Slide 1: 2015 Integrated Resource Plan Stakeholder Workshop #2
2015 Integrated Resource Plan Stakeholder Workshop #2 June 4, 2015 Plainfield, IN
Slide 2: Welcome
Welcome DUKE 2 & ENERGY.
Slide 3: Welcome
Welcome Safety message Why are we here today? Objectives for stakeholder process Introduce the facilitator 3
Slide 4: The Facilitator
The Facilitator Duke Energy Indiana hired Dr. Marty Rozelle of The Rozelle Group and her colleagues to: Help us develop the IRP stakeholder engagement process Facilitate and document stakeholder workshops 4
Slide 5: Why are we here today?
Why are we here today? Duke Energy Indiana developing 2015 Integrated Resource Plan (IRP) Proactively complying with proposed Commission IRP rule Today is the 2nd of 4 stakeholder workshops prior to filing the IRP by November 1, 2015 5
Slide 6: Objectives for Stakeholder Process
Objectives for Stakeholder Process Listen: Understand concerns and objectives Inform: Increase stakeholders’ understanding of the IRP process, key assumptions, and challenges we face Consider: Provide a forum for productive stakeholder feedback at key points in the IRP process to inform Duke E
Slide 7: Agenda
Agenda 08:30 Registration & Continental Breakfast 09:00 Welcome, Introductions, Agenda 09:20 Meeting 1 Comments and Response 09:40 Updates Since Meeting 1 10:00 Break 10:15 Scenario Discussion 11:30 Lunch 12:15 Resource Discussion 01:30 Portfolio Development Exercise 03:00 Closing Comments 7
Slide 8: Meeting 1 Comments and Response
Scott Park, Director IRP Analytics - Midwest Meeting 1 Comments and Response 8
Slide 9: Meeting 1 Comments and Response
Meeting 1 Comments and Response Topic We heard/observed… Response Individual guest accounts were created Wi-Fi Overloaded Wi-Fi hot spot to access vendor network More information on environmental Scenario specifics will be discussed Scenarios scenarios in June 4th meeting Resources including DSM/EE
Slide 10: Updates Since Meeting 1
Scott Park, Director IRP Analytics - Midwest Updates Since Meeting 1 10
Slide 11: Updates Since Last Meeting
Updates Since Last Meeting Deregulation call report out On May 14th, Duke hosted a call to further discuss with stakeholders ideas about deregulation and customer choice. Themes from that call were used to develop a Customer Choice Scenario Will be discussed in more detail this Scenario sectio
Slide 12: Break
Break DUKE 2 & ENERGY.
Slide 13: Scenarios Part 1
Jim Hobbs, Lead Engineer Scenarios Part 1 13
Slide 14: No CO2 Regulation
No CO2 Regulation Scenario Narrative $/mmBtu No CO2 Scenario $/MWh No carbon tax/price or regulation $12 $100 Moderate environmental levels of regulation $90 $10 No renewable energy portfolio standard $80 $70 $8 $60 $6 $50 Average annual load growth rate: 0.9% $40 $4 $30 $20 $2 $10 $0 $0 2
Slide 15: CO2 Regulation by Price
CO2 Regulation by Price Scenario Narrative $/mmBtu Carbon Tax Scenario $/MWh Carbon tax: $17/ton in 2020, rising to $50/ton $12 $100 Increased environmental levels of regulation $90 $10 5% renewable energy portfolio standard $80 $70 $8 $60 $6 $50 Average annual load growth rate: 0.8% $40 $
Slide 16: Clean Power Plan (CPP)
Clean Power Plan (CPP) Scenario Narrative $/mmBtu CPP Scenario $/MWh Carbon reduced 20% $12 $100 Increased environmental levels of regulation $90 $10 5% renewable energy portfolio standard $80 $70 $8 $60 $6 $50 Average annual load growth rate: 0.8% $40 $4 $30 $20 $2 $10 $0 $0 2015 2017 201
Slide 17: Scenarios Part 2
Brian Bak, Lead Planning Analyst Scenarios Part 2 17
Slide 18: No CO2 Regulation followed by CO2 Regulation
No CO2 Regulation followed by CO2 Regulation Scenario description: $/mmBtu No CO2 → CO2 Scenario $/MWh Follows No CO2 scenario pricing, load growth $12 $100 and regulatory policy for 10 years followed by $90 a gradual shift to CO2 scenario pricing, load $10 $80 and regulatory policy for remainde
Slide 19: CO2 Regulation followed by No CO2 Regulation
CO2 Regulation followed by No CO2 Regulation Scenario description: $/mmBtu CO2 → No CO2 Scenario $/MWh Follows CO2 scenario pricing, load growth and $12 $100 regulatory policy for 10 years followed by a $90 sudden shift to No CO2 scenario pricing, load $10 $80 and regulatory policy for remainder
Slide 20: Extended Market Pricing
Extended Market Pricing Scenario description: $/mmBtu Extended Market Scenario $/MWh Maintains market fuel and power prices for full $12 $100 planning period – no fundamental forecast data $90 $10 Typical transition from Market to Fundamental $80 $70 Market pricing for 3 years $8 $60 Trans
Slide 21: Scenarios Part 3
Scott Park, Director IRP Analytics - Midwest Scenarios Part 3 21
Slide 22: Increased Customer Choice
Increased Customer Choice Increased roof top solar is installed and a growing Customer Choice Scenario number of customers make this decision. $/mmBtu $12 $/MWh $100 Every year, starting on 2020, an additional 1% $90 of load is served with solar at the average cost $10 $80 of rooftop solar for r
Slide 23: Climate Change Scenario
Climate Change Scenario The Climate Change Scenario is Climate Change Scenario characterized by higher summer $/mmBtu $/MWh $12 $100 temperatures that drive increased electricity $90 consumption. Increased fuel and power $10 $80 prices as well as a carbon tax of $17/MWh $70 starting in 2020 benefi
Slide 24: One Year Stress Scenario: Polar Vortex
One Year Stress Scenario: Polar Vortex What is a One Year Stress Scenario? Polar Vortex Scenario $/mmBtu $/MWh These scenarios were developed to stress the $12 $100 various portfolios to extreme events. While not $90 frequent enough to warrant a long term $10 $80 scenario, we expect them to be insig
Slide 25: One Year Stress Scenario: Hot Summer
One Year Stress Scenario: Hot Summer (Low Water and High Load) Description of Hot Summer Stress Scenario Hot Summer Scenario $/mmBtu $/MWh This scenario will feature higher summer $12 $100 temperatures which drive increased demand for $90 electricity. Due to lower river levels, riverside $10 $80 gen
Slide 26: Lunch
Lunch DUKE * & ENERGY.
Slide 27: Resources Part 1
Jim Hobbs, Lead Engineer Resources Part 1 27
Slide 28: Simple Cycle Combustion Turbines (CTs)
Simple Cycle Combustion Turbines (CTs) Resource Description Advantages Natural Gas primary, Fuel Oil backup Low capital cost 210 MW Nameplate Fast install vs. other conventional options Heat Rate 10 MMBtu/MWh Fuel abundant/cheap for now Capital $31/MWh @ 30% Capacity Factor Fuel/O&M
Slide 29: Combined Cycle Combustion Turbines (CCs)
Combined Cycle Combustion Turbines (CCs) Resource Description Advantages Natural Gas primary, Fuel Oil backup High efficiency 2 CTs with steam generator (2 on 1 or 2x1) Versatile - baseload or intermediate service 620 MW Nameplate Fuel abundant/cheap for now Heat Rate 7 MMBtu/MWh Cap
Slide 30: Nuclear
Nuclear Resource Description Advantages Uranium fuel Low variable cost 1117 MW Nameplate Reliable baseload service Capital $72/MWh @ 90% Capacity Factor Fuel supply reliability Fuel/O&M $24/MWh @ 90% Cap Factor No air emissions CO2 emissions rate 0 #/MWh Disadvantages High constr
Slide 31: Screened Out Resources
Screened Out Resources Geothermal – No local resource Advanced Storage – Expensive; Duke R&D efforts continuing. Battery Innovation Center near Crane Naval Surface Warfare Center, $1M funding Compressed Air Storage – Expensive, limited experience, high capital, scarce sites Small Modular R
Slide 32: Battery Storage R&D
Battery Storage R&D Project Name Location Technology Capacity Interconnection Notrees Ector and Winkler counties, TX Xtreme Power advanced lead acid 36 MW/24 MWh 153 MW Wind Project Rankin Gaston County, NC FIAMM sodium nickel 402 kW/282 kWh 1 MW Solar Project Marshall Catawba County, NC Kokam super
Slide 33: Combined Heat and Power (CHP)
Combined Heat and Power (CHP) 33
Slide 34: CHP Advantages and Challenges
CHP Advantages and Challenges Advantages High combined efficiency Low combined carbon emissions Smaller scale could enable better matching to reserve margin requirement Economic development incentive Challenges Unique, site and customer specific; must have steady steam load Customer
Slide 35: CHP Prospects
CHP Prospects Up to 500 MW Technical Potential with suitable customers Universities Bio-refineries Pharmaceuticals Other Industrials 2 customer installations now operating Purdue (39 MW-coal and gas) Tate and Lyle (7.4 MW-coal) CHP may be an economic alternative for meeting small b
Slide 36: Resources Part 2
Brian Bak, Lead Planning Analyst Resources Part 2 36
Slide 37: Duke Energy Indiana renewable resources
Duke Energy Indiana renewable resources Benton County Wind Farm 100.5 MW 20-year power purchase agreement (PPA) signed in 2006 Yields approximately 300,000 MWh/year Markland Hydro Facility 51.3 MW run-of-river facility owned by Duke Energy Indiana Also yields approximately 300,000 MWh/
Slide 38: Biomass – Landfill Gas
Biomass – Landfill Gas Resource Description Advantages Fuel source: Landfill methane emissions Low fuel cost Internal Combustion Engine Baseload power 5 MW Nameplate Dispatchable Capital $65/MWh @ 90% Capacity Factor Reduces flaring/direct emission of landfill Fuel/O&M: $20/MWh @ 9
Slide 39: Typical Landfill Gas Power Plant
Biomass – Landfill Gas Typical Landfill Gas Power Plant 39
Slide 40: Wind
Wind Resource Description Advantages 20-200 MW Nameplate Zero “fuel” cost Capital: $56/MWh @ 35% Capacity Factor Zero air emissions O&M: $13/MWh @ 35% Capacity Factor Renewable resource Contribution-to-Peak (MISO Capacity Credit) 14.7% average Disadvantages Site specific: 1.4% - 25
Slide 41: Wind Resource Distribution
Wind Resource Distribution Benton County 41
Slide 42: Solar
Solar Resource Description Advantages 5-25 MW Nameplate Zero “fuel” cost Capital: 79$/MWh @ 21% Capacity Factor Zero air emissions O&M: $7/MWh @ 21% Capacity Factor Renewable resource Contribution-to-Peak / Capacity Value MISO Capacity Auction: based on actual metered historical outp
Slide 43: Solar Resource Distribution
Solar Resource Distribution Geres Energy LLC Pastime Farm LLC McDonald Solar LLC Sullivan Solar LLC 43
Slide 44: Solar: Contribution to Peak Load – Summer & Winter
Solar: Contribution to Peak Load – Summer & Winter 44
Slide 45: U.S. Photovoltaic System Pricing Trends
U.S. Photovoltaic System Pricing Trends • All methodologies show a downward trend in PV system pricing • Reported pricing and modeled benchmarks have historically had similar results, however have recently diverged Source: US DOE SunShot Initiative; Sept. 2014 (National Renewable Energy Laboratory a
Slide 46: Resources Part 3
Scott Park, Director IRP Analytics - Midwest Resources Part 3 46
Slide 47: Demand Response (DR)
Demand Response (DR) Resource Description Advantages DR is a resource where the company pays Opportunity for customers to lower bill in customers an option payment to be able to exchange for being interrupted curtail a customers load during periods of Useful in clipping peak high demand. Disad
Slide 48: Energy Efficiency (EE)
Energy Efficiency (EE) Resource Description EE is not a single resource but rather a collection of over five-hundred different measures such as lighting, appliances or motors Typically, EE is included in the load forecast implicitly or as a load reduction EE levels are frequently described i
Slide 49: Energy Efficiency (EE)
Energy Efficiency (EE) Resource Description EE can be incented by the utility, but requires an action by the customer Participation is less than what purely economic behavior would suggest 49
Slide 50: Energy Efficiency (EE)
Energy Efficiency (EE) Unlike a traditional generation resource such as a gas plant or windmill, EE does not EE supply curves by adoption rates have a single cost for each MWh, but rather $250 has a supply curve for increasing amounts of energy $200 $150 Additionally, the supply curve changes as
Slide 51: Energy Efficiency (EE)
Energy Efficiency (EE) In order to model utility sponsored EE as a resource, this portion of EE needs to be removed from the load forecast and put into bundles for economic selection by the resource planning model. 51
Slide 52: Portfolio Development Exercise
Scott Park, Director IRP Analytics - Midwest Portfolio Development Exercise 52
Slide 53: Portfolio Development Exercise
Portfolio Development Exercise Purpose Give stakeholders an opportunity to describe their respective preferred energy mix of DEI’s future portfolio Things to remember Consider other stakeholders (800,000 customers but only 1 system) System flexibility and fuel diversity Tradeoffs between dif
Slide 54: Closing Comments, Stakeholder Comments
Marty Rozelle, President, Rozelle Group Closing Comments, Stakeholder Comments 54
Slide 55: Next Steps
Next Steps Please complete comment cards or send by June 11 to Marty at: RGL97marty@rozellegroup.com Meeting summary and other materials will be posted on website by June 18 (http://www.duke-energy.com/indiana/in-irp-2015.asp) Next workshop tentatively scheduled for the first week in August 55