Slide 1: ASX cover letter: UBS conference and JM Financial presentations
ENERGY WORLD CORPORATION LTD. 9A Seaforth Crescent Tel: (61 2) 9247 6888 Seaforth, NSW, 2092 Fax: (61 2) 9247 6100 For personal use only 26 June 2009 The Listing Manager The Listing Manager Company Announcement Platform Market Information Services Section ASX Limited New Zealand Stock Exchange URL:
Slide 2: UBS Australian Resources, Energy & Utilities Conference
For personal use only ENERGY WORLD CORPORATION UBS Australian Resources, Energy & Utilities Conference 18 June 2009 Presentation By Mr. Stewart W.G. Elliott Managing Director and Chief Executive Officer Energy World Corporation Ltd.
Slide 3: Disclaimer
Disclaimer For personal use only • These materials have been prepared by Energy World Corporation Limited (the "Company") solely for information use during this presentation. These materials may not be copied, reproduced, passed on or redistributed, directly or indirectly, to any other person (wheth
Slide 4: Introduction - Asia's Appetite for Energy
Introduction - Asia’s Appetite for Energy kWh 0 2000 4000 6000 8000 10000 12000 14000 16000 For personal use only United States: 13351 Australia: 11193 New Zealand: 8937 Singapore: 8170 Japan: 8072 South Korea: 7391 Energy World Corporation has always Germany: 7029 United Kingdom: 6206 positioned it
Slide 5: Our LNG Plan for Asia
Our LNG Plan for Asia For personal use only Targeted LNG Consumption CHINA JAPAN INDONESIA THE PHILIPPINES LNG to ASIA Our Proposed LNG Production PAPUA NEW GUINEA and AUSTRALIA OTHER ASIA 2 MTPA modular LNG currently under 2 MTPA modular LNG currently under development (expansion to 5 MTPA) develop
Slide 6: Our Target
Our Target For personal use only To become a leader in modular LNG development and a significant supplier of natural gas to Asian markets Pagbilao Hub Terminal 300MW Power Station Sri Lanka 600MW Power Station Sengkang LNG Hub 2-5MTPA LNG Terminal Manila Papua New Guinea 2-5MTPA LNG Terminal and Dee
Slide 7: Clean and Green Energy
Clean and Green Energy For personal use only • Increasing concern over “global warming” has led to pollution and emission caps, LNG is reduction goals and carbon trading considered to be • Natural gas is a cleaner and more efficient fossil fuel a source of - For an equivalent amount of heat, burning
Slide 8: Development of Modular LNG
Development of Modular LNG For personal use only EWC developed EWC approached Australia’s first EWC decided LNG liquefaction EWC ordered a FEED domestic LNG plant was the best way to equipment makers Study to design a over 18 years ago supply Asia’s growing asking for their standard modular ½ (Alice
Slide 9: Teaming Up with Industry Leaders on Modular LNG
Teaming Up with Industry Leaders on Modular LNG EWC has brought together distinguished global players and strong partners such as Chart For personal use only Industries and Chemicals and Siemens to develop an efficient, electric drive modular LNG system that can be used in a variety of locations. EN
Slide 10: Our Standard Modular LNG Landscape
Our Standard Modular LNG Landscape For personal use only 8
Slide 11: Benefits of All Electric LNG Trains
Development of Modular LNG For personal use only Benefits of All Electric LNG Trains Continuous full load operation possible for 5 to 6 years Up to 25 days additional production each year Lower greenhouse gas and noise emissions OPEX, MAINTEX reduction Compressor string independent in size, speed an
Slide 12: Development of Modular LNG
Development of Modular LNG For personal use only E-LNG allows for a simple, elegant Liquefaction setup with a relatively small footprint. Through innovative design, EWC has downsized typical LNG train sizes – we are moving from the grandfather clock to the pocket watch. By using a standard design, m
Slide 13: Development of Modular LNG
Development of Modular LNG For personal use only 11
Slide 14: Development of Modular LNG
Development of Modular LNG For personal use only 12
Slide 15: Development of Modular LNG
Development of Modular LNG For personal use only 13
Slide 16: Development of Modular LNG
Development of Modular LNG For personal use only Standard, shop-fabricated liquefaction plants will grow less expensive per ton of capacity, whereas mega-scale projects have leapt in cost from $500 per metric Supplies of LNG are ton to more than $1,000 per ton. going to grow in the next few years, b
Slide 17: LNG Marine Loading Arms
Development of Modular LNG LNG Marine Loading Arms For personal use only 15
Slide 18: Development of Modular LNG
Development of Modular LNG EWC has secured a License from GTT – Gaztransport & Technigaz to Energy agencies For personal use only use its LNG tank technology for land based membrane tanks are forecasting significant increases in natural gas demand during the next 20 years. The largest increments in
Slide 19: Development of Modular LNG
Development of Modular LNG For personal use only 17
Slide 20: Economic and Operational Benefits of E-LNG
Development of Modular LNG For personal use only Economic Benefits of E-LNG Operational & HSE Benefits of E-LNG Maximize productivity & asset utilization Adjustable throughput &load distribution Production capacity independent of Motors & compressors are inherently ambient temperature adjustable Thr
Slide 21: Indonesia – Sengkang LNG Project
Our LNG Projects Indonesia – Sengkang LNG Project For personal use only Electric Motor Compressor Drive Gear South Sulawesi LNG: Box Site acquired Major equipment purchased and the majority is ready for shipping 19
Slide 22: Indonesia – Sengkang LNG Project
Our LNG Projects Indonesia – Sengkang LNG Project For personal use only Compressor Electric Motor Drive Gear Box 20
Slide 23: Indonesia – Sengkang LNG Project
Our LNG Projects Indonesia – Sengkang LNG Project For personal use only Sengkang 2-5MTPA LNG Terminal CPP Kam pung Baru LNG Loading Terminal LNG Plant Site Bongo 01 Walanga 02 Power Plant SENGKANG Power Station For LNG Plants 21
Slide 24: Australia – Abbot Point LNG Project
Our LNG Projects Australia – Abbot Point LNG Project For personal use only Australia Unlocking Queensland Gas Assets Queensland • Port of Abbot Point Location • Existing deep-water coal export terminal Community • An opportunity for many smaller gas exploration companies in Opportunity Queensland to
Slide 25: Australia – Queensland Gas Highway
Our LNG Projects Australia – Queensland Gas Highway For personal use only 23
Slide 26: Our Projects – Pipelines – Diversified Construction Corporation
Our Projects – Pipelines – Diversified Construction Corporation For personal use only 24
Slide 27: Our Proposed LNG Plant and Power Station
Our Proposed LNG Plant and Power Station For personal use only Abbot Point Proposed LNG Plant & Power Station: Proposed Initial capacity 2 MTPA LNG Jetty Water Depth 13 M+ Future expansion to 5 MTPA Gas supply from EWC owned and operated gas fields via the Qld Gas Highway Proposed LNG Plant Proposed
Slide 28: Papua New Guinea – Western Province LNG Project
Our LNG Projects Papua New Guinea – Western Province LNG Project For personal use only Parama Island LNG: • Initial capacity 2 MTPA • Future expansion to 5 MTPA • LNG Terminal will be developed in conjunction with a deep water port and power station. 26
Slide 29: Papua New Guinea – Development Projects in Gulf Province
Our LNG Projects Papua New Guinea – Development Projects in Gulf Province For personal use only Proposal LNG Terminal Deep Water Port Petroleum Refinery Power Station 27
Slide 30: Papua New Guinea – Gulf Province LNG Project – Signing Agreement
Our LNG Projects Papua New Guinea – Gulf Province LNG Project – Signing Agreement In Conjunction with Energy World International Limited For personal use only Gulf Province Developments: • Natural gas supply pipeline • 2 - 5 MTPA LNG production facility • LNG Terminal will be developed in conjunctio
Slide 31: The Philippines – LNG Hub
Our LNG Projects The Philippines – LNG Hub For personal use only Pagbilao LNG Terminal: Pagbilao Hub Terminal Terminal will act as a hub for onward distribution of LNG throughout the Philippines PHILIPPINES EWC will develop a CCGT power station at this site First LNG Terminal with 3 x 100 MW Combine
Slide 32: Sri Lanka – Hambantota LNG Hub
Our LNG Projects Sri Lanka – Hambantota LNG Hub For personal use only Hambantota LNG Hub: • This terminal will act as a hub for onward distribution of LNG throughout Sri Lanka • EWC will develop a CCGT power station at this site • Substantial development of this port is already underway 30
Slide 33: Development of Floating Modular LNG
Development of Floating Modular LNG LNG Storage Ship For personal use only 31
Slide 34: Ship Solution for Floating LNG
3 Ship Solution for Floating LNG For personal use only Based on the standard EWC LNG ship – EWC developed 3 ship solution for Floating LNG. LNG Support Ship - Gas pretreatment and power generation is located on the first ship. LNG Liquefaction Ship - Liquefaction (2 x 500,000 TPA) trains the standar
Slide 35: Development of Floating Modular LNG
Development of Floating Modular LNG LNG Liquefaction Ship 2 x 500,000 TPA For personal use only 33
Slide 36: Benefits of the Ship Floating Modular LNG
Benefits of the 3 Ship Floating Modular LNG For personal use only This is a buildable solution based around well developed technology Smaller ships with shallower draft allow for greater flexibility in location In the event of bad weather, all 3 ships can be moved to a safe harbour Insurance and ove
Slide 37: Key Attributes of Our Company
Key Attributes of Our Company For personal use only Ownership of Strategic Gas and Power Resources in Strategic Locations 1 Market Leading Position to Exploit Stranded Gas Fields Using Modular LNG Train Configuration 2 Committed LNG Project to be Commissioned from 2010 3 Stable Revenue Stream from O
Slide 38: LNG to the Asian Market
LNG to the Asian Market For personal use only 36
Slide 39: Presentation to JM Financial Group Ltd
For personal use only ENERGY WORLD CORPORATION Presentation to JM Financial Group Ltd 19 June 2009 Presented By Mr. Stewart W.G. Elliott Managing Director and Chief Executive Officer Energy World Corporation Ltd.
Slide 40: Disclaimer
Disclaimer For personal use only • These materials have been prepared by Energy World Corporation Limited (the "Company") solely for information use during this presentation. These materials may not be copied, reproduced, passed on or redistributed, directly or indirectly, to any other person (wheth
Slide 41: Introduction - Asia's Appetite for Energy
Introduction - Asia’s Appetite for Energy kWh 0 2000 4000 6000 8000 10000 12000 14000 16000 For personal use only United States: 13351 Australia: 11193 New Zealand: 8937 Singapore: 8170 Japan: 8072 South Korea: 7391 Energy World Corporation has always Germany: 7029 United Kingdom: 6206 positioned it
Slide 42: Our LNG Plan for Asia
Our LNG Plan for Asia For personal use only Targeted LNG Consumption CHINA JAPAN INDONESIA THE PHILIPPINES LNG to ASIA Our Proposed LNG Production PAPUA NEW GUINEA and AUSTRALIA OTHER ASIA 2 MTPA modular LNG currently under 2 MTPA modular LNG currently under development (expansion to 5 MTPA) develop
Slide 43: Our Target
Our Target For personal use only To become a leader in modular LNG development and a significant supplier of natural gas to Asian markets Pagbilao Hub Terminal 300MW Power Station Sri Lanka 600MW Power Station Sengkang LNG Hub 2-5MTPA LNG Terminal Manila Papua New Guinea 2-5MTPA LNG Terminal and Dee
Slide 44: Clean and Green Energy
Clean and Green Energy For personal use only • Increasing concern over “global warming” has led to pollution and emission caps, LNG is reduction goals and carbon trading considered to be • Natural gas is a cleaner and more efficient fossil fuel a source of - For an equivalent amount of heat, burning
Slide 45: Development of Modular LNG
Development of Modular LNG For personal use only EWC developed EWC approached Australia’s first EWC decided LNG liquefaction EWC ordered a FEED domestic LNG plant was the best way to equipment makers Study to design a over 18 years ago supply Asia’s growing asking for their standard modular ½ (Alice
Slide 46: Teaming Up with Industry Leaders on Modular LNG
Teaming Up with Industry Leaders on Modular LNG EWC has brought together distinguished global players and strong partners such as Chart For personal use only Industries and Chemicals and Siemens to develop an efficient, electric drive modular LNG system that can be used in a variety of locations. EN
Slide 47: Our Standard Modular LNG Landscape
Our Standard Modular LNG Landscape For personal use only 8
Slide 48: Benefits of All Electric LNG Trains
Development of Modular LNG For personal use only Benefits of All Electric LNG Trains Continuous full load operation possible for 5 to 6 years Up to 25 days additional production each year Lower greenhouse gas and noise emissions OPEX, MAINTEX reduction Compressor string independent in size, speed an
Slide 49: Development of Modular LNG
Development of Modular LNG For personal use only E-LNG allows for a simple, elegant Liquefaction setup with a relatively small footprint. Through innovative design, EWC has downsized typical LNG train sizes – we are moving from the grandfather clock to the pocket watch. By using a standard design, m
Slide 50: Development of Modular LNG
Development of Modular LNG For personal use only 11
Slide 51: Development of Modular LNG
Development of Modular LNG For personal use only 12
Slide 52: Development of Modular LNG
Development of Modular LNG For personal use only 13
Slide 53: Development of Modular LNG
Development of Modular LNG For personal use only Standard, shop-fabricated liquefaction plants will grow less expensive per ton of capacity, whereas mega-scale projects have leapt in cost from $500 per metric Supplies of LNG are ton to more than $1,000 per ton. going to grow in the next few years, b
Slide 54: LNG Marine Loading Arms
Development of Modular LNG LNG Marine Loading Arms For personal use only 15
Slide 55: Development of Modular LNG
Development of Modular LNG EWC has secured a License from GTT – Gaztransport & Technigaz to Energy agencies For personal use only use its LNG tank technology for land based membrane tanks are forecasting significant increases in natural gas demand during the next 20 years. The largest increments in
Slide 56: Development of Modular LNG
Development of Modular LNG For personal use only 17
Slide 57: Economic and Operational Benefits of E-LNG
Development of Modular LNG For personal use only Economic Benefits of E-LNG Operational & HSE Benefits of E-LNG Maximize productivity & asset utilization Adjustable throughput &load distribution Production capacity independent of Motors & compressors are inherently ambient temperature adjustable Thr
Slide 58: Indonesia – Sengkang LNG Project
Our LNG Projects Indonesia – Sengkang LNG Project For personal use only Electric Motor Compressor Drive Gear South Sulawesi LNG: Box Site acquired Major equipment purchased and the majority is ready for shipping 19
Slide 59: Indonesia – Sengkang LNG Project
Our LNG Projects Indonesia – Sengkang LNG Project For personal use only Compressor Electric Motor Drive Gear Box 20
Slide 60: Indonesia – Sengkang LNG Project
Our LNG Projects Indonesia – Sengkang LNG Project For personal use only Sengkang 2-5MTPA LNG Terminal CPP Kam pung Baru LNG Loading Terminal LNG Plant Site Bongo 01 Walanga 02 Power Plant SENGKANG Power Station For LNG Plants 21
Slide 61: Australia – Abbot Point LNG Project
Our LNG Projects Australia – Abbot Point LNG Project For personal use only Australia Unlocking Queensland Gas Assets Queensland • Port of Abbot Point Location • Existing deep-water coal export terminal Community • An opportunity for many smaller gas exploration companies in Opportunity Queensland to
Slide 62: Australia – Queensland Gas Highway
Our LNG Projects Australia – Queensland Gas Highway For personal use only 23
Slide 63: Our Projects – Pipelines – Diversified Construction Corporation
Our Projects – Pipelines – Diversified Construction Corporation For personal use only 24
Slide 64: Our Proposed LNG Plant and Power Station
Our Proposed LNG Plant and Power Station For personal use only Abbot Point Proposed LNG Plant & Power Station: Proposed Initial capacity 2 MTPA LNG Jetty Water Depth 13 M+ Future expansion to 5 MTPA Gas supply from EWC owned and operated gas fields via the Qld Gas Highway Proposed LNG Plant Proposed
Slide 65: Papua New Guinea – Western Province LNG Project
Our LNG Projects Papua New Guinea – Western Province LNG Project For personal use only Parama Island LNG: • Initial capacity 2 MTPA • Future expansion to 5 MTPA • LNG Terminal will be developed in conjunction with a deep water port and power station. 26
Slide 66: Papua New Guinea – Development Projects in Gulf Province
Our LNG Projects Papua New Guinea – Development Projects in Gulf Province For personal use only Proposal LNG Terminal Deep Water Port Petroleum Refinery Power Station 27
Slide 67: Papua New Guinea – Gulf Province LNG Project – Signing Agreement
Our LNG Projects Papua New Guinea – Gulf Province LNG Project – Signing Agreement In Conjunction with Energy World International Limited For personal use only Gulf Province Developments: • Natural gas supply pipeline • 2 - 5 MTPA LNG production facility • LNG Terminal will be developed in conjunctio
Slide 68: The Philippines – LNG Hub
Our LNG Projects The Philippines – LNG Hub For personal use only Pagbilao LNG Terminal: Pagbilao Hub Terminal Terminal will act as a hub for onward distribution of LNG throughout the Philippines PHILIPPINES EWC will develop a CCGT power station at this site First LNG Terminal with 3 x 100 MW Combine
Slide 69: Sri Lanka – Hambantota LNG Hub
Our LNG Projects Sri Lanka – Hambantota LNG Hub For personal use only Hambantota LNG Hub: • This terminal will act as a hub for onward distribution of LNG throughout Sri Lanka • EWC will develop a CCGT power station at this site • Substantial development of this port is already underway 30
Slide 70: Development of Floating Modular LNG
Development of Floating Modular LNG LNG Storage Ship For personal use only 31
Slide 71: Ship Solution for Floating LNG
3 Ship Solution for Floating LNG For personal use only Based on the standard EWC LNG ship – EWC developed 3 ship solution for Floating LNG. LNG Support Ship - Gas pretreatment and power generation is located on the first ship. LNG Liquefaction Ship - Liquefaction (2 x 500,000 TPA) trains the standar
Slide 72: Development of Floating Modular LNG
Development of Floating Modular LNG LNG Liquefaction Ship 2 x 500,000 TPA For personal use only 33
Slide 73: Benefits of the Ship Floating Modular LNG
Benefits of the 3 Ship Floating Modular LNG For personal use only This is a buildable solution based around well developed technology Smaller ships with shallower draft allow for greater flexibility in location In the event of bad weather, all 3 ships can be moved to a safe harbour Insurance and ove
Slide 74: Key Attributes of Our Company
Key Attributes of Our Company For personal use only Ownership of Strategic Gas and Power Resources in Strategic Locations 1 Market Leading Position to Exploit Stranded Gas Fields Using Modular LNG Train Configuration 2 Committed LNG Project to be Commissioned from 2010 3 Stable Revenue Stream from O
Slide 75: LNG to the Asian Market
LNG to the Asian Market For personal use only 36