Nordic Mining ASA · OSL:NOM
Nordic Mining ASA — Investor Presentation (2013)
14 slides from Nordic Mining ASA's investor presentation, 2013

Slide 1: Engebø project presentation 2013
Engebø project presentation 2013 Exploration and production of high-end minerals and metals Nordic Mining ASA | N-0250 Oslo | Norway | Tel +47 22 94 77 90 | Fax +47 22 94 77 01 | Org. no 989 796 739 | post@nordicmining.com

Slide 2: Engebø, a unique titanium rutile project (100%)
Engebø titanium project Engebø, a unique titanium rutile project (100%) Project highlights Key features JORC resource of 154M tonnes @ 3.8% TiO2* Large, high grade resource Historical estimate of 383M tonnes @ 3.96% TiO2 Low on radioactive elements 50 years expected mine life Main infras

Slide 3: The rutile process from mine to consumer
Engebø titanium project The rutile process from mine to consumer Mining Processing End use Rutile is mined from ore or Rutile is processed through Majority of TiO2 feedstocks are mineral sands producing a rutile chlorination in reactors which used in production of pigment in concentrate produc

Slide 4: The rutile process from mine to consumer
Engebø titanium project The rutile process from mine to consumer Mining Processing End use Rutile is mined from ore or Rutile is processed through Majority of TiO2 feedstocks are mineral sands producing a rutile chlorination in reactors which used in production of pigment in concentrate produc

Slide 5: The highest rutile grade and lowest impurity content
Engebø titanium The highest rutile grade and lowest impurity content project Rutile grade for current TiO2 producers and planned projects Engebø 3.77% Murray Basin ‐ Iluka 2.32% Cerro Blanco 2.10% Akonolinga (Years 1‐6) 1.66% Project Sierra Rutile 1.42% Producer Akonolinga 1.15% Kwale 0.65% Snapper

Slide 6: Engebø is among the largest rutile deposits in the world
Engebø is among the largest rutile deposits in the world Rutile projects grade and target production 4,50% Engebø 4,00% 3,50% Murray Basin 3,00% Rutile (%) Cerro Blanco 2,50% 2,00% Sierra Rutile 1,50% Coburn Donald 1,00% Ranobe Planning Kwale 0,50% Moma Construction 0,00% Production -0,50% Grande Co

Slide 7: Long sea freights underpin attractiveness of new European supply
Engebø titanium Long sea freights underpin attractiveness of new European 22% project supply 8% 5% 8% Norway 5% Canada Ukraine US 5% China 5% 3% India 19% 20% Vietnam Sierra Leone Australia South Africa Rutile producer Ilmenite producer Cylinder indicates % of world TiO2 feedstock production Zimbabw

Slide 8: European pigment majors will be future customers
Engebø titanium project European pigment majors will be future customers Regional, stable supply brings customer benefits Substantial freight reduction compared to existing supply Plant-to-plant shipment operation Simple logistics improves working capital, storage and planning Several Europe

Slide 9: New price level for rutile; tight supply/demand balance
Engebø titanium New price level for rutile; tight supply/demand balance project Rutile price (95% TiO2, FOB Australia)1 Titanium feedstock supply/demand2 000’ TiO2 units Legacy contracts with fixed prices at low levels expiring New contracts on 6 months basis Long-term pricing to be in line wi

Slide 10: Well defined deposit and efficient mining scenario
Engebø titanium project Well defined deposit and efficient mining scenario JORC Resource* 3D block model of the Engebø ore body Resource class Mill tonnes TiO2% @ JORC 3% cut-off Indicated 31.7 3.77 Inferred 122.6 3.75 Total 154.3 3.77 Total JORC resource of 154 M tonnes @ 3.77% TiO2 Historical

Slide 11: Favourable project logistics and configuration
Engebø titanium Favourable project logistics and configuration project 823400 N 823300 N 823200 N 823100 N 823000 N 822900 N 822800 N 822700 N 822600 N 822500 N 822400 N 822300 N 822200 N 822100 N 822000 N 821900 N 821800 N 821700 N 500 Elev 500 Elev 400 Elev 400 Elev 300 Elev Open pit 300 Elev 200

Slide 12: Preliminary capital cost estimate
Engebø titanium project Preliminary capital cost estimate Capex estimate (USDm) Outline of Engebø industrial plant Royalties & land acquisition 13 Infrastructure & civil 83 Mine 17 Crushing facility 22 Wet process package 107 Dry process package 55 Laboratory and others 4 ---------------------------

Slide 13: Preliminary project financial estimates
Engebø titanium Preliminary project financial estimates * project Main assumptions Key figures CAPEX: USD 300m NPV @ 8% WACC: USD 466m (after tax) Rutile recovery rate: 55% IRR 20.7% Ore production: 4 million tonnes p.a. Payback time: 4.5 years Rutile production: 87,000 tonnes p.a. EBITDA % open pit

Slide 14: Final stage of permitting agreed with the authorities
Engebø titanium project Final stage of permitting agreed with the authorities Supplementary investigation program clarified with the Ministry of the Environment Additional documentation of water circulation in the fjord and assessment of risk regarding distribution of finer particles Additional
Source: Internet Archive copy of nordicmining.com
More decks from Nordic Mining ASA
Q2 2026 Earnings Presentation16 slides · Aug 18, 2026
Corporate Update (August 2026)20 slides · Aug 7, 2026
Q1 2026 Earnings Presentation17 slides · May 12, 2026
Q4 2025 Earnings Presentation20 slides · Feb 4, 2026
Investor Presentation (January 2026)61 slides · January 2026
Q3 2025 Earnings Presentation18 slides · Oct 31, 2025