa houses  A cclub ub house ouse with t lobby, obby, restauran

  51. Slide 51: Real Estate Strategy and Future Opportunities

    Activity:: Real Estate Activity Strategy and Future Opportunities New opportunities in tourism related Greece is recognised as a prime location for projects (hotels and holiday tourism and logistics: residential projects with recreational Hotels, holiday resorts, rehabilitation centers, components)

  52. Slide 52: Appendix: Financial Data

    APPENDIX Financial Data Amounts in ‘000 euros

  53. Slide 53: Balance Sheet

    Balance Sheet BALANCE SHEET – FY 2013 31.12.2013 31.12.2012 ASSETS Fixed assets 941,970 1,008,244 Real estate investments 73,599 81,589 Intangible assets 363,544 335,341 Participations and other long-term financial assets 85,278 96,404 Inventories , 94,876 122,523 , Trade receivables 302,964 315,183

  54. Slide 54: Profit & Loss

    Profit & Loss PROFIT & LOSS FY 2013 1/1 - 31/12 1/1 - 31/12 2013 2012 Continuing Operations Net Sales 729,838 729 838 673,334 673 334 Cost of goods sold -646,090 -605,009 Gross Profit 83,748 68,325 Administration Expenses -36,066 -37,019 RnD Expenses -2,586 -2,585 Other Income/expenses -49,260 -16,1

  55. Slide 55: Cash Flow

    CASH FLOW CASH FLOW STATEMENT – FY 2013 1/1-31/12/2013 1/1 31/12/2013 1/1-31/12/2012 1/1 31/12/2012 Operating activities Profit before tax -71,679 -43,088 Plus/less adjustments for: Depreciation 68,359 62,998 Provisions 4,094 9,732 I t Interestt income i and d related l t d iincome -3,011 3 011 -7,3

  56. Slide 56: GEK TERNA Group contact

    GEK TERNA GROUP Address: 85 Mesogion St, Athens, Greece tel: 0030- 0030-210 6968431, fax 0030- 0030-210 -6968076 Email: ir@gek.gr Website: www.gekterna.gr Investor relations: Mr A.Spiliotis 56

GEK Terna — Investor Presentation (May 2014) on 6ix