Vault Minerals Limited · ASX:VAU
Vault Minerals — Red 5 — Shareholder Meeting (November 2015)
23 slides from Vault Minerals's shareholder meeting presentation, Nov 20, 2015
Slide 1: Annual General Meeting – 20 November 2015
For personal use only Annual General Meeting – 20 November 2015 Mark Williams, Managing Director ASX Code: RED
Slide 2: Red 5 Snapshot
Red 5 Snapshot Unhedged and debt-free ASX-listed gold producer operating in the Philippines For personal use only ASX Code RED Directors and Management Share price (at 19 November 2015) A$0.06 Kevin Dundo – Chairman Issued shares 759.5M Mark Williams – Managing Director Market capitalisation (at 6.0
Slide 3: Siana Gold Project – Location
Siana Gold Project – Location Located in a highly prospective and established mining region For personal use only 3
Slide 4: Milestones Achieved
Milestones Achieved A pivotal period for Red 5 with the recommencement of gold production at Siana For personal use only 1. Construction of new tailings management system; plant and infrastructure upgrades; lifting of CDO 2. Plant re-commissioning and successful production ramp-up 3. Swift, coordina
Slide 5: Tailings Management System
Tailings Management System Significant upgrade completed For personal use only 1. Work for Stage 1 upgrades to existing tailings storage facilities production (TSF) completed on time and under budget restart 2. Permitting and construction of new High Density Poly Production Ethylene (HDPE) lined
Slide 6: Siana Infrastructure Upgrades
Siana Infrastructure Upgrades Major projects to enhance safety, environmental protection, productivity and reduce operating costs For personal use only 1. Work for Drainage systems, settlement ponds and haul production restart roads upgraded 2. Production New drainage channel for West pit wall r
Slide 7: Siana Processing Plant
Siana Processing Plant Plant successfully recommissioned with ramp-up to full production For personal use only 1. Work for Installation of thickener and cement-mixing facility production – commissioned November 2014 restart All mechanical electrical and process equipment 2. Production fully reha
Slide 8: Mining
Mining Strong production performance since mining recommenced For personal use only Mining of ore recommenced in December 2014 1. Work for production Quarter restart Significant cut-back of Western walls commenced 2. Production and now well advanced ramp-up Accumulated silt at the bottom of th
Slide 9: East Pit Wall Material Movement
East Pit Wall Material Movement Rapid and effective response to material movement on eastern side of open pit For personal use only 1. Work for Significant movement of material in East pit wall occurred production in July 2015 restart 5-point management plan rapidly implemented to 2. mitigate im
Slide 10: Revised Open Pit Mining Strategy
Revised Open Pit Mining Strategy Forecast to produce 181,000oz at AISC of US$740-790/oz For personal use only 1. Work for Comprehensive Open Pit mining review and reserve production update completed in September 2015 restart Reflects mining experience gained during first two 2. Production years,
Slide 11: Underground Concept Study
Underground Concept Study A blueprint to deliver future growth at Siana via underground mining For personal use only 1. Work for production Underground Technical Review completed to restart a Concept level, utilising specialist mining 2. consultants Production ramp-up Comprehensive update review
Slide 12: Mapawa LSY Deposit – JORC Resource
Mapawa LSY Deposit – JORC Resource Key step in unlocking regional growth potential at Siana For personal use only 1. Work for JORC 2012 Indicated and Inferred Mineral production Resource completed for LSY deposit of 8.8Mt @ restart 1.0g/t Au for 289,000oz 2. Production Resource based on 13,798m
Slide 13: The Year Ahead: Key Objectives
The Year Ahead: Key Objectives Build on our recent achievements and create a strong foundation for growth For personal use only 1. Deliver open pit production plan of 50-60,000oz for FY 2016 2. Complete underground Feasibility Study; employ underground mining specialist; commence underground develop
Slide 14: Production Guidance
Production Guidance Financial year forecast production profile For personal use only 1. 2015/16 financial year forecast production profile: Deliver on production Quarter Estimated Au oz forecast recovered 2. Complete September 2015 quarter (Actual) 17,737 underground DFS December 2015 quarter 10-12,
Slide 15: Underground Concept Study
Underground Concept Study A blueprint to deliver future growth at Siana For personal use only 1. Feasibility study planned to be completed in Short up-hole retreat Deliver on production 2016 forecast Appointment of dedicated U/G resource 2. Complete person to lead study and transition into under
Slide 16: Long-term Tailings Management Solution
Long-term Tailings Management Solution For personal use only 1. Deliver on Planning and preparation for an production additional long-term TSF capacity well forecast underway: 2. Complete Preferred location identified underground DFS International Consulting Group 3. engaged for completion of
Slide 17: Mapawa Project
Mapawa Project Maiden resource paves the way for Scoping Study; longer term exploration upside For personal use only 1. Deliver on Planned Scoping Study to assess medium term production potential to mine higher grade ore from forecast Mapawa to provide incremental mill feed to the 2. Siana Gold Pr
Slide 18: Surigao del Norte
Surigao del Norte One of the most mineralised provinces in one of the most mineralised countries globally For personal use only 1. Deliver on Exploration plans and targets identified production forecast Preparations underway for increased near- mine and regional exploration activities 2. Complet
Slide 19: Sustainable Development initiatives
Sustainable Development initiatives Strong commitment to health and safety, community and environmental programs For personal use only 1. Deliver on Support continues in the areas of: production forecast Health Community education 2. Complete Welfare underground DFS Agricultural 3. Infrast
Slide 20: Summary: the Key Pillars of our Future Growth
Summary: the 5 Key Pillars of our Future Growth ASX-listed gold producer operating in the Philippines For personal use only 1. Low-cost production from open pit operations at Siana Forecast to produce 181,000oz at AISC of US$740-790/oz from July 2015 Red 5 has a clear strategy to build Open pit
Slide 21: Thank you
For personal use only Thank you Mark Williams (Managing Director) Australia Philippines Kevin Dundo (Chairman) Red 5 Limited Greenstone Resources Corporation Level 2, 35 Ventnor Avenue Level 5, NOL Tower Web: www.red5limited.com West Perth, Western Australia 6005 Commerce Ave E-mail: info@red5limite
Slide 22: Disclaimer and Competent Person’s Statement
Disclaimer and Competent Person’s Statement For personal use only Competent Person’s Statement for JORC 2012 Mineral Resource and Ore Reserve This information was prepared and first disclosed under the JORC Code 2004. It has The information in this report that relates to Mineral Resources and Ore Re
Slide 23: Disclaimer and Competent Person’s Statement
Disclaimer and Competent Person’s Statement For personal use only Mineral Resource and Ore Reserve – Siana Underground Forward-Looking Statements This information was prepared and first disclosed under the JORC Code 2004. It has Certain statements made during or in connection with this statement con