  1. Slide 1: Engebø project presentation 2013

    Slide 1: Engebø project presentation 2013

    Engebø project presentation 2013 Exploration and production of high-end minerals and metals Nordic Mining ASA | N-0250 Oslo | Norway | Tel +47 22 94 77 90 | Fax +47 22 94 77 01 | Org. no 989 796 739 | post@nordicmining.com

  2. Slide 2: Engebø, a unique titanium rutile project (100%)

    Slide 2: Engebø, a unique titanium rutile project (100%)

    Engebø titanium project Engebø, a unique titanium rutile project (100%) Project highlights Key features  JORC resource of 154M tonnes @ 3.8% TiO2*  Large, high grade resource  Historical estimate of 383M tonnes @ 3.96% TiO2  Low on radioactive elements  50 years expected mine life  Main infras

  3. Slide 3: The rutile process from mine to consumer

    Slide 3: The rutile process from mine to consumer

    Engebø titanium project The rutile process from mine to consumer Mining Processing End use  Rutile is mined from ore or  Rutile is processed through  Majority of TiO2 feedstocks are mineral sands producing a rutile chlorination in reactors which used in production of pigment in concentrate produc

  4. Slide 4: The rutile process from mine to consumer

    Slide 4: The rutile process from mine to consumer

    Engebø titanium project The rutile process from mine to consumer Mining Processing End use  Rutile is mined from ore or  Rutile is processed through  Majority of TiO2 feedstocks are mineral sands producing a rutile chlorination in reactors which used in production of pigment in concentrate produc

  5. Slide 5: The highest rutile grade and lowest impurity content

    Slide 5: The highest rutile grade and lowest impurity content

    Engebø titanium The highest rutile grade and lowest impurity content project Rutile grade for current TiO2 producers and planned projects Engebø 3.77% Murray Basin ‐ Iluka 2.32% Cerro Blanco 2.10% Akonolinga (Years 1‐6) 1.66% Project Sierra Rutile 1.42% Producer Akonolinga 1.15% Kwale 0.65% Snapper

  6. Slide 6: Engebø is among the largest rutile deposits in the world

    Slide 6: Engebø is among the largest rutile deposits in the world

    Engebø is among the largest rutile deposits in the world Rutile projects grade and target production 4,50% Engebø 4,00% 3,50% Murray Basin 3,00% Rutile (%) Cerro Blanco 2,50% 2,00% Sierra Rutile 1,50% Coburn Donald 1,00% Ranobe Planning Kwale 0,50% Moma Construction 0,00% Production -0,50% Grande Co

  7. Slide 7: Long sea freights underpin attractiveness of new European supply

    Slide 7: Long sea freights underpin attractiveness of new European supply

    Engebø titanium Long sea freights underpin attractiveness of new European 22% project supply 8% 5% 8% Norway 5% Canada Ukraine US 5% China 5% 3% India 19% 20% Vietnam Sierra Leone Australia South Africa Rutile producer Ilmenite producer Cylinder indicates % of world TiO2 feedstock production Zimbabw

  8. Slide 8: European pigment majors will be future customers

    Slide 8: European pigment majors will be future customers

    Engebø titanium project European pigment majors will be future customers Regional, stable supply brings customer benefits  Substantial freight reduction compared to existing supply  Plant-to-plant shipment operation  Simple logistics improves working capital, storage and planning  Several Europe

  9. Slide 9: New price level for rutile; tight supply/demand balance

    Slide 9: New price level for rutile; tight supply/demand balance

    Engebø titanium New price level for rutile; tight supply/demand balance project Rutile price (95% TiO2, FOB Australia)1 Titanium feedstock supply/demand2 000’ TiO2 units  Legacy contracts with fixed prices at low levels expiring  New contracts on 6 months basis  Long-term pricing to be in line wi

  10. Slide 10: Well defined deposit and efficient mining scenario

    Slide 10: Well defined deposit and efficient mining scenario

    Engebø titanium project Well defined deposit and efficient mining scenario JORC Resource* 3D block model of the Engebø ore body Resource class Mill tonnes TiO2% @ JORC 3% cut-off Indicated 31.7 3.77 Inferred 122.6 3.75 Total 154.3 3.77  Total JORC resource of 154 M tonnes @ 3.77% TiO2  Historical

  11. Slide 11: Favourable project logistics and configuration

    Slide 11: Favourable project logistics and configuration

    Engebø titanium Favourable project logistics and configuration project 823400 N 823300 N 823200 N 823100 N 823000 N 822900 N 822800 N 822700 N 822600 N 822500 N 822400 N 822300 N 822200 N 822100 N 822000 N 821900 N 821800 N 821700 N 500 Elev 500 Elev 400 Elev 400 Elev 300 Elev Open pit 300 Elev 200

  12. Slide 12: Preliminary capital cost estimate

    Slide 12: Preliminary capital cost estimate

    Engebø titanium project Preliminary capital cost estimate Capex estimate (USDm) Outline of Engebø industrial plant Royalties & land acquisition 13 Infrastructure & civil 83 Mine 17 Crushing facility 22 Wet process package 107 Dry process package 55 Laboratory and others 4 ---------------------------

  13. Slide 13: Preliminary project financial estimates

    Slide 13: Preliminary project financial estimates

    Engebø titanium Preliminary project financial estimates * project Main assumptions Key figures CAPEX: USD 300m NPV @ 8% WACC: USD 466m (after tax) Rutile recovery rate: 55% IRR 20.7% Ore production: 4 million tonnes p.a. Payback time: 4.5 years Rutile production: 87,000 tonnes p.a. EBITDA % open pit

  14. Slide 14: Final stage of permitting agreed with the authorities

    Slide 14: Final stage of permitting agreed with the authorities

    Engebø titanium project Final stage of permitting agreed with the authorities Supplementary investigation program clarified with the Ministry of the Environment  Additional documentation of water circulation in the fjord and assessment of risk regarding distribution of finer particles  Additional