Tertiary Minerals Plc · LSE:TYM
Tertiary Minerals — Investor Presentation (February 2016)
22 slides from Tertiary Minerals's investor presentation, Feb 24, 2016
Slide 1: Building a Strategic Position in the Fluorspar Sector
Building a Strategic Position in the Fluorspar Sector Company Presentation 24 February 2016
Slide 2: Disclaimer
Disclaimer The content of information contained in these slides and the accompanying verbal presentation (together, the “Presentation”) has not been approved by an authorised person within the meaning of the Financial Services and Markets Act 2000 (“FSMA”). Reliance upon this Presentation for the pu
Slide 3: Board of Directors
Board of Directors 1. Patrick Cheetham, Executive Chairman Geologist. 34 years’ experience in mineral exploration. 29 years’ experience in public company management. Founder of the Company, Dragon Mining Ltd, Archaean Gold NL and Sunrise Resources plc. 4 5 1 2 3 2. Richard Clemmey, Managing
Slide 4: Company's Aims, Strategy and Business Plan
Company’s Aims, Strategy and Business Plan Company’s Opportunity in Fluorspar (CaF2) • Fluorspar is an essential raw material in the basic chemical, steel and aluminium industries and in a growing number of high-tech green technologies and pharmaceutical applications. • Fluorspar has a growing econo
Slide 5: Fluorspar Market
Fluorspar Market • Major Producing regions: China (>50% of the world’s Average Acid-spar Prices 2000-2016 US$/t production); Mexico; Mongolia/CIS; South Africa; Vietnam 600 • China exports have declined substantially since 2000 500 Price US$/t 400 driven by increasing internal demand and production/
Slide 6: Strategic Project Locations and Performance
Strategic Project Locations and Performance • Three 100% owned fluorspar projects strategically located in the USA and Europe • Maintained momentum with the development of its projects through the mining cycle in line with its aims and strategy • The Company has continued to increased its fluorspar
Slide 7: Sweden - Storuman Fluorspar Project
Sweden - Storuman Fluorspar Project Excellent Location & Infrastructure • Adjacent to the main E12 highway • Storuman town and new bulk rail terminal – 25 km • Road and rail linked to Umeå Port – 240 km Umeå Lars Lind 7
Slide 8: Storuman Fluorspar Project Positive Scoping Study
Storuman Fluorspar Project Positive Scoping Study – Scott Wilson Tonnage/grade in pit (non-JORC) 18mt @12.3% CaF2 Strip Ratio 2.2:1 Mining Rate c. 1 million tpa Fluorspar Price (CIF Rotterdam) $US 357/tonne Average Annual Production Acid Grade Fluorspar 103,000 tpa Mine Life 18 years Initial Capital
Slide 9: Storuman Fluorspar Project Milestones
Storuman Fluorspar Project 2014 & 2015 Milestones • Preparation and submission of Exploitation (Mine) Permit application – Completed Q2 2014 • Ongoing Preliminary Feasibility Study (PFS) metallurgical testwork, optimisation and constructive end user discussions and plant visits 2016 Target Milestone
Slide 10: Storuman Target - Medium Scale Global Producer
Storuman Fluorspar Project Storuman Target - Medium Scale Global Producer Storuman vs Leading Producers 2012 1,200,000 Production rate of 103,000 tpa: 1,000,000 • Medium Scale Global Producer 800,000 • Production (t) A Leading European Producer 600,000 • Resource base will support future expansion 4
Slide 11: Storuman Mining and Processing
Storuman Fluorspar Project Mining and Processing • Low waste : ore ratio and horizontal ore horizons with no fluorspar mineralisation in the granite basement lends itself to cut and fill mining technique (progressive restoration) • Processing method is common in the mining industry – not bespoke Ope
Slide 12: Norway - Lassedalen Fluorspar Project
Norway - Lassedalen Fluorspar Project Excellent Location & Infrastructure • 500 m from highway E134 & Railway • 6 km from famous silver mining town of Kongsberg • 50 km from Port of Drammen • 80 km SW of City of Oslo 12
Slide 13: Lassedalen History and Geology
Lassedalen Fluorspar Project History and Geology • Steeply dipping fluorspar vein system in 4 km long vein breccia zone • Drilled by Norsk Hydro in the 1970’s – 28 diamond holes • Proved vein over 2.7 km strike length • Open at depth and along strike 13
Slide 14: Lassedalen Milestones Achieved
Lassedalen Fluorspar Project Milestones Achieved • Positive Scoping Study (Wardell Armstrong International) – 2012. Base Case Extended Mine Case Tonnage Mined (Underground) 3.6mt @ 22.4% Fluorspar 4.5mt @22.4% Fluorspar Mining Rate 543,000 tpa 543,000 tpa Fluorspar Price (CIF Rotterdam) $US 491/tonn
Slide 15: USA - MB Fluorspar Project
USA - MB Fluorspar Project Nevada - Most Favourable Mining Jurisdiction in the USA • Located 19 km SW of Eureka, Eureka County, Nevada • 46 Mining Claims >2,800 acres • Trans-national road and rail links, rail 161 km from the project location • 780 km to port of San Francisco • Road access to and ov
Slide 16: MB Fluorspar Project 2013 – 2015 Milestones
MB Fluorspar Project 2013 – 2015 Milestones • Phase 1&2 drilling programmes 26 holes, 3220 metres • Large Maiden JORC Compliant Mineral Resource Estimate – completed April 2014. Classification Million Tonnes (Mt) Fluorspar (CaF2%) Indicated (8% CaF2 cut-off) 8.9 10.3 Inferred (8% CaF2 cut-off) 29.
Slide 17: MB Project - 3D Model Display
MB Fluorspar Project MB Project - 3D Model Display Mineralisation at 9% Cut-off and Optimised Pitshell LELT | fits ;® | ie Sa / ey 17
Slide 18: MB Fluorspar Project 2015 & 2016 Milestones
MB Fluorspar Project 2015 & 2016 Milestones • 166 line-km ground magnetic survey completed • Phase 4 drilling programme - Highlights 4 holes, 1,553 metres • Hole 15TMBRC036 – 484m: 89.91m grading 12.02% CaF2 from 120.40m depth (total of 8 significant fluorspar intersections) Including 31.99m g
Slide 19: MB Fluorspar Project 2016 Target Milestones
MB Fluorspar Project 2016 Target Milestones2 • Phase 4 Drilling completed 4 holes, 1553 metres • Progress onto next phases of development: Metallurgical testwork Economic modelling Scoping Study Mine Permit planning Note 2: All target schedules are subject to change, funding and successful
Slide 20: Non-Core Projects
Non-Core Projects • Kaaresselkä & Kiekerömaa - Gold, Finland Kaaresselkä licence renewal granted in March 2013, expiry March 2016 – renewal application submitted Kiekerömaa licence renewal granted in April 2014, expiry April 2017 No material work planned, continue to seek potential partners or
Slide 21: Investment Case
Investment Case Tertiary Minerals plc - The only UK public traded company offering an exciting exposure to fluorspar – a critical and strategic mineral with the USA and Europe facing a potential risk of security of supply • Three 100% owned fluorspar assets strategically located in the USA and Europ
Slide 22: Thank You For Your Time and Support
Building a Strategic Position in the Fluorspar Sector THANK YOU FOR YOUR TIME AND SUPPORT Nominated Adviser & Joint Broker Joint Broker Tertiary Minerals plc S P Angel Corporate Finance LLP Beaufort Securities Ltd Richard Clemmey/ Ewan Leggat/ Jon Belliss/ Patrick Cheetham Tercel Moore Elliot Hance
Tertiary Minerals — Investor Presentation (February 2016) on 6ix